Filing of Miscellaneous Petition u/s 181(1) r/w Section 181(2)(zp) r/w Section 94(1)(f) of the Indian Electricity Act, 2003, seeking relaxation of Clause 2.1(4) of the UERC
|
29/04/2025 |
Accessible Version :
View
(61 KB) /
|
Application seeking approval for inclusion of soft drink concentrate in seasonal industries product list.
|
09/06/2020 |
Accessible Version :
View
(145 KB) /
|
Petition regarding permission to install GRPV Plant beyond 1.0 MW limit set by the Commission with Net Metering facility by UPCL. AND
|
27/02/2025 |
Accessible Version :
View
(97 KB) /
|
Application seeking approval for investment on the Implementation of Enterprise Resource Planning (ERP) under Integrated Power Development Scheme (IPDS) of Ministry of Power, Govt. of India.
|
03/06/2020 |
Accessible Version :
View
(206 KB) /
|
Petition for seeking approval of the Commission for the investment on the Implementation of Real Time Data Acquisition System (RTDAS) for SAIFI/SAIDI measurement
|
22/05/2020 |
Accessible Version :
View
(176 KB) /
|
Extension of the period of applicability of the benchmark capital cost and levellised generic tariff issued by the Commission for Solar Energy based plants vide Suo-moto
|
11/05/2020 |
Accessible Version :
View
(142 KB) /
|
Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd.
|
11/03/2020 |
Accessible Version :
View
(246 KB) /
|
Petition to extend the settlement of Net Energy from billing period to yearly basis on captive use by Rooftop Solar PV generator under the NOC model
|
11/03/2020 |
Accessible Version :
View
(185 KB) /
|
Application under Regulation 59(1) of the UERC (Conduct of Business) Regulations, 2014, Section 94, Section 64 and Section 86(1)(f) & (k) of the Electricity Act, 2003,
|
14/02/2025 |
Accessible Version :
View
(106 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2020 to 31.03.2020.
|
02/03/2020 |
Accessible Version :
View
(194 KB) /
|
Application filed by M/s Galwalia Ispat Udyog Pvt. Ltd and M/s Kumaon Garhwal Chamber of Commerce & Industry (KGCCI) seeking review of Commission’s Order dated 30.09.2024
|
21/01/2025 |
Accessible Version :
View
(45 KB) /
|
Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007
|
07/01/2020 |
Accessible Version :
View
(217 KB) /
|
Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage
|
29/12/2021 |
Accessible Version :
View
(230 KB) /
|
Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage
|
14/12/2021 |
Accessible Version :
View
(295 KB) /
|
Petition under section 79 of the Electricity Act, 2003, read with Article 13 (“Change in Law”) of the Power Purchase Agreement (“PPA”) dated 19.03.2012
|
14/12/2021 |
Accessible Version :
View
(171 KB) /
|
Suo-Moto proceedings in the matter of clarification sought by Akshay Urja Association regarding Performance Ratio which is one of the pre-requisites for declaration
|
09/12/2021 |
Accessible Version :
View
(237 KB) /
|
Petition under Section 142 of the Electricity Act, 2003 against UPCL authorities for nonimplementation and non-compliance of the Order dated 24.11.2020
|
09/12/2021 |
Accessible Version :
View
(180 KB) /
|
Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. in terms of the directions contained in Order of the Commission
|
01/11/2021 |
Accessible Version :
View
(167 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2021 to 31.12.2021.
|
29/11/2021 |
Accessible Version :
View
(189 KB) /
|
Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage
|
29/11/2021 |
Accessible Version :
View
(237 KB) /
|
Petition to the Commission for resolution of matter pertaining to Deviation Settlement Mechanism (“DSM”) claim for 214 MW (225 MW ISO) for Phase I of 2×225 MW
|
26/11/2021 |
Accessible Version :
View
(408 KB) /
|
Petition for review of the Commission’s Order dated 11.06.2021 passed in Petition no. 21 of 2020 under Section 94(f) of the Electricity Act, 2003 read with Section 114 and Order 47
|
12/11/2021 |
Accessible Version :
View
(127 KB) /
|
Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage,
|
12/10/2021 |
Accessible Version :
View
(265 KB) /
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
05/10/2021 |
Accessible Version :
View
(145 KB) /
|
Hon’ble APTEL’s Judgement dated 02.03.2020 in Appeal No. 18 of 2016.
|
22/09/2021 |
Accessible Version :
View
(387 KB) /
|
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22
|
21/09/2021 |
Accessible Version :
View
(194 KB) /
|
Application seeking approval of Uttarakhand Electricity Regulatory Commission (UERC) for investment on the work of construction of 10 nos. 33/11 KV GIS Substations
|
07/08/2021 |
Accessible Version :
View
(229 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2021 to 30.09.2021.
|
02/09/2021 |
Accessible Version :
View
(182 KB) /
|
Petition seeking approval of the Commission for advance and return banking of power with M/s GMR Energy Trading Ltd., M/s Arunachal Pradesh Power Corporation Pvt. Ltd
|
11/08/2021 |
Accessible Version :
View
(322 KB) /
|
Petition under Section 86(1) (c), (f) and (k) read with Section 30, Section 39(2) (c), Section 40(a) and Section 42(1) of Electricity Act, 2003 seeking directions to Respondents
|
30/06/2021 |
Accessible Version :
View
(207 KB) /
|
Suo-Moto Order on methodology for payment of transmission charges for using dedicated transmission line of M/s Greenko Budhil HEP by Himachal Pradesh State Electricity Board Ltd.
|
30/06/2021 |
Accessible Version :
View
(172 KB) /
|
Directions issued by the Government of Uttarakhand (GoU) under Section 108 of the Electricity Act, 2003 for Exemption of consumption security charges for release
|
16/06/2021 |
Accessible Version :
View
(158 KB) /
|
Petition under Section 86 (1) (a), Section 86(1)(f) read with Section 61(d) seeking directions to State Load Despatch Centre of Uttarakhand to consider Scheduled Capacity
|
14/06/2021 |
Accessible Version :
View
(358 KB) /
|
Petition for issuing necessary directions for fixing the electricity tariffs as per FY 2015-16 for the allocated Solar Power Plants and 40% additional tariff for the Solar PV
|
11/06/2021 |
Accessible Version :
View
(187 KB) /
|
Approval of Capital Investment under Para 11 of the Transmission Licence for Construction of 10X6 MVA, 220/33 kV GIS Substation Baramwari (Rudrapur) & 220 kV
|
03/06/2021 |
Accessible Version :
View
(82 KB) /
|
Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. And
|
02/06/2021 |
Accessible Version :
View
(174 KB) /
|
Suo moto proceeding for making consistent the time limits specified in clause (17), (18), (20), (21), (22), (24) & (27)(c) of Regulation 7.5 under Regulation 10.3
|
|
Accessible Version :
View
(178 KB) /
|
Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 01.02.2019, 18.09.2019 and 23.06.2020
|
31/03/2021 |
Accessible Version :
View
(232 KB) /
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
23/03/2021 |
Accessible Version :
View
(161 KB) /
|
Petition for seeking carry forward of estimated surplus of 320.62 MU (Non-Solar) and estimated deficit of 110.28 MU (Solar) Renewable Purchase Obligation of FY 2020-21
|
17/03/2021 |
Accessible Version :
View
(231 KB) /
|
UERC (Terms & Conditions of Intra State Open Access) Regulations, 2015. (Hindi)
|
|
Accessible Version :
View
(704 KB) /
|
Petition seeking permanent connectivity for 214 MW (225 MW ISO) Phase II of 2×214 MW (450 MW ISO) Gas Based Combined Cycle Power Plant at Kashipur, Uttarakhand
|
05/03/2021 |
Accessible Version :
View
(137 KB) /
|
Compliance of Reports/Plans/Procedures by the Distribution Licensee as per the UERC (Distribution Code) Regulations, 2018.
|
02/01/2021 |
Accessible Version :
View
(103 KB) /
|
Petition filed under Regulation 59 of Uttarakhand Electricity Regulatory Commission (Conduct of Business) Regulations, 2014 and Regulation 103 & 104 of Uttarakhand Electricity Regulatory Commissio
|
13/01/2021 |
Accessible Version :
View
(112 KB) /
|
Application seeking approval for the investment on the project covering Construction of 02 Nos. 33/11 kV Sub-Stations along with their associated 33 kV Underground Lines
|
11/01/2021 |
Accessible Version :
View
(174 KB) /
|
Application seeking approval of the investment on the Construction of 33 kV line (Underground and Overhead Lines) in Haridwar and US Nagar District of Uttarakhand.
|
29/11/2022 |
Accessible Version :
View
(349 KB) /
|
Application seeking approval of the Commission on the draft Power Purchase Agreement for medium term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd
|
22/11/2022 |
Accessible Version :
View
(165 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2022 to 31.12.2022.
|
15/11/2022 |
Accessible Version :
View
(169 KB) /
|
Petition for approval of Draft Amended Metering Communication & Data Acquisition Requirements (MCDAR) for Intra-State Power System of Uttarakhand after incorporating amendments
|
22/11/2022 |
Accessible Version :
View
(93 KB) /
|
Petition seeking determination of project specific tariff for 1.5 MW (2 X 750 kW) Dunao Small Hydro Power Station under Section 62 and 86 of the Electricity Act, 2003 read with Regulation
|
11/11/2022 |
Accessible Version :
View
(497 KB) /
|
Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP till 30.11.2022 or commissioning of 400 kV D/c Transmission line,
|
10/11/2022 |
Accessible Version :
View
(178 KB) /
|
Petition for approval of Provisional Tariff for Vyasi Hydro Power Project (2×60 MW) under Section 62 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines
|
22/11/2022 |
Accessible Version :
View
(185 KB) /
|
Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s
|
03/11/2022 |
Accessible Version :
View
(177 KB) /
|
Petition seeking approval for increasing the Continuous Supply Surcharge (CSS) as approved by the Commission in the Tariff Order for FY 2022-23.
|
19/10/2022 |
Accessible Version :
View
(847 KB) /
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
19/09/2022 |
Accessible Version :
View
(160 KB) /
|
Waiver of Supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj–Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity
|
14/09/2022 |
Accessible Version :
View
(220 KB) /
|
Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid
|
28/09/2022 |
Accessible Version :
View
(76 KB) /
|
Waiver of supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj– Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity
|
27/09/2022 |
Accessible Version :
View
(78 KB) /
|
Petition seeking approval of the Commission on Deviation in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost
|
28/10/2022 |
Accessible Version :
View
(981 KB) /
|
Revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31.03.2022 for FY 2022-23.
|
27/09/2022 |
Accessible Version :
View
(258 KB) /
|
Petition for review of the Commission’s Order dated 22.06.2022 on application for approval of draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited
|
19/09/2022 |
Accessible Version :
View
(176 KB) /
|
Petition seeking removal of difficulty in implementation of modified Time of Day metering as provided in clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23.
|
12/09/2022 |
Accessible Version :
View
(621 KB) /
|
Unplanned and irregular load shedding/curtailment of power by Uttarakhand Power Corporation Limited during the period 01st of March 2022 to 30th June 2022 and being continued till date.
|
12/09/2022 |
Accessible Version :
View
(135 KB) /
|
Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Suringad-II Small Hydro Power Plant
|
02/09/2022 |
Accessible Version :
View
(233 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2022 to 30.09.2022
|
29/08/2022 |
Accessible Version :
View
(163 KB) /
|
Petition seeking adjustment of tariff for 5 MW Motighat Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated
|
25/08/2022 |
Accessible Version :
View
(87 KB) /
|
Petition seeking adjustment of tariff for 5 MW Tanga Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated due to the catastrophic damage caused
|
25/08/2022 |
Accessible Version :
View
(87 KB) /
|
Petition seeking grant of permission to connect 33 kV dedicated line from 15 MW Captive Solar Power Plant to the stepdown side of 132/33 kV switchyard of Kashi Vishwanath Steels Pvt. Ltd.
|
22/08/2022 |
Accessible Version :
View
(170 KB) /
|
Non-compliance of Sub-Section 3 of Section 43 of the Electricity Act, 2003 and Regulation 3.3.3 (17) & Regulation 3.3.3 (19) of UERC
|
22/07/2022 |
Accessible Version :
View
(133 KB) /
|
In the Matter of: Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC
|
20/07/2022 |
Accessible Version :
View
(3 MB) /
|
Work of Construction of 132 kV & 66 kV Bays and installation of 3×20 MVA, 132/66 kV Transformer at 132 kV Substation Simli.
|
20/07/2022 |
Accessible Version :
View
(2 MB) /
|
Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERC (Release of New LT Connections,
|
22/07/2022 |
Accessible Version :
View
(177 KB) /
|
Application seeking approval of the Commission on the draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd.
|
22/05/2022 |
Accessible Version :
View
(175 KB) /
|
Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Kaliganga-II Small Hydro Power Plant (2X2.25 MW).
|
22/05/2022 |
Accessible Version :
View
(276 KB) /
|
Petition for review of the Commission’s Order dated 31.03.2022 on True up for FY 2020-21,Annual Performance Review for FY 2021-22 and Annual Revenue Requirement for FY 2022-23
|
29/05/2022 |
Accessible Version :
View
(601 KB) /
|
Petition for issuing necessary directions to UPCL to withdraw invoices issued against the Petitioner imposing 25% additional Temporary Supply Tariff
|
27/06/2022 |
Accessible Version :
View
(208 KB) /
|
Suo-moto proceedings in the matter of applicability of Rate Schedule RTS-4A, Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017.
|
27/05/2022 |
Accessible Version :
View
(276 KB) /
|
Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from Generating Stations operating in Ravi Basin
|
09/05/2022 |
Accessible Version :
View
(241 KB) /
|
Petition seeking extension of Control Period of the benchmark capital cost & generic tariff as approved by the Commission vide its order dated 11/05/2020, 30/09/2020 and 05/10/2020 till March 2023
|
22/05/2022 |
Accessible Version :
View
(228 KB) /
|
Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar project of M/s Parihar Constructions.
|
05/05/2022 |
Accessible Version :
View
(189 KB) /
|
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2022-23
|
26/04/2022 |
Accessible Version :
View
(811 KB) /
|
Petition for Approval of consolidated DPR amounting to Rs. 843.724 Crore funded through ADB, assuming 90% grant in loan component for transmission projects under UTSDIP Scheme.
|
26/04/2022 |
Accessible Version :
View
(133 KB) /
|
Filing of Miscellaneous Petition, inter alia amongst other grounds concerning refund of Minimum Demand Charges (MDC)/ Late Payment Surcharge (LPS) charges by illegal disconnection
|
23/03/2022 |
Accessible Version :
View
(203 KB) /
|
Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity
|
03/03/2022 |
Accessible Version :
View
(202 KB) /
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015
|
22/03/2022 |
Accessible Version :
View
(143 KB) /
|
Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021 pertaining to submission of Periodical Reports
|
10/03/2022 |
Accessible Version :
View
(161 KB) /
|
Application seeking prior approval of the Commission on the draft short term Power Purchase Agreements between Uttarakhand Power Corporation Limited
|
10/03/2022 |
Accessible Version :
View
(158 KB) /
|
Suo-moto proceedings initiated by the Commission in the matter of Noncompliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the UERC
|
10/03/2025 |
Accessible Version :
View
(141 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2022 to 31.03.2022.
|
09/03/2022 |
Accessible Version :
View
(190 KB) /
|
Application seeking approval on the Power Supply Agreements signed between UPCL and M/s Solar Energy Corporation of India (SECI).
|
03/02/2022 |
Accessible Version :
View
(147 KB) /
|
Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s
|
03/02/2022 |
Accessible Version :
View
(174 KB) /
|
Application seeking prior approval of Hon’ble Uttarakhand Electricity Regulatory Commission on the Power Purchase Agreement to be executed between UPCL & UJVN Ltd for Vyasi HEP (120 MW)
|
03/02/2022 |
Accessible Version :
View
(211 KB) /
|
Application seeking approval on the two Draft Power Purchase Agreements proposed to be entered into between UPCL and M/s Sravanthi Energy Pvt. Ltd & M/s Gama Infraprop Pvt. Ltd.
|
03/02/2022 |
Accessible Version :
View
(141 KB) /
|
Application seeking prior approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s PTC India Ltd. on short term basis.
|
21/01/2022 |
Accessible Version :
View
(129 KB) /
|
Petition seeking utilisation of 220 kV S/C dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from small hydro projects operating in Ravi Basin
|
17/01/2022 |
Accessible Version :
View
(283 KB) /
|
Application seeking approval for the investment on the project covering the construction of 03 No. 33/11 kV Substation
|
03/01/2022 |
Accessible Version :
View
(186 KB) /
|
Regulation 5 ‘Complaint Handling Procedures’ of UERC (Standards of Performance) Regulations, 2022 in accordance with Clause 23.4 of the Distribution
|
07/12/2023 |
Accessible Version :
View
(378 KB) /
|
Suo-moto proceedings initiated by the Commission in the matter of representation made by M/s Himalaya Hydro Private Ltd. (M/s HHPL) relating to amendment in Regulation 6.2(22)
|
02/11/2023 |
Accessible Version :
View
(89 KB) /
|
Application seeking permission for categorisation of Small Solar off grid Irritation pump system having capacity of 2 kW to 10 kW under ‘Grid Interactive small solar PV plants (GSPV)
|
01/11/2023 |
Accessible Version :
View
(141 KB) /
|
UERC (Compliance Audit) Regulations, 2015 (English)
|
|
Accessible Version :
View
(180 KB) /
|