| Petition seeking increase in ceiling limit of 1 MW applicable to grid connected rooftop and solar power plants to 2 MW under RE Regulations, 2018 for net metering arrangement. | 18/08/2020 |
Accessible Version :
View
(97 KB)
|
| Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its order dated 11.05.2020, upto March 2022 | 18/08/2020 |
Accessible Version :
View
(98 KB)
|
| Prior approval of “Capital Investment for Renovation & Modernization of 4 x 36 MW Chilla HEP” of UJVN Ltd.. |
Accessible Version :
View
(205 KB)
|
|
| Application for determination of Term of use for Utilization of 220 kV S/c Dedicated Transmission Line of M/s Greenko Budhil Hydro Electrical Project | 14/08/2020 |
Accessible Version :
View
(107 KB)
|
| Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. | 29/05/2020 |
Accessible Version :
View
(46 KB)
|
| Representation/Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL | 14/02/2020 |
Accessible Version :
View
(110 KB)
|
| Petition for Review of the UERC’s Order dated 11.04.2015 on “True-up of FY 2013-14, Annual Performance Review for FY 2014-15 and Annual Fixed Charges for FY 2015-16 for UJVN Ltd”. |
Accessible Version :
View
(192 KB)
|
|
| Petition for seeking approval of the Commission for the investment on the Implementation of Real Time Data Acquisition System (RTDAS) for SAIFI/SAIDI | 14/02/2020 |
Accessible Version :
View
(59 KB)
|
| Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 | 04/02/2020 |
Accessible Version :
View
(100 KB)
|
| Application seeking approval of Hon’ble Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and Selected bidders |
Accessible Version :
View
(433 KB)
|
|
| Petition under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC |
Accessible Version :
View
(329 KB)
|
|
| Application seeking determination of tariff for FY 2015-16 till FY 2018-19 in respect of Chuzachen Hydroelectric Power located on the rivers Rangpo and Rangli in the East district of Sikkim. |
Accessible Version :
View
(333 KB)
|
|
| Petition seeking adjustment of tariff for Motighat Small Hydro Power Project (5 MW) unit of M/s Himalaya Hydro Pvt. Ltd. as per Section 61 and 62 of the Electricity Act |
Accessible Version :
View
(559 KB)
|
|
| Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005. |
Accessible Version :
View
(134 KB)
|
|
| Petition filed by M/s Him Urja Pvt. Ltd. under UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010 seeking accreditation and issuance of Renewable Energy Certificates |
Accessible Version :
View
(356 KB)
|
|
| Application seeking removal of difficulties/clarification in the UERC (Release of new HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008. |
Accessible Version :
View
(121 KB)
|
|
| Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Generators. AND |
Accessible Version :
View
(558 KB)
|
|
| Order in the matter of Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2015 to 31.12.2015. |
Accessible Version :
View
(507 KB)
|
|
| Inviting Comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra-State Open Access)Reg. 2015. 1. Public notice |
Accessible Version :
View
(677 KB)
|
|
| Inviting Comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra-State Open Access)Regulations, 2015. 2.Petition |
Accessible Version :
View
(1 MB)
|
|
| Multi Year Tariff (MYT) and Business Plan Petitions filed by the Govt. utilities and Pvt. Companies for the Control Period FY 2025-26 to FY 2027-28. (i). MYT Petition Vol-I |
Accessible Version :
View
(2 MB)
|
|
| Multi Year Tariff (MYT) and Business Plan Petitions filed by the Govt. utilities and Pvt. Companies for the Control Period FY 2025-26 to FY 2027-28. (ii) MYT Petition_Vol-II |
Accessible Version :
View
(5 MB)
|
|
| Business Plan Petition. |
Accessible Version :
View
(3 MB)
|
|
| Commission’s letter dt. 24.01.25 to SLDC reg. load curve. |
Accessible Version :
View
(178 KB)
|
|
| Commission’s letter dt. 24.01.25 to SLDC reg. load curve. |
Accessible Version :
View
(178 KB)
|
|
| Commission’s letter dt. 17.01.25 to UPCL reg. addl. deficiencies in the MYT and Business Plan petitions. |
Accessible Version :
View
(515 KB)
|
|
| Commission’s letter dt. 16.01.25 to UPCL reg. TVS meeting. |
Accessible Version :
View
(208 KB)
|
|
| UPCL’s letter dt. 15.01.25 reg. deficiencies in the Business Plan petition. |
Accessible Version :
View
(3 MB)
|
|
| UPCL’s letter dt. 15.01.25 reg. deficiencies in the MYT petition. |
Accessible Version :
View
(2 MB)
|
|
| UPCL’s letter dt. 06.01.25 reg. deficiencies in the Business Plan petition. |
Accessible Version :
View
(2 MB)
|
|
| UPCL’s letter dt. 06.01.25 reg. deficiencies in the MYT petition. |
Accessible Version :
View
(4 MB)
|
|
| Commission’s letter dt. 30.12.24 to UPCL reg. deficiencies in the Business Plan petition. |
Accessible Version :
View
(982 KB)
|
|
| Commission’s letter dt. 29.01.25 to UPCL reg. MoM of TVS meeting. |
Accessible Version :
View
(3 MB)
|
|
| SLDC letter dt. 11.02.25 on load curve. |
Accessible Version :
View
(5 MB)
|
|
| UPCL’s letter dt. 03.02.25 on capitalisation works for FY 2023-24. |
Accessible Version :
View
(241 KB)
|
|
| Commission’s letter dt. 05.02.25 to UPCL reg. addl. deficiencies in the MYT and Business Plan petitions. |
Accessible Version :
View
(493 KB)
|
|
| Commission’s letter dt. 06.02.25 to UPCL reg. stakeholders comments. |
Accessible Version :
View
(371 KB)
|
|
| UPCL’s letter dt. 07.02.25 reg. MoM of TVS meeting. |
Accessible Version :
View
(6 MB)
|
|
| Commission’s letter dt. 14.02.25 to UPCL reg. addl. deficiencies in the MYT and Business Plan petitions. |
Accessible Version :
View
(455 KB)
|
|
| UPCL’s letter dt. 16.12.24 on capitalisation works for FY 2023-24.. |
Accessible Version :
View
(455 KB)
|
|
| UPCL’s letter dt. 27.01.25. |
Accessible Version :
View
(3 MB)
|
|
| UPCL’s letter dt. 14.02.25 reg. addl. deficiencies in the MYT petition. |
Accessible Version :
View
(3 MB)
|
|
| UPCL’s letter dt. 20.02.25 on capitalisation works for FY 2022-23. |
Accessible Version :
View
(359 KB)
|
|
| Commission’s letter dt. 21.02.25 to UPCL reg. stakeholders comments. |
Accessible Version :
View
(256 KB)
|
|
| Petition to extend the benchmark capital cost & generic tariff as declared by UERC vide its Order dated 16.06.2016, i.e. upto 31.07.2017 for Grid Interactive Rooftop and Small Solar Power Plants. | 16/05/2017 |
Accessible Version :
View
(305 KB)
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Mittal Processors Pvt. Ltd. | 16/05/2017 |
Accessible Version :
View
(195 KB)
|
| Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC | 16/05/2017 |
Accessible Version :
View
(859 KB)
|
| Application seeking approval for the investment for improvement of Bill Collection Facilities of UPCL in lieu of the Order dated 01.09.2005 passed by the Commission | 15/05/2017 |
Accessible Version :
View
(95 KB)
|
| Petition to relax or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC | 09/05/2017 |
Accessible Version :
View
(183 KB)
|
| Petition filed under Regulation 37(1) of the UERC(Conduct of Business) Regulations, 2014, Clause 3.2 and 14.A of the Transmission License read with Section 18 | 03/05/2017 |
Accessible Version :
View
(111 KB)
|
| Approval for Construction of Separate Building of SLDC at 132 kV Sub-Station Majra Campus, Dehradun. | 01/05/2017 |
Accessible Version :
View
(140 KB)
|
| Petition to review/reconsider the Order dated January 25, 2017 passed by the Commission in the matter of petition filed by M/s GIPL for amendment of Clause No. 9 relating to “Billing and Payment” | 17/04/2017 |
Accessible Version :
View
(470 KB)
|
| Petition filed under Regulation 9, 20, 58, 59, 61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 49 and 50 of UERC RE Regulation, 2013 | 12/04/2017 |
Accessible Version :
View
(401 KB)
|
| Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. | 12/04/2017 |
Accessible Version :
View
(413 KB)
|
| Procurement and Stringing of 132 kV Roorkee-Laksar line by replacing existing Wolf/Panther conductor with ACCC (HTLS) Casablanca conductor. | 06/04/2017 |
Accessible Version :
View
(130 KB)
|
| Capital Investment for the investment on the works covered under centrally funded Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) of Ministry of Power (MoP), Govt. of India (GoI). | 06/04/2017 |
Accessible Version :
View
(146 KB)
|
| Applicability of Rate Schedule RTS-4A: Agriculture Allied Activities on the connection no. 557 issued to M/s Flex Foods Limited at their Mushroom Farm at Chidderwala, Dehradun. | 29/03/2017 |
Accessible Version :
View
(333 KB)
|
| Installation of 18 kWp capacity Grid Connected Rooftop Solar Power Plant at Uttarakhand Electricity Regulatory Commission (UERC) building, Dehradun sanctioned by M/s PFC Ltd. | 23/03/2017 |
Accessible Version :
View
(116 KB)
|
| Petition seeking determination of project specific tariff for 10.5 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 | 16/03/2017 |
Accessible Version :
View
(574 KB)
|
| Petition seeking approval of the Commission on the Power Purchase Agreement proposed to be executed between Uttarakhand Power Corporation Ltd. and M/s K. Ramachandra Rao | 10/03/2017 |
Accessible Version :
View
(396 KB)
|
| Application seeking approval for the investment on the following projects: Construction of 9 Nos. 33/11 kV S/s and their associated lines of 109.40 km | 08/03/2017 |
Accessible Version :
View
(236 KB)
|
| Approval of 09 nos. projects under Capital Investments under Para 11 of the Transmission Licence involving various works of System Improvement. | 01/03/2017 |
Accessible Version :
View
(108 KB)
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited & M/s Beta Infratech Pvt. Ltd. | 17/02/2017 |
Accessible Version :
View
(257 KB)
|
| Petition under Section 62 and Section 86 (1) (a) of the Electricity Act, 2003, read with the UERC (Terms and Conditions for Determination of Tariff) Regulations, 2011 (in short, UERC MYT Regulations | 10/02/2017 |
Accessible Version :
View
(271 KB)
|
| Augmentation of 132 kV S/s Bindal from 2×40 MVA to 3×40 MVA by procurement, installation & commissioning of 132/33 kV, 40 MVA Transformer at 132 kV S/s Bindal, Dehradun. | 10/02/2017 |
Accessible Version :
View
(82 KB)
|
| Approval of 09 nos. projects under Capital Investments under Para 11 of the Transmission Licence involving various works of System Improvement. | 07/02/2017 |
Accessible Version :
View
(105 KB)
|
| Investment Approval for Shifting of 132 kV lines in Dev Sanskriti Vishvavidyalaya Campus for Shri Vedmata Gayatri Trust, Shantikunj, Haridwar. | 06/02/2017 |
Accessible Version :
View
(92 KB)
|
| Petition seeking determination of provisional tariff in anticipation of completion of Tanga Small Hydropower Project (5MW) of Himalaya Hydro Pvt. Ltd., as per Regulation 13, sub-clause (2) | 06/02/2017 |
Accessible Version :
View
(301 KB)
|
| Petition filed for amendment of Clause No. 9 relating to “Billing and Payment”, Clause No. 1.1.32 relating to “Due Date” and Clause No. 9.4 relating to “Payment Security Mechanism” | 25/01/2017 |
Accessible Version :
View
(417 KB)
|
| Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Uttar Bharat Hydro Power Private Limited | 16/01/2017 |
Accessible Version :
View
(411 KB)
|
| In the matter of: Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Khutani Power Company Private Limited. | 16/01/2017 |
Accessible Version :
View
(394 KB)
|
| In the matter of: Petition filed by UPCL to review/reconsider the personal penalty imposed vide Order dated 05th October, 2016 issued by the Commission in the matter of suo-moto proceedings | 12/01/2017 |
Accessible Version :
View
(358 KB)
|
| Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005. | 11/01/2017 |
Accessible Version :
View
(150 KB)
|
| Representation/Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL to an individual consumer |
Accessible Version :
View
(99 KB)
|
|
| Non-Compliance of Commission’s directions in the matter of Energy loss report of furnace feeders in the State. |
Accessible Version :
View
(208 KB)
|
|
| Applications filed by Renewable Energy Generators seeking determination of project specific tariff. |
Accessible Version :
View
(237 KB)
|
|
| Clarification on the date of applicability of Tariff as directed vide the Commission’s Order dated April 05, 2013. |
Accessible Version :
View
(121 KB)
|
|
| Determination of Average Pooled Cost of Power Purchase (APPC) for the financial year 2013-14 for fulfilment of requirement specified under UERC |
Accessible Version :
View
(190 KB)
|
|
| Approval in deviation in guidelines for Short term procurement of power by Distribution licensee through tariff based bidding process issued by MoP dated 15.05.2012. |
Accessible Version :
View
(193 KB)
|
|
| Suo-moto proceedings initiated by the Commission for non-compliance by UPCL under UERC (Tariff and Other Terms for Supply of Electricity from non- conventional |
Accessible Version :
View
(164 KB)
|
|
| Application in pursuance to Show-Cause notice no. UERC/6/TF-142/12-13/2013/1720 dated March 12, 2013. |
Accessible Version :
View
(85 KB)
|
|
| Non-compliance of Order dated 05.10.2012 of CGRF (Kumaon Zone) issued on the review petition No. 10/2012 of UPCL in the matter of Sh. Chaan Singh Jeena. |
Accessible Version :
View
(124 KB)
|
|
| Uttarakhand Power Corporation Limited’s proposal seeking approval of the Commission for scheduled load shedding in the State of Uttarakhand |
Accessible Version :
View
(258 KB)
|
|
| Non-compliance of the Commission’s Order dated 10.01.2013 in the matter of violation of Standards of Performance Regulations and Licence Conditions by UPCL |
Accessible Version :
View
(157 KB)
|
|
| Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003] AND in the matter of Application No.772/MD/PTCUL/UERC |
Accessible Version :
View
(197 KB)
|
|
| Application seeking Determination of Tariff for projects specific tariff |
Accessible Version :
View
(83 KB)
|
|
| Non-compliance of Commission’s directions in the matter of Energy loss report of furnace feeders in the State. And Managing Director, Uttarakhand Power Corporation Ltd., Dehradun |
Accessible Version :
View
(218 KB)
|
|
| Petition No. 11 of 2012 Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003] & Application No.43/Director (Project)/PTCUL/UERC |
Accessible Version :
View
(304 KB)
|
|
| Order in the matter of: Suo-moto proceedings initiated by the Commission on the representation of M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Laksar, Haridwar |
Accessible Version :
View
(185 KB)
|
|
| Order in the matter of: Suo-moto proceedings initiated by the Commission on the representation of M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Laksar, Haridwar |
Accessible Version :
View
(185 KB)
|
|
| Non-compliance of Commission’s Regulations and Licence Conditions by Uttarakhand Power Corporation Limited (UPCL) with regard to complaint filed by Superintending Engineer |
Accessible Version :
View
(290 KB)
|
|
| Non-compliance by UPCL (Distribution Licensee) of Commission’s directions with regard to Commercial Performance Monitoring of the licensee including submission |
Accessible Version :
View
(180 KB)
|
|
| Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003] and in the matter of Application No. 582/PTCUL/MD/UERC |
Accessible Version :
View
(204 KB)
|
|
| Order in the matter of Minutes of Meeting dated 24.08.2012 and order dated 01.01.2013 of the Commission on non-compliance of the Commission’s directions issued to UPCL. |
Accessible Version :
View
(242 KB)
|
|
| Order on Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003] |
Accessible Version :
View
(204 KB)
|
|
| Order on non-compliance of Standards of Performance Regulations and Licence Conditions by UPCL |
Accessible Version :
View
(182 KB)
|
|
| Order on petition filed by UPCL for review of Commission’s Order dated 17.12.2012 |
Accessible Version :
View
(455 KB)
|
|
| Order on Review Petition on the Petition filed by UPCL seeking determination of tariff of its Vanala SHP |
Accessible Version :
View
(232 KB)
|
|
| Non-compliance of UERC (State Grid Code) Regulations, 2007 and the Commission’s directions by SLDC |
Accessible Version :
View
(123 KB)
|
|
| Non-compliance of the Commission’s directions by UPCL with regard to MoM dated 24.08.2012 |
Accessible Version :
View
(126 KB)
|