Close

    Documents

    Documents related to government notifications, orders, reports, guidelines and more appear here.

    Filter Document category wise
    All Documents
    Title Date View / Download
    Application seeking approval of the investment on the Construction of 33 kV line (Underground and Overhead Lines) in Haridwar and US Nagar District of Uttarakhand. 29/11/2022
    Accessible Version : View (349 KB) 
    Application seeking approval of the Commission on the draft Power Purchase Agreement for medium term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd 22/11/2022
    Accessible Version : View (165 KB) 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2022 to 31.12.2022. 15/11/2022
    Accessible Version : View (169 KB) 
    Petition for approval of Draft Amended Metering Communication & Data Acquisition Requirements (MCDAR) for Intra-State Power System of Uttarakhand after incorporating amendments 22/11/2022
    Accessible Version : View (93 KB) 
    Petition seeking determination of project specific tariff for 1.5 MW (2 X 750 kW) Dunao Small Hydro Power Station under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 11/11/2022
    Accessible Version : View (497 KB) 
    Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP till 30.11.2022 or commissioning of 400 kV D/c Transmission line, 10/11/2022
    Accessible Version : View (178 KB) 
    Petition for approval of Provisional Tariff for Vyasi Hydro Power Project (2×60 MW) under Section 62 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines 22/11/2022
    Accessible Version : View (185 KB) 
    Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s 03/11/2022
    Accessible Version : View (177 KB) 
    Petition seeking approval for increasing the Continuous Supply Surcharge (CSS) as approved by the Commission in the Tariff Order for FY 2022-23. 19/10/2022
    Accessible Version : View (847 KB) 
    Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL 19/09/2022
    Accessible Version : View (160 KB) 
    Waiver of Supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj–Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity 14/09/2022
    Accessible Version : View (220 KB) 
    Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid 28/09/2022
    Accessible Version : View (76 KB) 
    Waiver of supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj– Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity 27/09/2022
    Accessible Version : View (78 KB) 
    Petition seeking approval of the Commission on Deviation in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost 28/10/2022
    Accessible Version : View (981 KB) 
    Revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31.03.2022 for FY 2022-23. 27/09/2022
    Accessible Version : View (258 KB) 
    Petition for review of the Commission’s Order dated 22.06.2022 on application for approval of draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited 19/09/2022
    Accessible Version : View (176 KB) 
    Petition seeking removal of difficulty in implementation of modified Time of Day metering as provided in clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23. 12/09/2022
    Accessible Version : View (621 KB) 
    Unplanned and irregular load shedding/curtailment of power by Uttarakhand Power Corporation Limited during the period 01st of March 2022 to 30th June 2022 and being continued till date. 12/09/2022
    Accessible Version : View (135 KB) 
    Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Suringad-II Small Hydro Power Plant 02/09/2022
    Accessible Version : View (233 KB) 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2022 to 30.09.2022 29/08/2022
    Accessible Version : View (163 KB) 
    Petition seeking adjustment of tariff for 5 MW Motighat Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated 25/08/2022
    Accessible Version : View (87 KB) 
    Petition seeking adjustment of tariff for 5 MW Tanga Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated due to the catastrophic damage caused 25/08/2022
    Accessible Version : View (87 KB) 
    Petition seeking grant of permission to connect 33 kV dedicated line from 15 MW Captive Solar Power Plant to the stepdown side of 132/33 kV switchyard of Kashi Vishwanath Steels Pvt. Ltd. 22/08/2022
    Accessible Version : View (170 KB) 
    Non-compliance of Sub-Section 3 of Section 43 of the Electricity Act, 2003 and Regulation 3.3.3 (17) & Regulation 3.3.3 (19) of UERC 22/07/2022
    Accessible Version : View (133 KB) 
    In the Matter of: Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC 20/07/2022
    Accessible Version : View (3 MB) 
    Work of Construction of 132 kV & 66 kV Bays and installation of 3×20 MVA, 132/66 kV Transformer at 132 kV Substation Simli. 20/07/2022
    Accessible Version : View (2 MB) 
    Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERC (Release of New LT Connections, 22/07/2022
    Accessible Version : View (177 KB) 
    Application seeking approval of the Commission on the draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd. 22/05/2022
    Accessible Version : View (175 KB) 
    Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Kaliganga-II Small Hydro Power Plant (2X2.25 MW). 22/05/2022
    Accessible Version : View (276 KB) 
    Petition for review of the Commission’s Order dated 31.03.2022 on True up for FY 2020-21,Annual Performance Review for FY 2021-22 and Annual Revenue Requirement for FY 2022-23 29/05/2022
    Accessible Version : View (601 KB) 
    Petition for issuing necessary directions to UPCL to withdraw invoices issued against the Petitioner imposing 25% additional Temporary Supply Tariff 27/06/2022
    Accessible Version : View (208 KB) 
    Suo-moto proceedings in the matter of applicability of Rate Schedule RTS-4A, Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017. 27/05/2022
    Accessible Version : View (276 KB) 
    Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from Generating Stations operating in Ravi Basin 09/05/2022
    Accessible Version : View (241 KB) 
    Petition seeking extension of Control Period of the benchmark capital cost & generic tariff as approved by the Commission vide its order dated 11/05/2020, 30/09/2020 and 05/10/2020 till March 2023 22/05/2022
    Accessible Version : View (228 KB) 
    Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar project of M/s Parihar Constructions. 05/05/2022
    Accessible Version : View (189 KB) 
    Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2022-23 26/04/2022
    Accessible Version : View (811 KB) 
    Petition for Approval of consolidated DPR amounting to Rs. 843.724 Crore funded through ADB, assuming 90% grant in loan component for transmission projects under UTSDIP Scheme. 26/04/2022
    Accessible Version : View (133 KB) 
    Filing of Miscellaneous Petition, inter alia amongst other grounds concerning refund of Minimum Demand Charges (MDC)/ Late Payment Surcharge (LPS) charges by illegal disconnection 23/03/2022
    Accessible Version : View (203 KB) 
    Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity 03/03/2022
    Accessible Version : View (202 KB) 
    Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 22/03/2022
    Accessible Version : View (143 KB) 
    Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021 pertaining to submission of Periodical Reports 10/03/2022
    Accessible Version : View (161 KB) 
    Application seeking prior approval of the Commission on the draft short term Power Purchase Agreements between Uttarakhand Power Corporation Limited 10/03/2022
    Accessible Version : View (158 KB) 
    Suo-moto proceedings initiated by the Commission in the matter of Noncompliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the UERC 10/03/2025
    Accessible Version : View (141 KB) 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2022 to 31.03.2022. 09/03/2022
    Accessible Version : View (190 KB) 
    Application seeking approval on the Power Supply Agreements signed between UPCL and M/s Solar Energy Corporation of India (SECI). 03/02/2022
    Accessible Version : View (147 KB) 
    Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s 03/02/2022
    Accessible Version : View (174 KB) 
    Application seeking prior approval of Hon’ble Uttarakhand Electricity Regulatory Commission on the Power Purchase Agreement to be executed between UPCL & UJVN Ltd for Vyasi HEP (120 MW) 03/02/2022
    Accessible Version : View (211 KB) 
    Application seeking approval on the two Draft Power Purchase Agreements proposed to be entered into between UPCL and M/s Sravanthi Energy Pvt. Ltd & M/s Gama Infraprop Pvt. Ltd. 03/02/2022
    Accessible Version : View (141 KB) 
    Application seeking prior approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s PTC India Ltd. on short term basis. 21/01/2022
    Accessible Version : View (129 KB) 
    Petition seeking utilisation of 220 kV S/C dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from small hydro projects operating in Ravi Basin 17/01/2022
    Accessible Version : View (283 KB) 
    Application seeking approval for the investment on the project covering the construction of 03 No. 33/11 kV Substation 03/01/2022
    Accessible Version : View (186 KB) 
    Regulation 5 ‘Complaint Handling Procedures’ of UERC (Standards of Performance) Regulations, 2022 in accordance with Clause 23.4 of the Distribution 07/12/2023
    Accessible Version : View (378 KB) 
    Suo-moto proceedings initiated by the Commission in the matter of representation made by M/s Himalaya Hydro Private Ltd. (M/s HHPL) relating to amendment in Regulation 6.2(22) 02/11/2023
    Accessible Version : View (89 KB) 
    Application seeking permission for categorisation of Small Solar off grid Irritation pump system having capacity of 2 kW to 10 kW under ‘Grid Interactive small solar PV plants (GSPV) 01/11/2023
    Accessible Version : View (141 KB) 
    UERC (Compliance Audit) Regulations, 2015 (English)
    Accessible Version : View (180 KB) 
    UERC (Terms & Conditions of Intra State Open Access) Regulations, 2015 (SoR)
    Accessible Version : View (239 KB) 
    UERC (Terms & Conditions of Intra State Open Access) Regulations, 2015 (English)
    Accessible Version : View (2 MB) 
    Uttarakhand Electricity Regulatory Commission (State Grid Code) Regulations, 2016 (SoR)
    Accessible Version : View (285 KB) 
    Uttarakhand Electricity Regulatory Commission (State Grid Code) Regulations, 2016 (Hindi)
    Accessible Version : View (2 MB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2016. (SoR)
    Accessible Version : View (336 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2016. (Hindi)
    Accessible Version : View (112 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2016. (English)
    Accessible Version : View (394 KB) 
    UERC (Appointment & Functioning of Ombudsman) (Fourth Amendment) Regulations, 2016. (Hindi)
    Accessible Version : View (37 KB) 
    UERC (Appointment & Functioning of Ombudsman) (Fourth Amendment) Regulations, 2016. (English)
    Accessible Version : View (37 KB) 
    UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Fifth Amendment) Regulations, 2016. (SoR)
    Accessible Version : View (564 KB) 
    UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Fifth Amendment) Regulations, 2016. (Hindi)
    Accessible Version : View (3 MB) 
    UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Fifth Amendment) Regulations, 2016. (English)
    Accessible Version : View (4 MB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Sixth Amendment) Regulations, 2017. (SoR)
    Accessible Version : View (758 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Sixth Amendment) Regulations, 2017. (Hindi)
    Accessible Version : View (130 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Sixth Amendment) Regulations, 2017. (English)
    Accessible Version : View (163 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2017. (SoR)
    Accessible Version : View (758 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2017. (Hindi)
    Accessible Version : View (185 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2017. (English)
    Accessible Version : View (437 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017. (SoR)
    Accessible Version : View (312 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017. (Hindi)
    Accessible Version : View (417 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017. (English)
    Accessible Version : View (471 KB) 
    Uttarakhand Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2017. (SoR)
    Accessible Version : View (104 KB) 
    Uttarakhand Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2017. (Hindi)
    Accessible Version : View (351 KB) 
    Uttarakhand Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2017. (English)
    Accessible Version : View (409 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2017. (SoR)
    Accessible Version : View (458 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2017. (Hindi)
    Accessible Version : View (25 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2017. (English)
    Accessible Version : View (568 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018, in short, UERC Tariff Regulations, 2018. (SoR)
    Accessible Version : View (282 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018, in short, UERC Tariff Regulations, 2018. (Hindi)
    Accessible Version : View (3 MB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018, in short, UERC Tariff Regulations, 2018. (English)
    Accessible Version : View (3 MB) 
    Formats. (v) SLDC (English)
    Accessible Version : View (393 KB) 
    Formats. (iv) Thermal/Gas Generation (English)
    Accessible Version : View (451 KB) 
    Formats. (iii) Hydro Generation (English)
    Accessible Version : View (352 KB) 
    Miscellaneous Petition challenging the Regulation No. 6.1 of the Uttarakhand Electricity Regulatory Commission 31/10/2023
    Accessible Version : View (201 KB) 
    Formats. (ii) Transmission (English)
    Accessible Version : View (528 KB) 
    Application for recovery of Additional Security Deposits against credit sale of electricity in installments from the consumers. 23/10/2023
    Accessible Version : View (134 KB) 
    Formats. (i) Distribution (English)
    Accessible Version : View (732 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018. (SoR)
    Accessible Version : View (837 KB) 
    Application seeking approval of the Commission for the investment on the project “REVAMPED DISTRIBUTION SECTOR SCHEME” of Ministry of Power, Govt. of India in Uttarakhand to improve the quality, 19/10/2023
    Accessible Version : View (759 KB) 
    Application seeking approval for the investment on the works for “Distribution Component of Uttarakhand Transmission Strengthening & Distribution Improvement Programme (UTSDIP)” 19/10/2023
    Accessible Version : View (543 KB) 
    Petition to review/reconsider the Commission’s Order dated 16.08.2023 on the Suo-moto proceedings in the matter of request for seeking approval of revised payment terms for release of gas payments 17/10/2023
    Accessible Version : View (255 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018. (Hindi)
    Accessible Version : View (2 MB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018. (English)
    Accessible Version : View (2 MB) 
    Petition under Section 86 read with Section 181 of the Electricity Act, 2003 read with the order dated 20.06.2023 Hon’ble High Court 17/10/2023
    Accessible Version : View (231 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (Second Amendment) Regulations, 2018. (SoR)
    Accessible Version : View (128 KB)