    Documents related to government notifications, orders, reports, guidelines and more appear here.

    Filter Document category wise
    All Documents
    Title Date View / Download
    Non-Compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated 11.04.2012 for FY 2012-13.
    Accessible Version : View (266 KB) / 
    Application seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005 AND UPCL.
    Accessible Version : View (52 KB) / 
    Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.
    Accessible Version : View (45 KB) / 
    Petition filed by UJVN Ltd. for review of the Order on Approval of Business Plan and Multi Year Tariff for FY 2013-14 to FY 2015-16.
    Accessible Version : View (49 KB) / 
    Non-Compliance by Obligated Entities under UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations
    Accessible Version : View (62 KB) / 
    Filing of petition for re-determination of Generic Tariff for Pathri Small Hydro Generating Station (3×6.8 MW) & Mohammadpur Small Hydro Generating Station (3×3.1 MW) of UJVN Ltd.
    Accessible Version : View (70 KB) / 
    Petition under Section 86(1)(f) read with Section 142 of the Electricity Act, 2003 for Recovery of deemed generation charges from UPCL for the Financial Year 2012-2013 and Financial Year 2013-2014
    Accessible Version : View (69 KB) / 
    Proceeding initiated in the Commission’s Order dated 08.07.2014 under section 142 of the Electricity Act, 2003 for non-compliance of the provisions of the section 67 & 68 of the Electricity Act
    Accessible Version : View (51 KB) / 
    UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 * PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY
    Accessible Version : View (153 KB) / 
    Petition to wave the token Penalty of Rs. 10,000/- imposed under Section 142 of the Electricity Act, 2003 for non compliance
    Accessible Version : View (44 KB) / 
    Petition with regard to Investment Approval for construction of well foundations and tower protection works at different locations of 220 kV DC Twin Zebra transmission line from 220 kV S/s Dehradun
    Accessible Version : View (46 KB) / 
    Petition seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.
    Accessible Version : View (63 KB) / 
    Petition seeking approval for the Investment on Dehradun Project covering the woks covered under Part-B of R-APDRP of MoP, GoI for reduction of AT&C losses to the extent of 15%.
    Accessible Version : View (62 KB) / 
    Petition seeking approval for Investment on SCADA/DMS Project of Dehradun town covered under Part-A of R-APDRP of MoP GoI.
    Accessible Version : View (60 KB) / 
    Petition for in-principle approval of Capital Expenditure for Balance Capital Works of 4×76 MW MB-II HEP of UJVN Ltd.
    Accessible Version : View (65 KB) / 
    Petition for prior approval of Capital investment for Renovation & Modernization of MB-I (3×30 MW) HEP of UJVN Ltd.
    Accessible Version : View (62 KB) / 
    Show cause notices dated 28.07.2014 issued to Sh. Kamal Kant, Chief Engineer (C&R) & Sh. A.K. Agarwal, Superintending Engineer (Engg.), PTCUL.
    Accessible Version : View (66 KB) / 
    Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015.
    Accessible Version : View (163 KB) / 
    Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. and UPCL in accordance with the provisions of UERC
    Accessible Version : View (174 KB) / 
    Petition for approval of Capital investment for Refurbishing of Asan Barrage of UJVN Ltd. under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations
    Accessible Version : View (47 KB) / 
    Application seeking approval of Hon’ble UERC for the investment on the projects covering the construction of 14 No. 33/11 kV Substation and their associated lines of 113.70 Km.
    Accessible Version : View (41 KB) / 
    Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access
    Accessible Version : View (52 KB) / 
    Notice under section 142 of the Electricity Act, 2003 in the matter of non-compliance of the provisions of Section 67 read with Section 12 of the Indian Electricity Act
    Accessible Version : View (44 KB) / 
    Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rule 2006 on the Order dated 20.05.2014 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand)
    Accessible Version : View (88 KB) / 
    Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015.
    Accessible Version : View (88 KB) / 
    Review petition filed under regulation 68 of the UERC(Conduct of Business Regulations,2004 for review of the order dated April10, 2014 passed by the UERC with respect to determination of tariff
    Accessible Version : View (48 KB) / 
    Petition for clarification on various issues for implementation of “Uttarakhand Grid Interacted Rooftop and Small SPV Power Plants Scheme”.
    Accessible Version : View (47 KB) / 
    Notice issued to MD, UPCL under Section 142 of the Electricity Act, 2003 in the matter of non-compliance of the Commission’s Order dated 24.06.2014 on the Review Petition
    Accessible Version : View (65 KB) / 
    Notice issued to MD, UPCL under Section 43(3) of the Electricity Act, 2003 in the matter of violation of the provisions of section 43(1) of the Electricity Act, 2003
    Accessible Version : View (56 KB) / 
    Petition for seeking carry forward of Renewable Purchase Obligation for FY 2013-14 amounting to 387.68 MU (Non-Solar) and 1.08 MU (Solar) as per the provisions of UERC
    Accessible Version : View (72 KB) / 
    Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View (113 KB) / 
    Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. And UPCL in accordance with the provisions of UERC
    Accessible Version : View (113 KB) / 
    Application seeking post facto approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01-07-2014 to 30-09-2014.
    Accessible Version : View (220 KB) / 
    Petition for seeking carry forward of Renewable Purchase Obligation for FY 2013-14 amounting to 387.68 MU (Non-Solar) and 1.08 MU (Solar) as per the provisions of UERC
    Accessible Version : View (70 KB) / 
    Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View (153 KB) / 
    Application seeking approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Regency Yamuna Energy
    Accessible Version : View (151 KB) / 
    Application under Section 42(2) of the Electricity Act, 2003 read with Regulation 58 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations
    Accessible Version : View (52 KB) / 
    In the matter of: Application seeking approval of the Commission for the investment on the project covering construction of 44.1 km, 33 kV line to connect 7 Nos. 33/11 kV
    Accessible Version : View (64 KB) / 
    In the matter of: Filing of proposal for prior approval of “Capital Investment for Renovation & Modernization of 3 x 10 MW Kulhal HEP” of UJVN Ltd. under Section 61 and 86 of the Electricity Act
    Accessible Version : View (51 KB) / 
    Review Petition on the Commission’s Order dated 05.05.2014 under provisions of the Regulation 68 Regulation 74 of UERC (Conduct of Business) Regulations
    Accessible Version : View (71 KB) / 
    Petition to waive the per day Penalty for non compliance imposed vide order dated 22 January, 2014 passed by the Commission.
    Accessible Version : View (159 KB) / 
    In the matter of: Application seeking approval for the investment on the projects covering (i) Replacement of ACSR conductor by AB cable in theft prone areas.
    Accessible Version : View (71 KB) / 
    Petition seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Super Hydro Electric Pvt. Ltd.
    Accessible Version : View (77 KB) / 
    Application seeking recovery of claim in respect of Deemed Generation under Section 44 (A) of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy
    Accessible Version : View (164 KB) / 
    Petition to waive the per day Penalty for non compliance imposed vide order dated 22 January, 2014 passed by the Commission.
    Accessible Version : View (140 KB) / 
    Dispute between UJVN Ltd. and Uttarakhand Power Corporation Limited (UPCL) relating to payments.
    Accessible Version : View (49 KB) / 
    Review Petition on the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads)
    Accessible Version : View (46 KB) / 
    Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 KV Substation & 0.60 Km 66 KV Line and 02 No. 33/11 KV Substations
    Accessible Version : View (156 KB) / 
    Clarification Petition under Regulation 59 and 61 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 and Regulation 103, 104 and 105 of MYT Regulations
    Accessible Version : View (497 KB) / 
    Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on Open Access Power Purchased.
    Accessible Version : View (102 KB) / 
    Suo-moto proceedings in the matter of application seeking revision of tariff of Mohammadpur and Pathri SHPs of UJVN Ltd. determined by the Commission vide its Order dated 30.11.2016 & 25.05.2017
    Accessible Version : View (413 KB) / 
    Suo-moto proceedings initiated under section 142 of the Electricity Act, 2003 for Non compliance of the Commission’s Directions
    Accessible Version : View (54 KB) / 
    Non-compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated April 11, 2012 for FY 2012-13.
    Accessible Version : View (203 KB) / 
    Petition filed under Regulation 59 and 39 of the UERC (Conduct of Business Regulations), 2014 and Regulation 55A, 103, 104 & 105 of MYT Regulation 2015
    Accessible Version : View (502 KB) / 
    Review Petition against the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of Non-compliance of UERC (Release of New HT & EHT Connections
    Accessible Version : View (44 KB) / 
    Investment Approval of revised DPR of under Construction 220 kV Piran Kaliyar-Puhana (PGCIL) double circuit Line on double circuit Towers.
    Accessible Version : View (126 KB) / 
    Suo-moto proceedings in the matter of non-compliance of Commission’s direction issued vide order dated 16.05.2017 regarding the finalization of Station Heat Rate
    Accessible Version : View (314 KB) / 
    Suo-moto proceedings in the matter of application under Section 62 and 86 of Electricity Act, 2003 seeking modification of the project specific tariff of 10.5 MW Sarju III SHP
    Accessible Version : View (379 KB) / 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2017 to 31.12.2017
    Accessible Version : View (456 KB) / 
    Application seeking approval of the Commission on the bulk Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s UJVN Limited.
    Accessible Version : View (426 KB) / 
    Petition to extend the benchmark capital cost & generic tariff as decided by the Commission vide Order dated 16.06.2016 upto 31.01.2018 for Grid Interactive Rooftop and Small Solar Power Plants.
    Accessible Version : View (340 KB) / 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement executed between Uttarakhand Power Corporation Limited and Uttarakhand Renewable Energy Development Agency.
    Accessible Version : View (399 KB) / 
    Application seeking approval of releasing additional 6 MVA load (Total of 20 MVA) on Supply Voltage of 33 kV to M/s Birla Tyres, Unit-2, Hardwar.
    Accessible Version : View (46 KB) / 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s Avani Bio Energy Pvt. Ltd
    Accessible Version : View (412 KB) / 
    Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View (155 KB) / 
    Non-compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated April 11, 2012 for FY 2012-13.
    Accessible Version : View (157 KB) / 
    Application seeking recovery of claim in respect of Deemed Generation under Section 44 (A) of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventiona
    Accessible Version : View (167 KB) / 
    Applications filed by PTCUL seeking approval of Investments/Capital Expenditures with regard to Construction of (2×50 MVA) 220/33 kV S/s at Piran Kaliar
    Accessible Version : View (71 KB) / 
    Application seeking approval of releasing additional 6 MVA load (Total of 20 MVA) on Supply Voltage of 33 kV to M/s Birla Tyres, Unit-2, Hardwar.
    Accessible Version : View (44 KB) / 
    Approval of Short term power procurement for the month from April 14 to June 14.
    Accessible Version : View (46 KB) / 
    Application filed by M/s Him Urja Pvt. Ltd., New Delhi under UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010 seeking accreditation and issuance of Renewable Energy
    Accessible Version : View (164 KB) / 
    Application filed by M/s Swasti Power Ltd. seeking for condonation of delay in filing of the petition for determination of Project Specific Tariff in respect of 22.5 MW Bhilangana HEP in Uttarakhand
    Accessible Version : View (71 KB) / 
    Suo-Moto proceedings on non-compliance of Renewable Purchase Obligation (RPO) by UPCL in accordance with UERC (Compliance of Renewable Purchase Obligation) Regulations
    Accessible Version : View (67 KB) / 
    Petition for seeking carry forward of Renewable Purchase Obligation of FY 2014-15 amounting to 526.8 MU (Non-Solar) and 2.5 MU (Solar) as per the provisions of UERC
    Accessible Version : View (65 KB) / 
    Petition filed under Regulation 27(2) and 41 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 read with Regulations 59 of UERC (Conduct of Business) Regulations
    Accessible Version : View (73 KB) / 
    Investment Approval for increasing capacity of 220 kV Sub-station Chamba from 2×25 MVA (220/33kV) to 1×50 MVA +1×25 MVA (220/33 kV).
    Accessible Version : View (66 KB) / 
    Petition under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Tariff) Regulations
    Accessible Version : View (324 KB) / 
    Prior approval of ‘Capital Investment for Renovation & Modernization’ of Dhalipur (3×17 MW) HEP of UJVN Ltd.
    Accessible Version : View (68 KB) / 
    Petition for review of the Hon’ble UERC’s order dated 30.07.2015 on “Petition for prior approval of Capital Investment for Renovation & Modernization of 3 x 30 MW MB-I HEP of UJVN Ltd”.
    Accessible Version : View (66 KB) / 
    System strengthening of 132 kV S/s Kichha Comprising
    Accessible Version : View (67 KB) / 
    Investment Approval for Augmentation of Transformer capacity of 132 kV substation Bhupatwala Haridwar from 2×40 MVA to 3×40 MVA by procurement, erection & commissioning
    Accessible Version : View (66 KB) / 
    Investment Approval for Augmentation of 220 kV Substation Jhajhra from 2×40 MVA to 2×80 MVA.
    Accessible Version : View (65 KB) / 
    Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015
    Accessible Version : View (528 KB) / 
    Petition seeking investment approval on the project for implementing Integrated Automatic Meter Reading (IAMR) System on 12000 nos. of consumers to be executed on turnkey basis.
    Accessible Version : View (158 KB) / 
    Petition for seeking carry forward of Renewable Purchase Obligation of FY 2016-17 amounting to 787.68 MU (Non-Solar) and 161.32 MU (Solar) as per the provisions of UERC
    Accessible Version : View (446 KB) / 
    Date of orderIn the Matter of: Condonation for delay in implementation of online issuance of NoC to Open Access Customers
    Accessible Version : View (80 KB) / 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2017 to 30.09.2017
    Accessible Version : View (471 KB) / 
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Pvt. Ltd.
    Accessible Version : View (65 KB) / 
    Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2017-18 and onwards till reviewed
    Accessible Version : View (610 KB) / 
    Petition for review of the Commission’s Order dated 29.03.2017 on True up for FY 2015-16, Annual Performance Review for FY 2016-17 and Annual Revenue Requirement for FY 2017-18.
    Accessible Version : View (2 MB) / 
    Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s RV Akash Ganga Solar Power Ltd.
    Accessible Version : View (371 KB) / 
    Augmentation of 220 kV Substation SIDCUL Haridwar from 2×80 MVA (132/33 kV)+ 1×50 MVA (220/33 kV) to 2×80 MVA (132/33 kV)+1×50 MVA (220/33 kV)+1×25 MVA (220/33 kV)
    Accessible Version : View (72 KB) / 
    Petition for seeking prior approval of “Capital Investment for Renovation & Modernisation” of Dhakrani HEP (3 X 11.25 MW) of UJVN Ltd.
    Accessible Version : View (209 KB) / 
    Petition seeking approval of the Commission for advance banking of power to Punjab State Power Corporation Ltd. under banking arrangement by Uttarakhand Power Corporation Ltd.
    Accessible Version : View (381 KB) / 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.04.2017 to 30.06.2017.
    Accessible Version : View (498 KB) / 
    Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Ltd
    Accessible Version : View (423 KB) / 
    Investment Approval for Increasing capacity of 220 kV Substation Virbhadra Rishikesh from 2×160 MVA (220/132 kV) to 3×160 MVA (132/33 kV).
    Accessible Version : View (65 KB) / 
    Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 30th October
    Accessible Version : View (484 KB) / 
    Petition for Review of the UERC’s Order dated 11.04.2015 on “True-up of FY 2013-14, Annual Performance Review for FY 2014-15 and Annual Fixed Charges for FY 2015-16 for UJVN Ltd”.
    Accessible Version : View (67 KB) / 
    In the Matter of: Misc. Application filed against the shifting of High Tension Line (33 KV) in Prakash Vihar, Haridwar Road, Dehradun under section 67(4) of The Electricity Act, 2003.
    Accessible Version : View (134 KB) /