| Title | Date | View / Download |
|---|---|---|
| Application seeking approval of the investment on the Construction of 33 kV line (Underground and Overhead Lines) in Haridwar and US Nagar District of Uttarakhand. | 29/11/2022 |
Accessible Version :
View
(349 KB)
|
| Application seeking approval of the Commission on the draft Power Purchase Agreement for medium term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd | 22/11/2022 |
Accessible Version :
View
(165 KB)
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2022 to 31.12.2022. | 15/11/2022 |
Accessible Version :
View
(169 KB)
|
| Petition for approval of Draft Amended Metering Communication & Data Acquisition Requirements (MCDAR) for Intra-State Power System of Uttarakhand after incorporating amendments | 22/11/2022 |
Accessible Version :
View
(93 KB)
|
| Petition seeking determination of project specific tariff for 1.5 MW (2 X 750 kW) Dunao Small Hydro Power Station under Section 62 and 86 of the Electricity Act, 2003 read with Regulation | 11/11/2022 |
Accessible Version :
View
(497 KB)
|
| Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP till 30.11.2022 or commissioning of 400 kV D/c Transmission line, | 10/11/2022 |
Accessible Version :
View
(178 KB)
|
| Petition for approval of Provisional Tariff for Vyasi Hydro Power Project (2×60 MW) under Section 62 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines | 22/11/2022 |
Accessible Version :
View
(185 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s | 03/11/2022 |
Accessible Version :
View
(177 KB)
|
| Petition seeking approval for increasing the Continuous Supply Surcharge (CSS) as approved by the Commission in the Tariff Order for FY 2022-23. | 19/10/2022 |
Accessible Version :
View
(847 KB)
|
| Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL | 19/09/2022 |
Accessible Version :
View
(160 KB)
|
| Waiver of Supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj–Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity | 14/09/2022 |
Accessible Version :
View
(220 KB)
|
| Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid | 28/09/2022 |
Accessible Version :
View
(76 KB)
|
| Waiver of supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj– Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity | 27/09/2022 |
Accessible Version :
View
(78 KB)
|
| Petition seeking approval of the Commission on Deviation in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost | 28/10/2022 |
Accessible Version :
View
(981 KB)
|
| Revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31.03.2022 for FY 2022-23. | 27/09/2022 |
Accessible Version :
View
(258 KB)
|
| Petition for review of the Commission’s Order dated 22.06.2022 on application for approval of draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited | 19/09/2022 |
Accessible Version :
View
(176 KB)
|
| Petition seeking removal of difficulty in implementation of modified Time of Day metering as provided in clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23. | 12/09/2022 |
Accessible Version :
View
(621 KB)
|
| Unplanned and irregular load shedding/curtailment of power by Uttarakhand Power Corporation Limited during the period 01st of March 2022 to 30th June 2022 and being continued till date. | 12/09/2022 |
Accessible Version :
View
(135 KB)
|
| Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Suringad-II Small Hydro Power Plant | 02/09/2022 |
Accessible Version :
View
(233 KB)
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2022 to 30.09.2022 | 29/08/2022 |
Accessible Version :
View
(163 KB)
|
| Petition seeking adjustment of tariff for 5 MW Motighat Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated | 25/08/2022 |
Accessible Version :
View
(87 KB)
|
| Petition seeking adjustment of tariff for 5 MW Tanga Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated due to the catastrophic damage caused | 25/08/2022 |
Accessible Version :
View
(87 KB)
|
| Petition seeking grant of permission to connect 33 kV dedicated line from 15 MW Captive Solar Power Plant to the stepdown side of 132/33 kV switchyard of Kashi Vishwanath Steels Pvt. Ltd. | 22/08/2022 |
Accessible Version :
View
(170 KB)
|
| Non-compliance of Sub-Section 3 of Section 43 of the Electricity Act, 2003 and Regulation 3.3.3 (17) & Regulation 3.3.3 (19) of UERC | 22/07/2022 |
Accessible Version :
View
(133 KB)
|
| In the Matter of: Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC | 20/07/2022 |
Accessible Version :
View
(3 MB)
|
| Work of Construction of 132 kV & 66 kV Bays and installation of 3×20 MVA, 132/66 kV Transformer at 132 kV Substation Simli. | 20/07/2022 |
Accessible Version :
View
(2 MB)
|
| Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERC (Release of New LT Connections, | 22/07/2022 |
Accessible Version :
View
(177 KB)
|
| Application seeking approval of the Commission on the draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd. | 22/05/2022 |
Accessible Version :
View
(175 KB)
|
| Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Kaliganga-II Small Hydro Power Plant (2X2.25 MW). | 22/05/2022 |
Accessible Version :
View
(276 KB)
|
| Petition for review of the Commission’s Order dated 31.03.2022 on True up for FY 2020-21,Annual Performance Review for FY 2021-22 and Annual Revenue Requirement for FY 2022-23 | 29/05/2022 |
Accessible Version :
View
(601 KB)
|
| Petition for issuing necessary directions to UPCL to withdraw invoices issued against the Petitioner imposing 25% additional Temporary Supply Tariff | 27/06/2022 |
Accessible Version :
View
(208 KB)
|
| Suo-moto proceedings in the matter of applicability of Rate Schedule RTS-4A, Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017. | 27/05/2022 |
Accessible Version :
View
(276 KB)
|
| Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from Generating Stations operating in Ravi Basin | 09/05/2022 |
Accessible Version :
View
(241 KB)
|
| Petition seeking extension of Control Period of the benchmark capital cost & generic tariff as approved by the Commission vide its order dated 11/05/2020, 30/09/2020 and 05/10/2020 till March 2023 | 22/05/2022 |
Accessible Version :
View
(228 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar project of M/s Parihar Constructions. | 05/05/2022 |
Accessible Version :
View
(189 KB)
|
| Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2022-23 | 26/04/2022 |
Accessible Version :
View
(811 KB)
|
| Petition for Approval of consolidated DPR amounting to Rs. 843.724 Crore funded through ADB, assuming 90% grant in loan component for transmission projects under UTSDIP Scheme. | 26/04/2022 |
Accessible Version :
View
(133 KB)
|
| Filing of Miscellaneous Petition, inter alia amongst other grounds concerning refund of Minimum Demand Charges (MDC)/ Late Payment Surcharge (LPS) charges by illegal disconnection | 23/03/2022 |
Accessible Version :
View
(203 KB)
|
| Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity | 03/03/2022 |
Accessible Version :
View
(202 KB)
|
| Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 | 22/03/2022 |
Accessible Version :
View
(143 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021 pertaining to submission of Periodical Reports | 10/03/2022 |
Accessible Version :
View
(161 KB)
|
| Application seeking prior approval of the Commission on the draft short term Power Purchase Agreements between Uttarakhand Power Corporation Limited | 10/03/2022 |
Accessible Version :
View
(158 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of Noncompliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the UERC | 10/03/2025 |
Accessible Version :
View
(141 KB)
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2022 to 31.03.2022. | 09/03/2022 |
Accessible Version :
View
(190 KB)
|
| Application seeking approval on the Power Supply Agreements signed between UPCL and M/s Solar Energy Corporation of India (SECI). | 03/02/2022 |
Accessible Version :
View
(147 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s | 03/02/2022 |
Accessible Version :
View
(174 KB)
|
| Application seeking prior approval of Hon’ble Uttarakhand Electricity Regulatory Commission on the Power Purchase Agreement to be executed between UPCL & UJVN Ltd for Vyasi HEP (120 MW) | 03/02/2022 |
Accessible Version :
View
(211 KB)
|
| Application seeking approval on the two Draft Power Purchase Agreements proposed to be entered into between UPCL and M/s Sravanthi Energy Pvt. Ltd & M/s Gama Infraprop Pvt. Ltd. | 03/02/2022 |
Accessible Version :
View
(141 KB)
|
| Application seeking prior approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s PTC India Ltd. on short term basis. | 21/01/2022 |
Accessible Version :
View
(129 KB)
|
| Petition seeking utilisation of 220 kV S/C dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from small hydro projects operating in Ravi Basin | 17/01/2022 |
Accessible Version :
View
(283 KB)
|
| Application seeking approval for the investment on the project covering the construction of 03 No. 33/11 kV Substation | 03/01/2022 |
Accessible Version :
View
(186 KB)
|
| Regulation 5 ‘Complaint Handling Procedures’ of UERC (Standards of Performance) Regulations, 2022 in accordance with Clause 23.4 of the Distribution | 07/12/2023 |
Accessible Version :
View
(378 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of representation made by M/s Himalaya Hydro Private Ltd. (M/s HHPL) relating to amendment in Regulation 6.2(22) | 02/11/2023 |
Accessible Version :
View
(89 KB)
|
| Application seeking permission for categorisation of Small Solar off grid Irritation pump system having capacity of 2 kW to 10 kW under ‘Grid Interactive small solar PV plants (GSPV) | 01/11/2023 |
Accessible Version :
View
(141 KB)
|
| UERC (Compliance Audit) Regulations, 2015 (English) |
Accessible Version :
View
(180 KB)
|
|
| UERC (Terms & Conditions of Intra State Open Access) Regulations, 2015 (SoR) |
Accessible Version :
View
(239 KB)
|
|
| UERC (Terms & Conditions of Intra State Open Access) Regulations, 2015 (English) |
Accessible Version :
View
(2 MB)
|
|
| Uttarakhand Electricity Regulatory Commission (State Grid Code) Regulations, 2016 (SoR) |
Accessible Version :
View
(285 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (State Grid Code) Regulations, 2016 (Hindi) |
Accessible Version :
View
(2 MB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2016. (SoR) |
Accessible Version :
View
(336 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2016. (Hindi) |
Accessible Version :
View
(112 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2016. (English) |
Accessible Version :
View
(394 KB)
|
|
| UERC (Appointment & Functioning of Ombudsman) (Fourth Amendment) Regulations, 2016. (Hindi) |
Accessible Version :
View
(37 KB)
|
|
| UERC (Appointment & Functioning of Ombudsman) (Fourth Amendment) Regulations, 2016. (English) |
Accessible Version :
View
(37 KB)
|
|
| UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Fifth Amendment) Regulations, 2016. (SoR) |
Accessible Version :
View
(564 KB)
|
|
| UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Fifth Amendment) Regulations, 2016. (Hindi) |
Accessible Version :
View
(3 MB)
|
|
| UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Fifth Amendment) Regulations, 2016. (English) |
Accessible Version :
View
(4 MB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Sixth Amendment) Regulations, 2017. (SoR) |
Accessible Version :
View
(758 KB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Sixth Amendment) Regulations, 2017. (Hindi) |
Accessible Version :
View
(130 KB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Sixth Amendment) Regulations, 2017. (English) |
Accessible Version :
View
(163 KB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2017. (SoR) |
Accessible Version :
View
(758 KB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2017. (Hindi) |
Accessible Version :
View
(185 KB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2017. (English) |
Accessible Version :
View
(437 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017. (SoR) |
Accessible Version :
View
(312 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017. (Hindi) |
Accessible Version :
View
(417 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017. (English) |
Accessible Version :
View
(471 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2017. (SoR) |
Accessible Version :
View
(104 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2017. (Hindi) |
Accessible Version :
View
(351 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2017. (English) |
Accessible Version :
View
(409 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2017. (SoR) |
Accessible Version :
View
(458 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2017. (Hindi) |
Accessible Version :
View
(25 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2017. (English) |
Accessible Version :
View
(568 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018, in short, UERC Tariff Regulations, 2018. (SoR) |
Accessible Version :
View
(282 KB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018, in short, UERC Tariff Regulations, 2018. (Hindi) |
Accessible Version :
View
(3 MB)
|
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018, in short, UERC Tariff Regulations, 2018. (English) |
Accessible Version :
View
(3 MB)
|
|
| Formats. (v) SLDC (English) |
Accessible Version :
View
(393 KB)
|
|
| Formats. (iv) Thermal/Gas Generation (English) |
Accessible Version :
View
(451 KB)
|
|
| Formats. (iii) Hydro Generation (English) |
Accessible Version :
View
(352 KB)
|
|
| Miscellaneous Petition challenging the Regulation No. 6.1 of the Uttarakhand Electricity Regulatory Commission | 31/10/2023 |
Accessible Version :
View
(201 KB)
|
| Formats. (ii) Transmission (English) |
Accessible Version :
View
(528 KB)
|
|
| Application for recovery of Additional Security Deposits against credit sale of electricity in installments from the consumers. | 23/10/2023 |
Accessible Version :
View
(134 KB)
|
| Formats. (i) Distribution (English) |
Accessible Version :
View
(732 KB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018. (SoR) |
Accessible Version :
View
(837 KB)
|
|
| Application seeking approval of the Commission for the investment on the project “REVAMPED DISTRIBUTION SECTOR SCHEME” of Ministry of Power, Govt. of India in Uttarakhand to improve the quality, | 19/10/2023 |
Accessible Version :
View
(759 KB)
|
| Application seeking approval for the investment on the works for “Distribution Component of Uttarakhand Transmission Strengthening & Distribution Improvement Programme (UTSDIP)” | 19/10/2023 |
Accessible Version :
View
(543 KB)
|
| Petition to review/reconsider the Commission’s Order dated 16.08.2023 on the Suo-moto proceedings in the matter of request for seeking approval of revised payment terms for release of gas payments | 17/10/2023 |
Accessible Version :
View
(255 KB)
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018. (Hindi) |
Accessible Version :
View
(2 MB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018. (English) |
Accessible Version :
View
(2 MB)
|
|
| Petition under Section 86 read with Section 181 of the Electricity Act, 2003 read with the order dated 20.06.2023 Hon’ble High Court | 17/10/2023 |
Accessible Version :
View
(231 KB)
|
| Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (Second Amendment) Regulations, 2018. (SoR) |
Accessible Version :
View
(128 KB)
|