Repeated violation of Regulation 40 of CBR, clause 11 of licence conditions and directions of the Commission issued in its various orders by UPCL.
|
|
Accessible Version :
View
(105 KB) /
|
Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand.
|
|
Accessible Version :
View
(51 KB) /
|
Review/Reconsideration Petition filed by PTCUL under Regulation 54, 59 and 62 of the UERC (Conduct of Business) Regulations, 2014 r/w relevant provisions of Electricity Act 2003
|
|
Accessible Version :
View
(76 KB) /
|
Application seeking approval for the investment on the project covering the construction of 03 Nos., 33/11 kV Substations & their associated 33 kV line.
|
08/04/2019 |
Accessible Version :
View
(121 KB) /
|
Petition seeking approval for increasing the Continuous Supply Surcharge as approved by the Commission in the Tariff Order dated 31.03.2022 for FY 2022-23.
|
|
Accessible Version :
View
(54 KB) /
|
Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant
|
|
Accessible Version :
View
(76 KB) /
|
Petition seeking permission to set up Solar Power Plant of capacity 50 MW at Village Adhar Mafi, Kujyadi, Dehli in District Almora, Uttarakhand, for sale of electricity by Van Panchayat
|
08/04/2019 |
Accessible Version :
View
(121 KB) /
|
Revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31.03.2022 for FY 2022-23.
|
|
Accessible Version :
View
(55 KB) /
|
Unplanned and irregular load shedding/curtailment of power by Uttarakhand Power Corporation Limited during the period 01st of March 2022 to 30th June 2022 and being continued till date.
|
|
Accessible Version :
View
(57 KB) /
|
Petition for seeking Removal of Difficulty in Implementation of Modified Time of Day Metering as provided in Clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23.
|
|
Accessible Version :
View
(54 KB) /
|
Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 (“Electricity Act”) read with Regulation 54 of the UERC (Conduct of Business) Regulations
|
|
Accessible Version :
View
(99 KB) /
|
Petition seeking grant of permission to connect 33 kV dedicated line from 15 MW Captive Solar Power Plant to the stepdown side of 132/33 kV switchyard of Kashi Vishwanath Steels Pvt. Ltd.
|
|
Accessible Version :
View
(63 KB) /
|
Suo-moto proceeding initiated under Section 142 and Section 146 read with Section 149 of The Electricity Act, 2003 in the matter of violation of Section 12(b) of the Electricity Act
|
|
Accessible Version :
View
(118 KB) /
|
Compliance of Reports/Plans/Procedures by the Distribution Licensee as per the UERC (Distribution Code) regulations, 2018.
|
|
Accessible Version :
View
(70 KB) /
|
Petition for review of the Commission’s Tariff Order dated 31.03.2022 on the ARR & Tariff Petition for FY 2022-23 filed by UPCL.
|
|
Accessible Version :
View
(97 KB) /
|
Applicability of Rate Schedule RTS-4A: Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017 (UPCL Vs. UERC & M/s Flex Foods Ltd.).
|
|
Accessible Version :
View
(99 KB) /
|
Petition for issuing necessary directions to UPCL to withdraw invoices issued against the Petitioner imposing 25% additional Temporary Supply Tariff and issue
|
|
Accessible Version :
View
(98 KB) /
|
Petition seeking extension of Control Period of the Benchmark Capital Cost & Generic Tariff as declared by the Commission vide its Orders dated 11.05.2020, 30.09.2020 and 05.10.2020 till March
|
|
Accessible Version :
View
(99 KB) /
|
Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar generating project of the Petitioner.
|
|
Accessible Version :
View
(98 KB) /
|
Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar generating project of the Petitioner.
|
|
Accessible Version :
View
(99 KB) /
|
Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP for evacuating power from generating stations operating in Ravi Basin
|
|
Accessible Version :
View
(106 KB) /
|
Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity
|
|
Accessible Version :
View
(79 KB) /
|
Miscellaneous Petition, inter alia amongst other grounds concerning refund of MDC/LPS charges by illegal disconnection and for determining whether Minimum Demand Charges
|
|
Accessible Version :
View
(75 KB) /
|
Suo-moto proceedings initiated by the Commission in the matter of Noncompliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the UERC
|
|
Accessible Version :
View
(57 KB) /
|
Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021
|
|
Accessible Version :
View
(58 KB) /
|
Suo-moto proceedings in the matter of finalization of Station Heat Rate of Gas based Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. and Sravanthi
|
05/04/2019 |
Accessible Version :
View
(673 KB) /
|
Application seeking approval for the investment on the project covering the construction of 05 No. 33/11 KV Substations & their associated 33 KV Line and 06 No. 33 KV Feeders
|
04/04/2019 |
Accessible Version :
View
(211 KB) /
|
Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the order dated 16.03.2017 passed by the Commission
|
02/04/2019 |
Accessible Version :
View
(395 KB) /
|
Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the order dated 16.03.2017 passed by the Commission
|
02/04/2019 |
Accessible Version :
View
(493 KB) /
|
Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the order dated 21.08.2018 passed by the Commission in the matter of determination
|
02/04/2019 |
Accessible Version :
View
(493 KB) /
|
Construction of 2×50 MVA 220/33 kV GIS Substation, Selaqui, Dehradun & its associated LILO of 220 kV Khodri-Jhajhra line at proposed 220/33 kV S/s Selaqui, Dehradun.
|
12/03/2019 |
Accessible Version :
View
(86 KB) /
|
Review Petition filed by UJVN Ltd. under section 94(1) (f) of the Electricity Act, 2003 read with Regulation 54 of UERC (Conduct of Business) Regulations, 2014 seeking
|
07/03/2019 |
Accessible Version :
View
(172 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2019 to 31.03.2019.
|
05/03/2019 |
Accessible Version :
View
(443 KB) /
|
Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its order dated 06.09.2018, upto March, 2020
|
01/02/2019 |
Accessible Version :
View
(356 KB) /
|
Review Petition filed by M/s Bhilangana Hydro Power Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 54 of UERC (Conduct of Business) Regulations
|
24/05/2019 |
Accessible Version :
View
(313 KB) /
|
Application seeking approval for the investment on the project covering laying of 3250 Km. LT AB cable in theft prone and other areas of District Dehradun, Uttarkashi, Pauri, Haridwar, Nainital
|
21/01/2019 |
Accessible Version :
View
(153 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s A B Renewable Energy Pvt. Ltd
|
15/01/2019 |
Accessible Version :
View
(298 KB) /
|
Petition seeking approval of one time registration fee and annual fee to be collected from obligated entities for registration under Renewable Purchase Obligation Compliance system (RPOCS)
|
14/01/2019 |
Accessible Version :
View
(399 KB) /
|
Petition under Section 86(1) (e) and 86(1) (f) claiming deemed generation in respect of 12.6 MW Sarju II Smal Hydro Power Project of Uttar Bharat Hydro Power Private Limited.
|
06/10/2023 |
Accessible Version :
View
(53 KB) /
|
Suo-moto proceeding initiated by the Commission for non-compliance of Commission’s directions issued vide Commission’s Order dated 06.07.2022 & 20.07.2022
|
15/09/2023 |
Accessible Version :
View
(69 KB) /
|
Miscellaneous Petition challenging the Regulation No. 6.1 of the Uttarakhand Electricity Regulatory Commission (The Electricity Supply Code, Release of New Connections and Related Matters)
|
15/09/2023 |
Accessible Version :
View
(57 KB) /
|
Petition filed by M/s Bhilangana Hydro Power Ltd., under Section 86 read with Section 181 of the Electricity Act, 2003 read with the Order dated 20.06.2023
|
07/08/2023 |
Accessible Version :
View
(57 KB) /
|
Petition under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 50(6) of the Uttarakhand Electricity Regulatory Commission
|
01/08/2023 |
Accessible Version :
View
(100 KB) /
|
Petition seeking to allow approximate cumulative capacity of 246.5 MW to be allotted to eligible applicants against ground mounted solar power plants having capacity size of 20/25/50/100/200 kW
|
03/07/2023 |
Accessible Version :
View
(61 KB) /
|
Suo-moto proceedings in the matter of request for seeking approval of revised payment terms for release of gas payments.
|
31/05/2023 |
Accessible Version :
View
(98 KB) /
|
Petition for Investment Approvals of Transmission Projects under UTSDIP Scheme under ADB Funding for: (1) Establishment of NABL
|
13/04/2023 |
Accessible Version :
View
(81 KB) /
|
Show Cause Notice-cum-Notice for Personal Hearing under Section 142 read with Section 149 of The Electricity Act, 2003, in the matter of non-compliance to Commission’s Orders
|
13/04/2023 |
Accessible Version :
View
(74 KB) /
|
Petition filed by UJVN Ltd. Under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity
|
18/01/2023 |
Accessible Version :
View
(79 KB) /
|
Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid
|
03/01/2023 |
Accessible Version :
View
(75 KB) /
|
Preconsider/Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for removal of difficulty and review of the Order dated 22.09.2021
|
03/01/2023 |
Accessible Version :
View
(77 KB) /
|
Petition seeking approval on the draft plan to pass on the benefit in electricity tariff to the end consumers of the State.
|
08/11/2020 |
Accessible Version :
View
(747 KB) /
|
Application seeking approval of the Commission for investment on Under grounding of HT & LT Electrical Networks in Haridwar Town under IPDS Program- a flagship program of Ministry of Power
|
08/12/2020 |
Accessible Version :
View
(168 KB) /
|
Suo-moto proceedings w.r.t. implementation of Hon’ble APTEL’s Judgement dated 28.08.2024 in Appeal No. 100 of 2017 and Appeal No. 389 of 2018.
|
17/12/2024 |
Accessible Version :
View
(100 KB) /
|
Suo-moto proceeding in the matter of Show Cause Notice under Section 142 of the Electricity Act, 2003, read with Regulation 3.3.2(4) of the UERC (The Electricity Supply Code
|
13/11/2024 |
Accessible Version :
View
(67 KB) /
|
Petition seeking determination of Term of Use for Utilisation of 220 kV S/c dedicated Transmission line of M/s Greenko Budhil Hydro Electrical Project for evacuation of power
|
04/12/2020 |
Accessible Version :
View
(265 KB) /
|
Petition for review of the Tariff Order dated 18.04.2020 with respect to the truing up of Non-Tariff Income for the FY 2018-19.
|
03/12/2020 |
Accessible Version :
View
(109 KB) /
|
Suo-moto proceeding in the matter of Show-cause Notice dated 30.07.2024 under Section 142 of the Electricity Act, 2003 in the matter of Complaint filed by M/s Kashi Vishwanath Steels Pvt. Ltd.
|
05/11/2024 |
Accessible Version :
View
(60 KB) /
|
Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees and Rs. 55,080/-
|
01/11/2020 |
Accessible Version :
View
(195 KB) /
|
Petition seeking Approval of Releasing of Additional 2000 kVA Load (Total Contracted Load of 12000 kVA) on a Supply Voltage Line of 33 kV and thereby Providing Relaxation Over Regulation
|
05/11/2024 |
Accessible Version :
View
(62 KB) /
|
Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur as the land belonging
|
01/11/2020 |
Accessible Version :
View
(230 KB) /
|
Application seeking Review under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 read with relevant provisions of the Electricity Act, 2003 for review of the Order dated 18.04.2020
|
20/11/2020 |
Accessible Version :
View
(250 KB) /
|
Petition for determination of Project Specific Tariff for Kaliganga-II (2×2.25 MW) Small Hydro Power Station of UJVN Ltd. under Sections 62(1)(a) and 86(1)(a) of the Electricity Act
|
15/10/2024 |
Accessible Version :
View
(102 KB) /
|
Petition for review of the Commission’s Order dated 18.04.2020 on True up for FY 2018-19, Annual Performance Review for FY 2019-20 and Annual Revenue Requirement for FY 2020-21.
|
11/11/2020 |
Accessible Version :
View
(582 KB) /
|
Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued.
|
04/10/2024 |
Accessible Version :
View
(56 KB) /
|
Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL to an individual consumer connected to the electrical network
|
04/11/2020 |
Accessible Version :
View
(193 KB) /
|
Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued.
|
04/10/2024 |
Accessible Version :
View
(57 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and Uttarakhand Power Development
|
19/10/2020 |
Accessible Version :
View
(189 KB) /
|
Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued.
|
04/10/2024 |
Accessible Version :
View
(57 KB) /
|
Application for adjudication of dispute between Beta Infratech Private Limited and Uttarakhand Power Corporation Limited in respect of termination of Power Purchase Agreement
|
07/10/2020 |
Accessible Version :
View
(376 KB) /
|
Hon’ble APTEL’s Judgement dated 19.07.2024 on Appeal no. 215 of 2016 w.r.t. ‘Denial of 50% of the excess IDC and 50% of price variation component of capital cost for MB-II project’.
|
26/09/2024 |
Accessible Version :
View
(69 KB) /
|
Hon’ble APTEL’s Order dated 19.07.2024 on Appeal No. 215 of 2016 w.r.t. ‘Denial of 50% of the excess IDC and 50% of price variation component of capital cost for MB-II project.
|
27/09/2024 |
Accessible Version :
View
(66 KB) /
|
Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 11.05.2020, upto March, 2020
|
05/10/2020 |
Accessible Version :
View
(149 KB) /
|
Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020
|
28/08/2024 |
Accessible Version :
View
(66 KB) /
|
Review Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC
|
20/08/2024 |
Accessible Version :
View
(73 KB) /
|
Extension of the period of applicability of the benchmark capital cost and levellised generic tariff issued by the Commission for Solar Energy based plants vide Suo-moto Order dated 07.06.2019
|
30/09/2020 |
Accessible Version :
View
(149 KB) /
|
Petition for review of the Commission’s Tariff Order dated 28.03.2024 on the Annual Revenue Requirement & Tariff Petition for FY 2024-25.
|
14/08/2024 |
Accessible Version :
View
(97 KB) /
|
Review Petition in the matter of order dated March 28, 2024 in Pet. No. 49 of 2023 of Power Transmission Corporation of Uttarakhand Limited for true up for FY 2022-23, Annual Performance Review
|
23/07/2024 |
Accessible Version :
View
(54 KB) /
|
Application seeking review of the UERC’s Tariff Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24, and Annual Fixed Charges for FY 2024-25.
|
23/07/2024 |
Accessible Version :
View
(55 KB) /
|
Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020.
|
12/07/2024 |
Accessible Version :
View
(63 KB) /
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
22/09/2020 |
Accessible Version :
View
(143 KB) /
|
Petition filed under Regulation 9,20,58,59,61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 3.6 and chapter -8 Regulation 1 to 3 of UERC Supply Code Regulation
|
12/07/2024 |
Accessible Version :
View
(80 KB) /
|
Petition under Section 62 and 84 of the Electricity Act, 2003 read with Regulation 50(6) of the UERC (Terms and Conditions for Determination of MYT) Regulations, 2018 & 2021 for recovery
|
09/07/2024 |
Accessible Version :
View
(63 KB) /
|
Petition for seeking investment approval on the project for covering the construction of 02 nos. 33/11 kV Substations & their associated 24.30 Kms. 33 kV Line.
|
15/09/2020 |
Accessible Version :
View
(178 KB) /
|
Petition under Section 61, 62 & 86 of the EA, 2003 read with Regulations 50(6) of the UERC (Terms & Conditions for Determination of MYT) Regulations, 2018 & 2021
|
09/07/2024 |
Accessible Version :
View
(66 KB) /
|
Petition for fixation of voltage wise distribution loss or reduction of approved distribution loss for open access captive solar power plants under Uttarakhand State Solar Policy, 2023.
|
09/07/2024 |
Accessible Version :
View
(97 KB) /
|
Suo-moto proceeding initiated by the Commission for non-compliance of Regulation 3.4.3(11) of UERC (The Electricity Supply Code, Release of new Connections and Related Matters) Regulations
|
17/05/2024 |
Accessible Version :
View
(88 KB) /
|
Petition seeking increase in ceiling limit of 1 MW applicable to Grid Interactive Rooftop and Small Solar PV Plants to 2 MW under RE Regulations, 2018 for net metering arrangement.
|
17/09/2020 |
Accessible Version :
View
(163 KB) /
|
Investment Approval for DPR of “Establishment of NABL Accredited Oil Test Laboratory with associated office building and Transit hostel at 220 kV Substation, Ramnagar, Roorkee.
|
17/05/2024 |
Accessible Version :
View
(76 KB) /
|
Suo-moto Order on the request of UPCL for determination of Tariff considering subsidy at the rate of 80% for the Solar Projects installed/to be installed under PM-Kusum Yojana
|
15/09/2020 |
Accessible Version :
View
(253 KB) /
|
Application seeking amendment in UERC Tariff Regulations, 2018.
|
30/09/2020 |
Accessible Version :
View
(97 KB) /
|
Petition under Section 86(1)(f) and (e) of the Electricity Act, 2003 read with Regulation 49 of the UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources
|
03/04/2024 |
Accessible Version :
View
(80 KB) /
|
Application seeking prior approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Bhilangana Hydro Power Ltd.
|
29/07/2020 |
Accessible Version :
View
(190 KB) /
|
Petition for resolution of matter pertaining to “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corp.
|
22/03/2024 |
Accessible Version :
View
(102 KB) /
|
Petition seeking approval of the Commission for advance and return banking of power with M/s Arunachal Pradesh Power Corporation Pvt. Ltd., M/s PTC India Ltd., M/s Kreate Energy
|
20/07/2020 |
Accessible Version :
View
(247 KB) /
|
Petition for resolution of matter pertaining to “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corp.
|
22/03/2024 |
Accessible Version :
View
(102 KB) /
|
Time extension in scheduled commissioning date of Solar PV Plants to be developed by various developers in the State of Uttarakhand considering disruption due to lockdown
|
23/06/2020 |
Accessible Version :
View
(191 KB) /
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
19/06/2020 |
Accessible Version :
View
(138 KB) /
|
Reconsideration/Review of Order dated 17.10.2023 passed by the Commission in Petition No. 30 of 2023.
|
01/02/2024 |
Accessible Version :
View
(72 KB) /
|
Deployment of customised Renewable Purchase Obligation Compliance System (RPOCS) Web Tool in Uttarakhand.
|
19/06/2020 |
Accessible Version :
View
(122 KB) /
|
Petition under Section 86(1)(f) of Electricity Act 2003, Regulation 59 of UERC (Conduct of Business) Regulations, 2014 and Regulation 103 & 104 of UERC (MYT) Regulations
|
25/01/2024 |
Accessible Version :
View
(101 KB) /
|