Construction of 132 kV GIS Substation Araghar and LILO of 132 kV Majra-Laltappar at 132 kV S/s Araghar line through laying of 132 kV Cable.
|
|
Accessible Version :
View
(52 KB) /
|
Petition seeking waiver of per day Penalty imposed by the Commission vide order dated January 22, 2014 for non-compliance of directions issued vide Order dated September 11, 2013.
|
|
Accessible Version :
View
(322 KB) /
|
Petition seeking the payment for Deemed Generation of 5 MW Debal Small Hydro Project for the years 2012-13, 2013-14 & 2014-15.
|
|
Accessible Version :
View
(228 KB) /
|
Petition seeking approval of the Business Plan U/s 62 & 86 (1)(a) of the Electricity Act, 2003 read with the Regulation 8 of UERC
|
|
Accessible Version :
View
(237 KB) /
|
Review Petition filed by UPCL on Commission’s Order dated 05.05.2014 on the Application seeking approval of releasing additional 6 MVA load (Total of 20 MVA)
|
|
Accessible Version :
View
(468 KB) /
|
Petition to extent the benchmark capital cost and generic tariff as declared by UERC vide its order dated 23.07.2015, i.e. upto 30 Oct., 2016 for 23 Solar PV Power Plants
|
|
Accessible Version :
View
(227 KB) /
|
Application seeking recovery of claim in respect of Deemed Generation under Section 44 (A) of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional)
|
|
Accessible Version :
View
(271 KB) /
|
Application seeking approval for the Investment on the project covering (i) releasing of 2,500 electricity connections for Private Tube-wells (ii) installation of double metering
|
|
Accessible Version :
View
(76 KB) /
|
Review Petition on the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations
|
|
Accessible Version :
View
(145 KB) /
|
Petition filed by M/s Him Urja Pvt Ltd. under UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010 seeking accreditation and issuance of Renewable Energy Certificates
|
|
Accessible Version :
View
(307 KB) /
|
Sh. S. K Tamta, Chief Engineer (Commercial), UPCL.
|
|
Accessible Version :
View
(91 KB) /
|
Application for seeking review/reconsideration on the Commission’s Order dated 28.02.2014 issued in the matter of approval of Investment in the project
|
|
Accessible Version :
View
(72 KB) /
|
Petition seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Super Hydro Electric Pvt. Ltd.
|
|
Accessible Version :
View
(262 KB) /
|
Petition under provision of the Regulation 68 read with Regulation 74 of UERC (Conduct of Business) Regulations, 2004 to reconsider/review the order dated 22.01.2014 passed by UERC
|
|
Accessible Version :
View
(243 KB) /
|
Application in pursuance to Show-Cause notice no. UERC/6/TF-142/12-13/2013/1720 dated March 12, 2013.
|
|
Accessible Version :
View
(438 KB) /
|
Petition filed by M/s Him Urja (P) Ltd. seeking determination of tariff of Vanala SHP of 15 MW Capacity.
|
|
Accessible Version :
View
(556 KB) /
|
Application filed by M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Haridwar in the matter of misc petition under UERC (Tariff & Other Terms for Supply of Electricity from Renewable Energy Sources
|
|
Accessible Version :
View
(289 KB) /
|
Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Regency Gangani Energy Pvt. Ltd.
|
|
Accessible Version :
View
(300 KB) /
|
Petition under Section 86(1)(f) of the Electricity Act,2003, for adjudication of dispute between M/s PTC India Ltd., Swasti Power Engineering Ltd., Uttarakhand Power Corporation Ltd.
|
|
Accessible Version :
View
(185 KB) /
|
Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Super Hydro Electric Pvt. Ltd.
|
|
Accessible Version :
View
(154 KB) /
|
Dispute between M/s Bhilangana Hydro Power Limited and Power Transmission Corporation of Uttarakhand Limited regarding illegal and incorrect bills for monthly transmission charges
|
|
Accessible Version :
View
(132 KB) /
|
Application filed by M/s Swasti Power Engineering Ltd. for condonation of delay in filing of the Petition for determination of Project Specific Tariff in respect of Bhilangana 22.5 MW HEP
|
|
Accessible Version :
View
(346 KB) /
|
1) Notice under section 142 read with section 146 of the Electricity Act, 2003 and in the matter of Non-compliance of Commission’s Directions issued vide Order dated 01.02.2013.
|
|
Accessible Version :
View
(57 KB) /
|
Application seeking relaxation of the provisions of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations
|
|
Accessible Version :
View
(162 KB) /
|
Non-Compliance by Obligated Entities under UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations, 2010 and UERC
|
|
Accessible Version :
View
(353 KB) /
|
Notice under Section 142 of the Electricity Act, 2003 in the matter of Non-compliance of the Commission’s Directions with regard to the electricity theft caught by departmental Vigilance
|
|
Accessible Version :
View
(132 KB) /
|
Non-compliance of Commission’s directions with regard to Commercial Performance Monitoring of the licensee including submission of monthly periodical reports in the prescribed formats by UPCL
|
|
Accessible Version :
View
(138 KB) /
|
Notice under Section 142 of the Electricity Act, 2003 in the matter of Non-compliance of Commission’s Directions
|
|
Accessible Version :
View
(127 KB) /
|
Application seeking approval for investment on the project for implementing Integrated Automatic Meter Reading (IAMR) System.
|
|
Accessible Version :
View
(130 KB) /
|
Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence [Licence No. 1 of 2003]
|
|
Accessible Version :
View
(119 KB) /
|
Non-compliance of Commission’s Order dated 02.04.2013 in the matter of delay in release of new connections to BSNL
|
|
Accessible Version :
View
(131 KB) /
|
Non-compliance of UERC (The Electricity Supply Code) Regulations, 2007 with regard to ‘Additional Security Deposit’.
|
|
Accessible Version :
View
(158 KB) /
|
Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources
|
|
Accessible Version :
View
(201 KB) /
|
Representation of M/s Bhilangana Hydro Power Ltd. seeking clarification in the matter of impact on accreditation of its 24 MW Bhilangana-III HEP
|
|
Accessible Version :
View
(208 KB) /
|
Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.
|
|
Accessible Version :
View
(223 KB) /
|
Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of Section 59 of the Electricity Act, 2003 read with Regulation 5 of UERC (Standard of Performance) Regulations, 2007.
|
|
Accessible Version :
View
(200 KB) /
|
Application filed by UPCL for approval of procurement of 200 MW (+/- 20%) power on Medium term basis with respect to Guidelines for Determination of Tariff by Bidding Process
|
|
Accessible Version :
View
(127 KB) /
|
Petition for seeking approval for implementation of Domestic Efficient Lighting Program (DELP) for LED bulbs in the state of Uttarakhand under 24 X 7 Power for All.
|
|
Accessible Version :
View
(121 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & M/s GMR Chhattisgarh Energy Ltd.
|
|
Accessible Version :
View
(420 KB) /
|
Petition filed for adjudication and appropriate direction under Section 86 (1) (f), 94(2) of the Electricity Act, 2003 read with Regulation 20 & 21 of the UERC (Conduct of Business) Regulations,
|
|
Accessible Version :
View
(184 KB) /
|
Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rules, 2006 on the Order dated 02.05.2015 issued by the District Magistrate, Udhamsingh Nagar (Uttarakhand)
|
|
Accessible Version :
View
(424 KB) /
|
Application seeking approval of the Commission on the PPAs between UPCL and 12 nos. Generators
|
|
Accessible Version :
View
(469 KB) /
|
Petition seeking the approval of the Commission for advance banking of power by the UPCL from Haryana Power Purchase Centre/Northern Region Utility, through a trader.
|
|
Accessible Version :
View
(393 KB) /
|
Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for investment
|
|
Accessible Version :
View
(145 KB) /
|
Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of the disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corp. Ltd.
|
|
Accessible Version :
View
(641 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) for the quarter ending June, 2015 and to adjust the same in the FCA computation for the quarter ending September, 2015.
|
|
Accessible Version :
View
(378 KB) /
|
Grid connectivity for 12.6 MW SHP of M/s Uttar Bharat Hydro Power Pvt. Ltd. (UBHP), A-2/452, Sector-8, Rohini, New Delhi (suo-moto)
|
|
Accessible Version :
View
(179 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & Grid Interactive Rooftop & Small Solar PV Plant under Third Party Model.
|
|
Accessible Version :
View
(462 KB) /
|
Petition filed under Section 86(1) (k) of Electricity Act read with UERC(Terms and Conditions of Intra-State Open Access)Regulations, 2015
|
|
Accessible Version :
View
(92 KB) /
|
Filing of Petition for allowing presentation and acceptance of the Petition for Review of the UERC’s “Order on True-up of FY 2013-14, Annual Performance Review for FY 2014-15
|
|
Accessible Version :
View
(53 KB) /
|
Petition to increase the Solar Renewable Purchase Obligation (SRPO) as stipulated by Uttarakhand Electricity Regulatory Commission.
|
|
Accessible Version :
View
(264 KB) /
|
Application seeking approval of UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. & M/s Sravanthi Energy Pvt. Ltd.
|
|
Accessible Version :
View
(310 KB) /
|
Petition for prior approval of “Capital Investment for Renovation & Modernization” of MB-I (3×30 MW) HEP of UJVN Ltd.
|
|
Accessible Version :
View
(310 KB) /
|
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2015-16
|
|
Accessible Version :
View
(603 KB) /
|
Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence
|
|
Accessible Version :
View
(131 KB) /
|
Suo-Moto proceedings on non-compliance of Renewable Purchase Obligation (RPO) by UPCL in accordance with UERC (Compliance of Renewable Purchase Obligation) Regulations,
|
|
Accessible Version :
View
(234 KB) /
|
Investment Approval for Projects covering the construction of 16 Nos. 33/11 kV substation and their associated lines of 131.34 Km.
|
|
Accessible Version :
View
(70 KB) /
|
Petition for determination of levelised tariff for Rooftop and Small Solar PV Power Plant as per the revised subsidy.
|
|
Accessible Version :
View
(224 KB) /
|
Petition seeking approval of the Commission on return of banked power by UPCL to Haryana Power Purchase Centre through a trader.
|
|
Accessible Version :
View
(397 KB) /
|
Petition seeking determination of project specific tariff for 10.5 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of UERC
|
|
Accessible Version :
View
(407 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers during the period from 01.04.2015 to 30.06.2015.
|
|
Accessible Version :
View
(480 KB) /
|
Petition for approval of “Capital Investment for Renovation & Modernization” of Khatima (3×13.8 MW) HEP of UJVN Ltd.
|
|
Accessible Version :
View
(156 KB) /
|
Misc App. No. 07 of 2015 and Misc Application No. 10 to 13 of 2015 filed by Power Transmission Corporation of Uttarakhand Limited (PTCUL).
|
|
Accessible Version :
View
(111 KB) /
|
Dispute between UJVN Ltd. and Uttarakhand Power Corporation Limited (UPCL) relating to payments.
|
|
Accessible Version :
View
(87 KB) /
|
Application seeking approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd.
|
|
Accessible Version :
View
(495 KB) /
|
Petition for prior approval of “Capital Investment for Renovation & Modernization” of Kulhal (3×10 MW) HEP of UJVN Ltd.
|
|
Accessible Version :
View
(136 KB) /
|
Indemnification of the Petitioner for the loss caused due to delay in commissioning of Transmission/evacuation system and the breach of the provisions of the Transmission Services Agreement by PTCUL.
|
|
Accessible Version :
View
(122 KB) /
|
Revision against the Order dated 27.09.2014 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand), under Rule 3 Sub-Rule 2 of The Work of Licensee Rules, 2006
|
|
Accessible Version :
View
(77 KB) /
|
Petition seeking approval for the investment on the project covering the construction of 14 Nos., 33/11 kV sub-station and their associated lines of 113.70 Km.
|
|
Accessible Version :
View
(166 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers during the period from 01.01.2015 to 31.03.2015.
|
|
Accessible Version :
View
(812 KB) /
|
Petition under Regulation 40(1) read with Regulation 59 & 62 of Conduct of Business Regulation, 2014 for seeking post-facto approval regarding Investment on the project
|
|
Accessible Version :
View
(181 KB) /
|
Investment Approval (Change in scope) for Construction of (2×50 MVA) 220/33 kV substation at Piran Kaliyar
|
|
Accessible Version :
View
(112 KB) /
|
Petitions seeking approval of the Power Purchase Agreements executed by Uttarakhand Power Corporation Ltd with 3 nos. small hydro generators.
|
|
Accessible Version :
View
(191 KB) /
|
Petition seeking approval for the investment on the SCADA /DMS Project of Dehradun town covered under Part-‘A’ of Restructured-Accelerated Power Development
|
|
Accessible Version :
View
(334 KB) /
|
Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. & Investment Approval (Change in scope) for Construction of 2×20 MVA 132 kV GIS substation
|
|
Accessible Version :
View
(142 KB) /
|
Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003].
|
|
Accessible Version :
View
(141 KB) /
|
Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Gamma Infraprop (P) Ltd.
|
|
Accessible Version :
View
(239 KB) /
|
Proceeding initiated in the Commission’s Order dated 08.07.2014 under section 142 of the Electricity Act, 2003 for non-compliance of the provisions of the section 67 & 68 of the Electricity Act
|
|
Accessible Version :
View
(138 KB) /
|
Processing of Tender for purchase of Renewable Energy Power for the period from December 2014 to March 2015.
|
|
Accessible Version :
View
(362 KB) /
|
Petition under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC
|
|
Accessible Version :
View
(243 KB) /
|
Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Selected bidders for setting of Grid Connected Solar PV Power Projects.
|
|
Accessible Version :
View
(225 KB) /
|
Uttarakhand Electricity Regulatory Commission has issued UERC (Fees and Fines) (Second Amendment) Regulations, 2018 effective from 01.04.2018.
|
|
Accessible Version :
View
(167 KB) /
|
Petition seeking approval of Power Purchase Agreement dated 05.02.2003 and Supplementary Power Purchase Agreement dated 07.12.2009 between Himalaya Hydro Pvt. Ltd.
|
|
Accessible Version :
View
(230 KB) /
|
Clarification Petition under Regulation 59 and 61 r/w Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 and Regulation, 2015 in the matter of Tariff Order dated 30.11.2016
|
|
Accessible Version :
View
(228 KB) /
|
Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31stof March 2017 on open access Power Purchased.
|
|
Accessible Version :
View
(66 KB) /
|
Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on open access Power purchased.
|
|
Accessible Version :
View
(64 KB) /
|
Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on open access Power purchased.
|
|
Accessible Version :
View
(64 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Avani Bio Energy Pvt. Ltd.
|
|
Accessible Version :
View
(223 KB) /
|
Petition to extend the benchmark capital cost and generic tariff as declared by the Commission vide its Order dated 16.06.2016 (extended up to 31.09.2017 vide Order dated 16.05.2017)
|
|
Accessible Version :
View
(229 KB) /
|
Application seeking approval of the Commission on the Bulk Power Purchase Agreement between UPCL and UJVN Ltd
|
|
Accessible Version :
View
(239 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement executed between Uttarakhand Power Corporation Ltd.
|
|
Accessible Version :
View
(223 KB) /
|
Investment approval for the investment on the project covering the construction of 01 No. 66/33 kV Substation & 0.60 Km 66 KV line and 02 No. 33/11 kV Substations
|
|
Accessible Version :
View
(49 KB) /
|
Non-compliance of the directions issued in the Tariff Order dated 29.03.2017 for FY 2017-18.
|
|
Accessible Version :
View
(49 KB) /
|
Non-compliance of the directions issued in the Tariff Order dated 29.03.2017 for FY 2017-18.
|
|
Accessible Version :
View
(231 KB) /
|
Non-compliance of the directions issued in the Tariff Order dated 29.03.2017 for FY 2017-18.
|
|
Accessible Version :
View
(231 KB) /
|
Non-compliance of the directions issued in the Tariff Order dated 29.03.2017 for FY 2017-18.
|
|
Accessible Version :
View
(232 KB) /
|
Non-compliance of the directions issued in the Tariff Order dated 29.03.2017 for FY 2017-18.
|
|
Accessible Version :
View
(230 KB) /
|
Petition seeking determination of project specific tariff for Tanga Small Hydro Power Project (5 MW) of Himalaya Hydro Pvt. Ltd. located in Pithoragarh, Uttarakhand
|
|
Accessible Version :
View
(227 KB) /
|
Petition for seeking carry forward of Renewable Purchase Obligation of FY 2016-17 amounting to 787.68 MU (Non-Solar) and 161.32 MU (Solar) as per the provisions of UERC
|
|
Accessible Version :
View
(227 KB) /
|
Petition filed under Regulation 59 and 39 of the UERC (Conduct of Business) Regulations, 2014 and Regulation 55A, 103, 104 & 105 of MYT Regulations, 2015.
|
|
Accessible Version :
View
(230 KB) /
|