Documents related to government notifications, orders, reports, guidelines and more appear here.
Documents
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Application seeking approval of the Commission on adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act |
Accessible Version :
View
(151 KB)
|
|
| Dispute between M/s Bhilangana Hydro Power Ltd. and PTCUL regarding Late Payment Surcharge against payment of Transmission Charges for the alleged dedicated transmission network. |
Accessible Version :
View
(62 KB)
|
|
| Application seeking approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement for short term Power Purchase between Uttarakhand Power Corporation Ltd |
Accessible Version :
View
(93 KB)
|
|
| Petition under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 54 of the UERC (Conduct of Business) Regulation 2014 for review of the Order dated 17.05.2018 |
Accessible Version :
View
(230 KB)
|
|
| Petition seeking permission to set up Solar Power Plant of capacity 40 MW at Haripura Dam (27.34 MW) and Tumaria Dam (13.50 MW) in District Udham Singh Nagar |
Accessible Version :
View
(230 KB)
|
|
| Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 KV Substation & its 0.60 Km associated 66 kV line. |
Accessible Version :
View
(71 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreements for short term between Uttarakhand Power Corporation Limited and M/s Tata Power Trading |
Accessible Version :
View
(241 KB)
|
|
| Application seeking review of the Tariff Order issued by the Commission on 21.03.2018 on the Annual Revenue Requirement and Tariff Petition of UPCL for FY 2018-19. |
Accessible Version :
View
(240 KB)
|
|
| Petitions seeking approval of the Commission for advance banking of power to M/s PTC India Ltd., M/s Arunachal Pradesh Power Corporation Pvt. Ltd. & M/s Mittal Processors (P) Ltd |
Accessible Version :
View
(240 KB)
|
|
| Application seeking review of the Tariff Order issued by the Commission on 21.03.2018 on “True-up of FY 2016-17, Annual Performance Review for FY 2017-18 |
Accessible Version :
View
(65 KB)
|
|
| Suo-moto proceedings in the matter of Show Cause Notice issued to PTCUL under the provisions of Section 142 read with Section 149 of the Electricity Act, 2003 |
Accessible Version :
View
(95 KB)
|
|
| Suo-moto proceedings initiated by the Commission against non-compliance by UPCL of the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations |
Accessible Version :
View
(237 KB)
|
|
| Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and M/s Aglar Power Ltd. for Lagrasu Plant. |
Accessible Version :
View
(238 KB)
|
|
| Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and M/s Aglar Power Ltd. for Rayat Plant. |
Accessible Version :
View
(238 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power Trading Company Ltd. |
Accessible Version :
View
(240 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Manikaran Power Ltd. |
Accessible Version :
View
(352 KB)
|
|
| Petition under Section 86(1)(f) of the Electricity Act, 2003 read with Article 23 of the PPAs, seeking payment of outstanding dues from Uttarakhand Power Corp. Ltd. |
Accessible Version :
View
(231 KB)
|
|
| Petition for approval of the ‘Date of Commercial Operation’ (COD) of the damaged/non-functional 8 Small Hydro Power Plants (SHPs) on the date when the SHPs would start operating after renovation |
Accessible Version :
View
(418 KB)
|
|
| Suo moto proceeding initiated under Section 142 and Section 146 read with Section 149 of The Electricity Act, 2003 in the matter of violation of Section 12(b) of the Electricity Act |
Accessible Version :
View
(65 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Tata Power Trading Company Ltd. |
Accessible Version :
View
(241 KB)
|
|
| Petition under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC |
Accessible Version :
View
(261 KB)
|
|
| Petition under Section 86(1)(f) of the Electricity Act, 2003 read with Article 23 of the PPAs, seeking payment of outstanding dues from Uttarakhand Power Corp. Ltd |
Accessible Version :
View
(232 KB)
|
|
| In the Matter of: Suo-moto proceedings initiated by the Commission on the representation of Shri R.S. Yadav, Vice President-HR & Admin, M/s India Glycols Ltd. |
Accessible Version :
View
(66 KB)
|
|
| Petition for approval of “Additional Capital Works amounting to 44.05 Crore of 4×76 MW Maneri Bhali-II HEP”. |
Accessible Version :
View
(68 KB)
|
|
| Petition filed under Section 62 and 86(1)(a) of the Electricity Act , 2003, read with the relevant provisions of the Uttarakhand Electricity Regulatory Commission |
Accessible Version :
View
(469 KB)
|
|
| Application seeking clarification with regard to the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) |
Accessible Version :
View
(230 KB)
|
|
| Application under Regulation 50 of the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013. |
Accessible Version :
View
(228 KB)
|
|
| Petitions filed by UPCL seeking approval of the Commission on the Power Purchase Agreement entered into between |
Accessible Version :
View
(337 KB)
|
|
| Show cause Notice-cum-Notice for Personal Hearing issued to MD, UPCL in the matter of Non-compliance of sub-Regulation 14 of Regulation 5 & sub-Regulation |
Accessible Version :
View
(63 KB)
|
|
| Investment Approval for Procurement, Erection & Commissioning of 40 MVA, 132/33 kV Transformer and replacing the defective Transformer at 132 /33 kV Sub-station Roorkee |
Accessible Version :
View
(101 KB)
|
|
| Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Sravanthi Energy Pvt. Ltd |
Accessible Version :
View
(530 KB)
|
|
| Petition filed under Regulation 27(2) and 41 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 read with Regulations, 59 UERC (Conduct of Business) Regulations |
Accessible Version :
View
(134 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and M/s Manikaran Power Ltd. . |
Accessible Version :
View
(342 KB)
|
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and Sh. Rakesh Kumar. |
Accessible Version :
View
(381 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. |
Accessible Version :
View
(359 KB)
|
|
| Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Grid Interactive Rooftop & Small Solar PV Generators under Suryodaya Swarozgar Yozna. |
Accessible Version :
View
(404 KB)
|
|
| Petition for review of the Order dated 5th April, 2016 issued by the Commission on approval of Business Plan and determination of Multi Year Tariff for the second Control Period |
Accessible Version :
View
(413 KB)
|
|
| Petition seeking adjustment of tariff of Vanala Small Hydro Project (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act |
Accessible Version :
View
(333 KB)
|
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Avani Bio Energy Pvt. Ltd. |
Accessible Version :
View
(403 KB)
|
|
| Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERCRegulations, 2007/ sub-Regulation 14 of Regulation 5 of UERC |
Accessible Version :
View
(84 KB)
|
|
| Petition for seeking approval of the Commission on Tender Document for Short Term Power Procurement. |
Accessible Version :
View
(330 KB)
|
|
| Petition seeking carry forward of Renewable Purchase Obligation for FY 2014-15 amounting to 526.8 MU (Non-Solar) and 2.5 MU (Solar). |
Accessible Version :
View
(373 KB)
|
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (4.5 MW Canal Bank Grid connected Solar PV Plant). |
Accessible Version :
View
(370 KB)
|
|
| Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2016-17 and onwards till reviewed |
Accessible Version :
View
(802 KB)
|
|
| Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power (P) Ltd. and Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju III Small Hydro Power Project. |
Accessible Version :
View
(364 KB)
|
|
| Suo-Moto proceedings on non-compliance of Renewable Purchase Obligation (RPO) by UPCL in accordance with UERC Regulations, 2010 & UERC Regulations, 2013. |
Accessible Version :
View
(259 KB)
|
|
| Application seeking amendment in UERC (Guidelines for Appointment of Members and Procedures to be followed by the Forum for Redressal of Grievances of the Consumers) Regulations. |
Accessible Version :
View
(98 KB)
|
|
| Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for investment for Increasing capacity of 220 kV Substation Chamba from 2×25 MVA to 1×50 MVA +1×25 MVA. |
Accessible Version :
View
(103 KB)
|
|
| Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. | 13/12/2019 |
Accessible Version :
View
(71 KB)
|
| Investment Approval for Implementation of Intra-State ABT Metering Scheme for On-Lining of ABT Meters to be installed at Interface Points for Energy Accounting & Transmission Level Energy Auditing |
Accessible Version :
View
(112 KB)
|
|
| Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to component ‘A’ that is, regarding to transmission | 15/11/2019 |
Accessible Version :
View
(51 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. | 15/11/2019 |
Accessible Version :
View
(52 KB)
|
| Representation/Petition under Section 67(4) Of The Electricity Act, 2003 | 14/11/2019 |
Accessible Version :
View
(83 KB)
|
| Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC | 22/10/2019 |
Accessible Version :
View
(68 KB)
|
| Petition for determination of Project Specific Tariff for Dunao Small Hydro Power Station (2 X 750 kW) of UJVN Ltd. under Section 62 and 86 of the Electricity | 22/10/2019 |
Accessible Version :
View
(244 KB)
|
| Petitions filed under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission by UJVN Ltd. for approval of Capital investment |
Accessible Version :
View
(327 KB)
|
|
| Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 | 22/10/2019 |
Accessible Version :
View
(251 KB)
|
| Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on open access Power | 09/09/2019 |
Accessible Version :
View
(69 KB)
|
| Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide its Order dated 07.06.2019, upto October | 09/09/2019 |
Accessible Version :
View
(244 KB)
|
| Petition for approval of Tariff rate revision from 70% CFA to Non CFA tariff rates for small solar plants, which already have 25 years PPA with UPCL | 03/09/2019 |
Accessible Version :
View
(252 KB)
|
| Petition for seeking carry forward of surplus of 139.00 MU (Non-Solar) Renewable Purchase Obligation of FY 2018-19 as per the provision of UERC | 03/09/2019 |
Accessible Version :
View
(245 KB)
|
| Petition to extend the benchmark capital cost and generic tariff as declared by on UERC vide order dated 23-07-2015, i.e. up to 30 Oct, 2016 for 23 Solar PV Power Plants |
Accessible Version :
View
(308 KB)
|
|
| Application seeking clarification/elucidation of Order dated 07.01.2016 passed by the Commission directing UREDA to grant accreditation to M/s Him Urja Pvt. Ltd. on their application dated 22.06.2012. |
Accessible Version :
View
(420 KB)
|
|
| Petition seeking Review of the order of the Commission dated April, 10, 2019 in petition no. 31 of 2017 seeking determination of project specific tariff for Tanga Hydro Power Project | 03/09/2019 |
Accessible Version :
View
(245 KB)
|
| Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during 2013 to 2017 by Alps Industries Ltd. | 15/07/2019 |
Accessible Version :
View
(73 KB)
|
| Review Petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 06.01.2016 passed by the Hon’ble UERC |
Accessible Version :
View
(95 KB)
|
|
| Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to component A, that is, regarding to transmission charges | 15/07/2019 |
Accessible Version :
View
(155 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. | 15/07/2019 |
Accessible Version :
View
(145 KB)
|
| Gross Violation of the provisions of the Electricity Act, 2003, UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 and UERC | 15/07/2019 |
Accessible Version :
View
(69 KB)
|
| Suo-moto proceedings initiated by the Commission for non-establishing the Complaint Handling Procedures in accordance with Clause 23.4 of the Distribution and Retail Supply Licence |
Accessible Version :
View
(192 KB)
|
|
| Petition for approval of “Capital Investment for Renovation & Modernization” of 3×66 MW Ramganga HEP of UJVN Ltd. |
Accessible Version :
View
(130 KB)
|
|
| APTEL’s Judgement dated 23.04.2019 in Appeal No. 287 of 2015. | 10/07/2019 |
Accessible Version :
View
(247 KB)
|
| Petition seeking review of Impugned Order dated 20.06.2018 in Petition No. 04/2018 passed by the Commission under Section 94(1)(f) of the Electricity Act, 2003. | 12/06/2019 |
Accessible Version :
View
(237 KB)
|
| Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. | 02/04/2019 |
Accessible Version :
View
(86 KB)
|
| Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during 2013 to 2017 by Alps Industries Ltd. | 30/05/2019 |
Accessible Version :
View
(76 KB)
|
| Petition for review of the Commission’s Order dated 30.07.2015 on “Petition for prior approval of Capital Investment for Renovation & Modernization of 3×30 MW MB-I HEP of UJVN Ltd”. |
Accessible Version :
View
(98 KB)
|
|
| Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. | 02/04/2019 |
Accessible Version :
View
(246 KB)
|
| Petition for investment approval of Construction of Colony at 132 kV Substation Majra Campus, Dehradun. |
Accessible Version :
View
(185 KB)
|
|
| Suo-moto proceeding initiated by the Commission in the matter of transfer of 66 kV Substation and Lines from UPCL to PTCUL. | 02/04/2019 |
Accessible Version :
View
(65 KB)
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power | 12/03/2019 |
Accessible Version :
View
(241 KB)
|
| Dispute between M/s Bhilangana Hydro Power Limited and Uttarakhand Power Corporation Ltd., Regarding non-payment of Open Access Charges by UPCL for supply | 12/03/2019 |
Accessible Version :
View
(72 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. | 12/03/2019 |
Accessible Version :
View
(148 KB)
|
| Petition for review of the Commission’s Order dated 19.06.2018 read with letter No. 1144 dated 06.11.2018 on Suo moto proceeding regarding handing over of distribution business to UPCL. | 11/02/2019 |
Accessible Version :
View
(68 KB)
|
| Review filed by UJVN Ltd. on Commission’s Order dated 13.03.2015 issued in the matter of prior approval of “Capital Investment for Renovation & Modernization of 3×10 MW Kulhal HEP” |
Accessible Version :
View
(129 KB)
|
|
| Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 16.03.2017 passed by the Commission | 22/01/2019 |
Accessible Version :
View
(245 KB)
|
| Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 21.08.2018 | 22/01/2019 |
Accessible Version :
View
(245 KB)
|
| Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its Order dated 06.09.2018, upto March | 22/10/2019 |
Accessible Version :
View
(244 KB)
|
| Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence |
Accessible Version :
View
(158 KB)
|
|
| Petition for determination of levelised tariff for Rooftop and Small Solar PV Power Plant as per the revised subsidy. |
Accessible Version :
View
(309 KB)
|
|
| Petition under Section 86 (1)(a), Section 86(1)(f) read with Section 61(d) seeking directions to State Load Despatch Centre of Uttarakhand to consider Scheduled Capacity | 20/12/2020 |
Accessible Version :
View
(98 KB)
|
| To grant permanent connectivity for 214MW (225 MW ISO) for Phase II of SEPL Power Project without any state transmission charges/losses upto Intra-State | 22/12/2020 |
Accessible Version :
View
(46 KB)
|
| Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees | 17/10/2020 |
Accessible Version :
View
(78 KB)
|
| Petition for determination of levelised tariff for Rooftop and Small Solar PV Power Plant as per the revised subsidy. |
Accessible Version :
View
(309 KB)
|
|
| Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur | 27/10/2020 |
Accessible Version :
View
(79 KB)
|
| Petition for extension of time for compliance of directions given by Hon’ble Commission vide order dated 07.01.2020 passed in the matter of relaxing/waiving | 13/10/2020 |
Accessible Version :
View
(83 KB)
|
| Petition for issuing necessary directions for fixing the electricity rate as per the FY 2015-16 for the allocated Solar Power Plants with respect to the advertisement date | 13/10/2020 |
Accessible Version :
View
(99 KB)
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corp. Ltd. and Uttarakhand | 13/10/2020 |
Accessible Version :
View
(99 KB)
|
| Application seeking approval of the Commission for investment on Under grounding of HT & LT Electrical Networks in Haridwar Town under IPDS Program- a flagship | 25/08/2020 |
Accessible Version :
View
(48 KB)
|
| Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Gama Infraprop (P) Ltd. |
Accessible Version :
View
(493 KB)
|
|
| Petition for development of 2 MW Solar Project located at Birpur, Dehradun which is under progress and to be connected at 33/11 kV Anarwala (MRS) Dehradun Cantt | 18/08/2020 |
Accessible Version :
View
(99 KB)
|