    Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd.
    Accessible Version : View (359 KB) 
    Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Grid Interactive Rooftop & Small Solar PV Generators under Suryodaya Swarozgar Yozna.
    Accessible Version : View (404 KB) 
    Petition for review of the Order dated 5th April, 2016 issued by the Commission on approval of Business Plan and determination of Multi Year Tariff for the second Control Period
    Accessible Version : View (413 KB) 
    Petition seeking adjustment of tariff of Vanala Small Hydro Project (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act
    Accessible Version : View (333 KB) 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Avani Bio Energy Pvt. Ltd.
    Accessible Version : View (403 KB) 
    Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERCRegulations, 2007/ sub-Regulation 14 of Regulation 5 of UERC
    Accessible Version : View (84 KB) 
    Petition for seeking approval of the Commission on Tender Document for Short Term Power Procurement.
    Accessible Version : View (330 KB) 
    Petition seeking carry forward of Renewable Purchase Obligation for FY 2014-15 amounting to 526.8 MU (Non-Solar) and 2.5 MU (Solar).
    Accessible Version : View (373 KB) 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (4.5 MW Canal Bank Grid connected Solar PV Plant).
    Accessible Version : View (370 KB) 
    Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2016-17 and onwards till reviewed
    Accessible Version : View (802 KB) 
    Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power (P) Ltd. and Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju III Small Hydro Power Project.
    Accessible Version : View (364 KB) 
    Suo-Moto proceedings on non-compliance of Renewable Purchase Obligation (RPO) by UPCL in accordance with UERC Regulations, 2010 & UERC Regulations, 2013.
    Accessible Version : View (259 KB) 
    Application seeking amendment in UERC (Guidelines for Appointment of Members and Procedures to be followed by the Forum for Redressal of Grievances of the Consumers) Regulations.
    Accessible Version : View (98 KB) 
    Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for investment for Increasing capacity of 220 kV Substation Chamba from 2×25 MVA to 1×50 MVA +1×25 MVA.
    Accessible Version : View (103 KB) 
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. 13/12/2019
    Accessible Version : View (71 KB) 
    Investment Approval for Implementation of Intra-State ABT Metering Scheme for On-Lining of ABT Meters to be installed at Interface Points for Energy Accounting & Transmission Level Energy Auditing
    Accessible Version : View (112 KB) 
    Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to component ‘A’ that is, regarding to transmission 15/11/2019
    Accessible Version : View (51 KB) 
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. 15/11/2019
    Accessible Version : View (52 KB) 
    Representation/Petition under Section 67(4) Of The Electricity Act, 2003 14/11/2019
    Accessible Version : View (83 KB) 
    Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC 22/10/2019
    Accessible Version : View (68 KB) 
    Petition for determination of Project Specific Tariff for Dunao Small Hydro Power Station (2 X 750 kW) of UJVN Ltd. under Section 62 and 86 of the Electricity 22/10/2019
    Accessible Version : View (244 KB) 
    Petitions filed under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission by UJVN Ltd. for approval of Capital investment
    Accessible Version : View (327 KB) 
    Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 22/10/2019
    Accessible Version : View (251 KB) 
    Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on open access Power 09/09/2019
    Accessible Version : View (69 KB) 
    Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide its Order dated 07.06.2019, upto October 09/09/2019
    Accessible Version : View (244 KB) 
    Petition for approval of Tariff rate revision from 70% CFA to Non CFA tariff rates for small solar plants, which already have 25 years PPA with UPCL 03/09/2019
    Accessible Version : View (252 KB) 
    Petition for seeking carry forward of surplus of 139.00 MU (Non-Solar) Renewable Purchase Obligation of FY 2018-19 as per the provision of UERC 03/09/2019
    Accessible Version : View (245 KB) 
    Petition to extend the benchmark capital cost and generic tariff as declared by on UERC vide order dated 23-07-2015, i.e. up to 30 Oct, 2016 for 23 Solar PV Power Plants
    Accessible Version : View (308 KB) 
    Application seeking clarification/elucidation of Order dated 07.01.2016 passed by the Commission directing UREDA to grant accreditation to M/s Him Urja Pvt. Ltd. on their application dated 22.06.2012.
    Accessible Version : View (420 KB) 
    Petition seeking Review of the order of the Commission dated April, 10, 2019 in petition no. 31 of 2017 seeking determination of project specific tariff for Tanga Hydro Power Project 03/09/2019
    Accessible Version : View (245 KB) 
    Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during 2013 to 2017 by Alps Industries Ltd. 15/07/2019
    Accessible Version : View (73 KB) 
    Review Petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 06.01.2016 passed by the Hon’ble UERC
    Accessible Version : View (95 KB) 
    Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to component A, that is, regarding to transmission charges 15/07/2019
    Accessible Version : View (155 KB) 
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. 15/07/2019
    Accessible Version : View (145 KB) 
    Gross Violation of the provisions of the Electricity Act, 2003, UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 and UERC 15/07/2019
    Accessible Version : View (69 KB) 
    Suo-moto proceedings initiated by the Commission for non-establishing the Complaint Handling Procedures in accordance with Clause 23.4 of the Distribution and Retail Supply Licence
    Accessible Version : View (192 KB) 
    Petition for approval of “Capital Investment for Renovation & Modernization” of 3×66 MW Ramganga HEP of UJVN Ltd.
    Accessible Version : View (130 KB) 
    APTEL’s Judgement dated 23.04.2019 in Appeal No. 287 of 2015. 10/07/2019
    Accessible Version : View (247 KB) 
    Petition seeking review of Impugned Order dated 20.06.2018 in Petition No. 04/2018 passed by the Commission under Section 94(1)(f) of the Electricity Act, 2003. 12/06/2019
    Accessible Version : View (237 KB) 
    Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. 02/04/2019
    Accessible Version : View (86 KB) 
    Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during 2013 to 2017 by Alps Industries Ltd. 30/05/2019
    Accessible Version : View (76 KB) 
    Petition for review of the Commission’s Order dated 30.07.2015 on “Petition for prior approval of Capital Investment for Renovation & Modernization of 3×30 MW MB-I HEP of UJVN Ltd”.
    Accessible Version : View (98 KB) 
    Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. 02/04/2019
    Accessible Version : View (246 KB) 
    Petition for investment approval of Construction of Colony at 132 kV Substation Majra Campus, Dehradun.
    Accessible Version : View (185 KB) 
    Suo-moto proceeding initiated by the Commission in the matter of transfer of 66 kV Substation and Lines from UPCL to PTCUL. 02/04/2019
    Accessible Version : View (65 KB) 
    Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power 12/03/2019
    Accessible Version : View (241 KB) 
    Dispute between M/s Bhilangana Hydro Power Limited and Uttarakhand Power Corporation Ltd., Regarding non-payment of Open Access Charges by UPCL for supply 12/03/2019
    Accessible Version : View (72 KB) 
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. 12/03/2019
    Accessible Version : View (148 KB) 
    Petition for review of the Commission’s Order dated 19.06.2018 read with letter No. 1144 dated 06.11.2018 on Suo moto proceeding regarding handing over of distribution business to UPCL. 11/02/2019
    Accessible Version : View (68 KB) 
    Review filed by UJVN Ltd. on Commission’s Order dated 13.03.2015 issued in the matter of prior approval of “Capital Investment for Renovation & Modernization of 3×10 MW Kulhal HEP”
    Accessible Version : View (129 KB) 
    Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 16.03.2017 passed by the Commission 22/01/2019
    Accessible Version : View (245 KB) 
    Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 21.08.2018 22/01/2019
    Accessible Version : View (245 KB) 
    Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its Order dated 06.09.2018, upto March 22/10/2019
    Accessible Version : View (244 KB) 
    Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence
    Accessible Version : View (158 KB) 
    Petition for determination of levelised tariff for Rooftop and Small Solar PV Power Plant as per the revised subsidy.
    Accessible Version : View (309 KB) 
    Petition under Section 86 (1)(a), Section 86(1)(f) read with Section 61(d) seeking directions to State Load Despatch Centre of Uttarakhand to consider Scheduled Capacity 20/12/2020
    Accessible Version : View (98 KB) 
    To grant permanent connectivity for 214MW (225 MW ISO) for Phase II of SEPL Power Project without any state transmission charges/losses upto Intra-State 22/12/2020
    Accessible Version : View (46 KB) 
    Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees 17/10/2020
    Accessible Version : View (78 KB) 
    Petition for determination of levelised tariff for Rooftop and Small Solar PV Power Plant as per the revised subsidy.
    Accessible Version : View (309 KB) 
    Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur 27/10/2020
    Accessible Version : View (79 KB) 
    Petition for extension of time for compliance of directions given by Hon’ble Commission vide order dated 07.01.2020 passed in the matter of relaxing/waiving 13/10/2020
    Accessible Version : View (83 KB) 
    Petition for issuing necessary directions for fixing the electricity rate as per the FY 2015-16 for the allocated Solar Power Plants with respect to the advertisement date 13/10/2020
    Accessible Version : View (99 KB) 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corp. Ltd. and Uttarakhand 13/10/2020
    Accessible Version : View (99 KB) 
    Application seeking approval of the Commission for investment on Under grounding of HT & LT Electrical Networks in Haridwar Town under IPDS Program- a flagship 25/08/2020
    Accessible Version : View (48 KB) 
    Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Gama Infraprop (P) Ltd.
    Accessible Version : View (493 KB) 
    Petition for development of 2 MW Solar Project located at Birpur, Dehradun which is under progress and to be connected at 33/11 kV Anarwala (MRS) Dehradun Cantt 18/08/2020
    Accessible Version : View (99 KB) 
    Petition seeking increase in ceiling limit of 1 MW applicable to grid connected rooftop and solar power plants to 2 MW under RE Regulations, 2018 for net metering arrangement. 18/08/2020
    Accessible Version : View (97 KB) 
    Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its order dated 11.05.2020, upto March 2022 18/08/2020
    Accessible Version : View (98 KB) 
    Prior approval of “Capital Investment for Renovation & Modernization of 4 x 36 MW Chilla HEP” of UJVN Ltd..
    Accessible Version : View (205 KB) 
    Application for determination of Term of use for Utilization of 220 kV S/c Dedicated Transmission Line of M/s Greenko Budhil Hydro Electrical Project 14/08/2020
    Accessible Version : View (107 KB) 
    Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. 29/05/2020
    Accessible Version : View (46 KB) 
    Representation/Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL 14/02/2020
    Accessible Version : View (110 KB) 
    Petition for Review of the UERC’s Order dated 11.04.2015 on “True-up of FY 2013-14, Annual Performance Review for FY 2014-15 and Annual Fixed Charges for FY 2015-16 for UJVN Ltd”.
    Accessible Version : View (192 KB) 
    Petition for seeking approval of the Commission for the investment on the Implementation of Real Time Data Acquisition System (RTDAS) for SAIFI/SAIDI 14/02/2020
    Accessible Version : View (59 KB) 
    Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 04/02/2020
    Accessible Version : View (100 KB) 
    Application seeking approval of Hon’ble Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and Selected bidders
    Accessible Version : View (433 KB) 
    Petition under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC
    Accessible Version : View (329 KB) 
    Application seeking determination of tariff for FY 2015-16 till FY 2018-19 in respect of Chuzachen Hydroelectric Power located on the rivers Rangpo and Rangli in the East district of Sikkim.
    Accessible Version : View (333 KB) 
    Petition seeking adjustment of tariff for Motighat Small Hydro Power Project (5 MW) unit of M/s Himalaya Hydro Pvt. Ltd. as per Section 61 and 62 of the Electricity Act
    Accessible Version : View (559 KB) 
    Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.
    Accessible Version : View (134 KB) 
    Petition filed by M/s Him Urja Pvt. Ltd. under UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010 seeking accreditation and issuance of Renewable Energy Certificates
    Accessible Version : View (356 KB) 
    Application seeking removal of difficulties/clarification in the UERC (Release of new HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.
    Accessible Version : View (121 KB) 
    Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Generators. AND
    Accessible Version : View (558 KB) 
    Order in the matter of Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2015 to 31.12.2015.
    Accessible Version : View (507 KB) 
    Inviting Comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra-State Open Access)Reg. 2015. 1. Public notice
    Accessible Version : View (677 KB) 
    Inviting Comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra-State Open Access)Regulations, 2015. 2.Petition
    Accessible Version : View (1 MB) 
    Multi Year Tariff (MYT) and Business Plan Petitions filed by the Govt. utilities and Pvt. Companies for the Control Period FY 2025-26 to FY 2027-28. (i). MYT Petition Vol-I
    Accessible Version : View (2 MB) 
    Multi Year Tariff (MYT) and Business Plan Petitions filed by the Govt. utilities and Pvt. Companies for the Control Period FY 2025-26 to FY 2027-28. (ii) MYT Petition_Vol-II
    Accessible Version : View (5 MB) 
    Business Plan Petition.
    Accessible Version : View (3 MB) 
    Commission’s letter dt. 24.01.25 to SLDC reg. load curve.
    Accessible Version : View (178 KB) 
    Commission’s letter dt. 24.01.25 to SLDC reg. load curve.
    Accessible Version : View (178 KB) 
    Commission’s letter dt. 17.01.25 to UPCL reg. addl. deficiencies in the MYT and Business Plan petitions.
    Accessible Version : View (515 KB) 
    Commission’s letter dt. 16.01.25 to UPCL reg. TVS meeting.
    Accessible Version : View (208 KB) 
    UPCL’s letter dt. 15.01.25 reg. deficiencies in the Business Plan petition.
    Accessible Version : View (3 MB) 
    UPCL’s letter dt. 15.01.25 reg. deficiencies in the MYT petition.
    Accessible Version : View (2 MB) 
    UPCL’s letter dt. 06.01.25 reg. deficiencies in the Business Plan petition.
    Accessible Version : View (2 MB) 
    UPCL’s letter dt. 06.01.25 reg. deficiencies in the MYT petition.
    Accessible Version : View (4 MB) 
    Commission’s letter dt. 30.12.24 to UPCL reg. deficiencies in the Business Plan petition.
    Accessible Version : View (982 KB) 
    Commission’s letter dt. 29.01.25 to UPCL reg. MoM of TVS meeting.
    Accessible Version : View (3 MB) 
    SLDC letter dt. 11.02.25 on load curve.
    Accessible Version : View (5 MB)