    Order in Determination of Final Tariff for Maneri Bhali Stage II Large Hydro Power Project u/s 62(1)(a) and 86 of the Electricity Act, 2003
    Accessible Version : View (200 KB) 
    Order inApplication of Vanala Small Hydro Project of 15 MW in District Chamoli for grant of permission of Open Access for carrying electricity from Vanala SHP to outside the State of Uttarakhand
    Accessible Version : View (597 KB) 
    Order inApplication of Swasti Power Engineering Limited in respect of its Bhilangana Hydro Power Project (BHPP) (3 x 7.5 MW) generating station for grant of open access for evacuation of power
    Accessible Version : View (557 KB) 
    Order in Electrocution of Sh. Usman, Dehradun on 09.09.2009
    Accessible Version : View (254 KB) 
    Order in Application for Approval of the Commission for the Investment on the Project covering the Construction of 16 new 33 & 11 kV Sub-Stations and their Associated Lines
    Accessible Version : View (156 KB) 
    Order in One-Time Checking & Correction of Metering System of KCC Consumers and Monthly Monitoring of their Billing MRI Data
    Accessible Version : View (161 KB) 
    Order inViolation of Provisions of IE Rules 1956 and Proper Neutral Grounding, Earthing and Protective System
    Accessible Version : View (835 KB) 
    Order in Electrocution of Sh. Bhagwant Lal, Village- Aholi Sunar (Syali), Almora on 13-14.08.2008
    Accessible Version : View (234 KB) 
    Order in Complaint filed by Shri A.S. Bisht with regard to Routing of LT Line at a very low height
    Accessible Version : View (234 KB) 
    Order inComplaint filed by Shri M.S. Bisht, Haridwar and Wrong Reporting in Division Wise Monthly Report on Release of New Connections
    Accessible Version : View (217 KB) 
    Order in Power Cut
    Accessible Version : View (204 KB) 
    Interim Order on Vanala SHP of 15 MW for grant of permission of Open Access for carrying Electricity.
    Accessible Version : View (135 KB) 
    Order on Works Charges for Enhancement or Reduction of Contracted Load for HT & EHT Connections to be charged by the Distribution Licensee
    Accessible Version : View (185 KB) 
    Payment of Security Deposit and Additional Security Deposit by way of Bank Guarantee or Letter of Credit
    Accessible Version : View (269 KB) 
    On Review Petition of Commission’s Order dated 18-03-2008 for FY 2007-08 & FY 2008-09
    Accessible Version : View (874 KB) 
    Order onNon-compliance of Section 59 of Electricity Act, 2003 and Regulation 5 of the UERC (Standards of Performance) Regulations, 2007
    Accessible Version : View (185 KB) 
    Order onfinalisation of Clause 6 of RTS-7
    Accessible Version : View (337 KB) 
    Order on Earthed Terminal and Installation & Maintaining records of Test Results
    Accessible Version : View (389 KB) 
    UERC’s Order on Neutral Grounding Earthing System
    Accessible Version : View (1 MB) 
    UERC’s order in the matter of Show cause notice dated 05.09.2008 in the matter of non compliance of regulation of the UERC (The Electricity Supply Code) Regulations 2007
    Accessible Version : View (117 KB) 
    In the matter of Complaint filed by Dr. Sarla Raman, for payment of compensation for delay in restoration of supply and replacement of burnt meter by UPCL.
    Accessible Version : View (75 KB) 
    UERC’s Order on Penalties imposed by UPCL on industries for excess usage of power during the restricted period effective from 31.12.2007 to 15.02.2008.
    Accessible Version : View (2 MB) 
    Commission’s order dated 30.8.2007 regarding waiver of late payment surcharge for recovery of electricity arrears outstanding against PTW consumers.
    Accessible Version : View (55 KB) 
    Order on Application seeking waiver of compensation payable by UPCL as per sub-regulation (3.3.4) of regulation 3.3 of the UERC (The Electricity Supply Code) Regulations, 2007.
    Accessible Version : View (79 KB) 
    Suo-moto proceedings for investigation of billing details of industrial consumers about 35 BHP of UPCL.
    Accessible Version : View (73 KB) 
    Order on Power Overdraw by UPCL from grid when grid frequency is below 49.5 Hz.
    Accessible Version : View (107 KB) 
    Application seeking extension of time of submission of Aggregate Revenue Requirement and Tariff Proposal for FY 2008-09
    Accessible Version : View (49 KB) 
    UPCL Proposal, seeking approval of the Commission on scheduled load shedding with immediate effect in the State of Uttarakhand for the period up to 15th January, 2008.
    Accessible Version : View (217 KB) 
    In the Matter of approval of Capital Investment under Para 11 of the Transmission and Bulk Supply License [License No. 1 of 2003].
    Accessible Version : View (73 KB) 
    in the matter of application seeking approval of the Commission regarding introduction of Scheme of waiver of Late Payment Surcharge for recovery of electricity arrears outstanding
    Accessible Version : View (95 KB) 
    Order on Show Cause Notice dated 13.04.2007 regarding supply of electricity to Industrial consumers on selective basis
    Accessible Version : View (171 KB) 
    Rate of Interest payable on Security Deposit of consumers.
    Accessible Version : View (94 KB) 
    No scheduled power cuts shall be allowed in the State except in the event of any direction in this regard from RLDC till concept paper is finalized.
    Accessible Version : View (47 KB) 
    Application seeking review of the Commission’s Order dated 22-12-2006 imposing penalty u/s 142 of the Electricity Act, 2003 for non-compliance of Commission’s
    Accessible Version : View (69 KB) 
    Application filed by Shri B.M. Verma, Chairman and Managing Director on behalf of UPCL, seeking time for complying with UERC (Release of New LT Connection Enhancement
    Accessible Version : View (84 KB) 
    Non compliance of Commission’s order for ToD meter in the State and hearing in the matter held on 20.12.2006.
    Accessible Version : View (118 KB) 
    Show Cause Notice dated 01.12.2006 issued to Shri B. M. Verma S/o Late Shri Walaiti Ram R/o 220, Vasant Vihar, Phase-II, Dehradun regarding non compliance of Commission’s Orders
    Accessible Version : View (116 KB) 
    The Commission has decided to get the issue of defective bills, investigated through an independent expert agency under section 128 of the Electricity Act, 2003
    Accessible Version : View (51 KB) 
    The Commission directs the committee and its member to ensure no delays in ongoing statutory investigation regarding some discrepancies in accounting of substantial surpluses
    Accessible Version : View (6 KB) 
    show cause why action should not be initiated against it for its failure to comply with orders of the Redressal Forum dated 14/17.12.2005 for refund of excess amount realised from consumers
    Accessible Version : View (11 KB) 
    Penalty imposed by UPCL and demanded by the Executive Engineer, Distribution Division (Rural) Dehradun for use of Electricity by the Petitioner during peak hours.
    Accessible Version : View (19 KB) 
    Final opportunity to UJVNL to submit tariff proposals along with detailed data on its costs for Generation tariff of UJVNL’s plants.
    Accessible Version : View (14 KB) 
    Detailed investigation of the issue of the surplus earned by the distribution licensee investigated under Section 128 of the Electricity Act, 2003.
    Accessible Version : View (5 KB) 
    Paper on “Approach to Initial Tariff for Generating Stations with capacity upto 1 MW” circulated on 08.09.2005 and in the matter of Tariff determination for hydro generating stations
    Accessible Version : View (21 KB) 
    Paper on “Approach to Initial Tariff for New Hydro Generating Stations with capacity above 1 MW and upto 25 MW” and in the matter of Tariff determination for hydro generating stations
    Accessible Version : View (72 KB) 
    Show cause notice dated 30-05-2005 under sections 142 and 146 of the Electricity Act, 2003 and in the matter of Non-compliance of directions pertaining to arrangements for collection
    Accessible Version : View (24 KB) 
    Non compliance by UPCL of provisions of Section 55 of the Electricity Act, 2003 and UPCL’s Application under Section 55 of the Electricity Act, 2003 dated 26.05.2005
    Accessible Version : View (40 KB) 
    Reject of petitioner application of M/s Arpit Steel and others V/s UPCL.
    Accessible Version : View (226 KB) 
    Admit of PTCUL’s ARR petition for FY. 2005-06.
    Accessible Version : View (46 KB) 
    Admit of UPCL’s ARR petition for FY. 2005-06
    Accessible Version : View (10 KB) 
    Final opportunity to UPCL to submit its ARRs and tariff proposals for the years 2004-05 and 2005-06 alongwith requisite information in accordance with the distribution and transmission
    Accessible Version : View (12 KB) 
    To get a fair and accurate report on compliance of Commission’s directions listed out in Chapter-7 of the Commission’s Tariff Order dated 08.09.2003 of UPCL, Constitution of Experts Committee
    Accessible Version : View (9 KB) 
    nterim Order in the matter of Wrong application of electricity tariff by UPCL to Defence Bulk Consumers and in the matter of Commander Works Engineer (Hills), Military Engineer
    Accessible Version : View (10 KB) 
    Clubbing of UJVNL’s applications as decided in the proceedings already initiated by Commission vide its order dated 31.08.2004 and the information summoned shall be produced before the Commission
    Accessible Version : View (12 KB) 
    UJVNL to submit its tariff proposals of 09 plants latest by 15.09.04 along with detailed data on its costs in accordance with the regulations already notified in the formats
    Accessible Version : View (9 KB) 
    Recovery of charges exceeding the tariff for domestic consumers.
    Accessible Version : View (10 KB) 
    in the matter of Change in the adhoc power purchase rate of 37 paise/unit fixed in Tariff order dated 8th September 2003.
    Accessible Version : View (14 KB) 
    in the matter of Suomoto proceedings initiated with respect to meter reading, billing and collection from Domestic Consumers.
    Accessible Version : View (41 KB) 
    in the matter of Change in the adhoc power purchase rate of 37 paise/unit fixed in Tariff order dated 8th September 2003.
    Accessible Version : View (14 KB) 
    in the matter of Suomoto proceedings initiated with respect to meter reading, billing and collection from Domestic Consumers.
    Accessible Version : View (41 KB) 
    in the matter of Approval of capital investment under clause 11 of Transmission and Bulk Supply Licensee and Distribution and Retail Supply License.
    Accessible Version : View (22 KB) 
    in the matter of Approval of capital investment under clause 11 of Transmission and Bulk Supply Licensee and Distribution and Retail Supply License.
    Accessible Version : View (22 KB) 
    in the matter of Misc. Applications No. 1 & 2 of 2004 dated 05 -04-2004 filed by Uttaranchal Jal Vidyut Nigam Ltd, Dehradun seeking recall and stay of Commission’s Order dated 19.03.2004.
    Accessible Version : View (19 KB) 
    in the matter of Misc. Applications dated 15-09-2003 (No. 24/2003) and dated 29-09-2003 (No.27/2003) filed before the Commission by Uttaranchal Jal Vidyut Nigam Ltd, Dehradun.
    Accessible Version : View (18 KB) 
    in the matter of Sale of electricity generated by the generating units of Uttaranchal Jal Vidyut Nigam Ltd. and which is surplus to the requirement of consumers of Uttaranchal State.
    Accessible Version : View (13 KB) 
    in the matter of Approval of capital investment under para 11 of Transmission and Bulk Supply Licensee and Distribution and Retail Supply Licensee.
    Accessible Version : View (21 KB) 
    Interim Order in the matter of recovery of charges exceeding the tariff for domestic consumers.
    Accessible Version : View (10 KB) 
    in the matter of Levy and realization of independent feeder charges by Uttaranchal Power Corporation Ltd from M/S Ace Glass Containers Pvt. Ltd ,the petitioner.
    Accessible Version : View (40 KB) 
    in the matter of Approval of capital investment under clause 11 of Transmission and Bulk Supply Licence and Distribution and Retail Supply Licence.
    Accessible Version : View (17 KB) 
    Order on Late Payment Surcharge of Private Tubewell/ Pump set consumers
    Accessible Version : View (12 KB) 
    Representation/Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL to an individual consumer connected to the electrical 02/05/2019
    Accessible Version : View (99 KB) 
    Deployment of customised Renewable Purchase Obligation Compliance System (RPOCS) Web Tool in Uttarakhand. 14/12/2018
    Accessible Version : View (305 KB) 
    In the Matter of: Dispute between M/s Bhilangana Hydro Power Limited and Power Transmission Corporation of Uttarakhand Limited, regarding Late Payment 22/11/2018
    Accessible Version : View (126 KB) 
    In the matter of: Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2018 to 31.12.2018. 09/10/2018
    Accessible Version : View (452 KB) 
    In the matter of:Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. 31/10/2018
    Accessible Version : View (221 KB) 
    In the matter of:Petition No. 34 of 2018 Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Aglar Power Ltd. for Rayat SHP. 26/10/2018
    Accessible Version : View (172 KB) 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2018 to 30.09.2018. 24/09/2018
    Accessible Version : View (481 KB) 
    Petition under section 94(1)(f) of the Electricity Act, 2003 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 17.05.2018 17/09/2018
    Accessible Version : View (582 KB) 
    In the matter of: Suo-moto proceedings in the matter of Show Cause Notice issued to PTCUL under the provisions of Section 142 read with Section 149 of the Electricity Act, 2003 13/09/2018
    Accessible Version : View (126 KB) 
    Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 kV Substation & its 0.60 Km associated 66 kV line. 12/09/2018
    Accessible Version : View (211 KB) 
    Application seeking permission to setup Solar Power Plant of capacity 40 MW at Haripura Dam (27.34 MW) and Tumaria Dam (13.50 MW) in District Udham Singh Nagar, Uttarakhand 29/08/2018
    Accessible Version : View (377 KB) 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd 28/08/2018
    Accessible Version : View (227 KB) 
    Representation/Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL to an individual consumer connected to the electrical network 02/12/2019
    Accessible Version : View (99 KB) 
    Application seeking approval of the Commission on the Power Purchase Agreement executed between Uttarakhand Power Corporation Limited and Uttarakhand 28/08/2018
    Accessible Version : View (329 KB) 
    Petition seeking determination of project specific tariff for 12.6 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 18/08/2018
    Accessible Version : View (781 KB) 
    Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to ‘component A’ that is, regarding to transmission charges for the use. 02/12/2019
    Accessible Version : View (131 KB) 
    Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 signed between Parties for Procurement. 15/11/2019
    Accessible Version : View (377 KB) 
    Application seeking relaxation in UERC (The Electricity Supply Code) Regulations 2007 and in UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013. 14/08/2018
    Accessible Version : View (165 KB) 
    Selection of Developer(s) for setting of 200 MW Aggregate Capacity Grid Connect Solar PV Power Projects in the Hilly region of Uttarakhand for procurement of power on long term basis by UPCL. 15/11/2019
    Accessible Version : View (330 KB) 
    Review Petition on the Commission’s Order dated 21.03.2018 on “True-Up of FY 2016-17, ARR for FY 2017-18 and AFC for FY 2018-19 for UJVN Ltd.” 13/08/2018
    Accessible Version : View (179 KB) 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2019 to 31.12.2019. 14/11/2019
    Accessible Version : View (262 KB) 
    Petition for review of the Commission’s Order dated 21.03.2018 on True up for FY 2016-17, Annual Performance Review for FY 2017-18 and Annual Revenue Requirement for FY 2018-19. 13/08/2018
    Accessible Version : View (700 KB) 
    Petition seeking approval for recovery of power purchase cost incurred in excess of the approved power purchase cost for FY 2018-19. 25/10/2019
    Accessible Version : View (802 KB) 
    Petition seeking approval of the Commission for advance banking of power with M/s PTC India Limited, M/s Mittal Processors (P) Ltd and M/s Arunachal Pradesh Power Corporation Pvt. 07/08/2018
    Accessible Version : View (375 KB) 
    Petition for review of the Commission’s Order dated 27.02.2019 on True up for FY 2017-18, Annual Performance Review for FY 2018-19 and Annual Revenue Requirement for FY 2019- 20. 25/10/2019
    Accessible Version : View (825 KB) 
    APTEL’s Judgement dated 23.04.2019 in Appeal No. 287 of 2015. 18/10/2019
    Accessible Version : View (409 KB) 
    Suo-Moto proceedings initiated by the Commission against non-compliance by UPCL of the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 06/08/2018
    Accessible Version : View (414 KB) 
    Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st March 2017 on open access power purchased by M/s Kashi Vishwanath Textile Mill (P) Ltd. 15/10/2019
    Accessible Version : View (225 KB) 
    Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited 23/07/2018
    Accessible Version : View (331 KB) 
    Petition seeking carry forward of surplus Renewable Purchase Obligation of 139.00 MU (Non-Solar) in FY 2018-19 as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations. 09/10/2019
    Accessible Version : View (188 KB)