    Title Date View / Download
    Investment Approval for DPR of “Replacement of old Panther Conductor with HTLS Conductor of 132 kV Majra-Jhajra line” 26/09/2025
    Accessible Version : View (128 KB) 
    Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 03/10/2025
    Accessible Version : View (209 KB) 
    Smt. Akansha Tiwari Sharma W/o Shri Shubham Sharma Rio 22, Mitralok Colony, Block-3, Vs I. The Executive Engineer, E D D (North),. 2. Smt. Sunita Sharma 24/09/2025
    Accessible Version : View (8 MB) 
    Shri Rajendra Prasad Kimothi. New Mandi (Chauras). P.O. Kilkileshwar. Kirti Nagar. Tehri Garhwal. Uttarakhand Vs The Executive Engineer. Electricity Distribution Division. 23/09/2025
    Accessible Version : View (375 KB) 
    Disposed Petitions
    Accessible Version : View (3 MB) 
    Pending Petitions
    Accessible Version : View (526 KB) 
    Overall Petitions data summary
    Accessible Version : View (97 KB) 
    Public notice (Engagement of Individual Consultants)
    Accessible Version : View (161 KB) 
    Annexure-I (Application for the Consultant in UERC)
    Accessible Version : View (115 KB) 
    Terms of Reference (ToR) for Engagement of Consultants for assistance to the Commission
    Accessible Version : View (98 KB) 
    Uttarakhand Electricity Regulatory Commission (Recruitment, Control and Service Conditions of Staff) Regulations, 2016.
    Accessible Version : View (2 MB) 
    Uttarakhand Electricity Regulatory Commission (Salary, Allowance and other conditions of Service of Chairperson and Members) Amendments Rules 2015.
    Accessible Version : View (103 KB) 
    Uttarakhand Electricity Regulatory Commission (Salary, Allowance and other conditions of Service of Chairperson and Members) Rules, 2006.
    Accessible Version : View (1 MB) 
    Terms of Reference (ToR)
    Accessible Version : View (196 KB) 
    Public Notice
    Accessible Version : View (150 KB) 
    M/s Vaibhav Ispat Private Ltd. C-8, UPSIDC Industrial Area Bahadarabad, Haridwar, Uttarakhand Vs The Executive Engineer, Electricity Distribution Division 29/01/2020
    Accessible Version : View (237 KB) 
    Shri Banwari Lal S/o Late Shri Omi Lal, Neal Old Chungi, Haridwar Road Rishikesh, Distt. Dehradun, Uttarakhand Vs The Executive Engineer, Electricity Distribution Division 26/02/2020
    Accessible Version : View (77 KB) 
    Shri Rakesh Sharma, 153, Dharampur, Dehradun, Uttarakhand Vs Shri Gaurav Kumar, S/o Shri Rajesh Kumar, 241/1, Chukkhuwala. Dehradun, Uttarakhand (Respondent No.1) 06/02/2020
    Accessible Version : View (78 KB) 
    Shri Teerathpal, S/o Late Shri Molhad, Village Harjoli Jatt, P.O. Gurukul Narsan, Manglaur, Tehsil Roorkee, Distt. Haridwar, Uttarakhand Vs The Executive Engineer, Electricity Distribution Division 31/01/2020
    Accessible Version : View (88 KB) 
    Shri Jai Prakash Chauhan D-8, Shri Ramnagar, Jwalapur Haridwar, Uttarakhand Vs The Executive Engineer, Electricity Distribution Division 21/01/2020
    Accessible Version : View (106 KB) 
    Shri Suresh Kumar, S/o Shri Mohan Lal Old Ward no. 7 present ward no. 9 Punjabi Colony, Gadarpur Distt. Udham Singh Nagar, Uttarakhand Vs Executive Engineer, Electricity Distribution Division 15/01/2020
    Accessible Version : View (78 KB) 
    Mis K. K. Herbals C-04, Industrial Estate, Mohaan Via Ramnagar, Haldwani, Distt. Nainital, Uttarakhand Vs The Executive Engineer, Electricity Distribution Division, Uttarakhand Power Corporation Ltd. 09/09/2025
    Accessible Version : View (2 MB) 
    Mis Khulbe Garden & Agro Industries C-3, Industrial Estate Mohaan Via Ramnagar, Haldwani, Distt. Nainital, Uttarakhand Vs The Executive Engineer, Electricity Distribution Division, U.P.C.Ltd. 09/09/2025
    Accessible Version : View (2 MB) 
    MIs Gretech Telecom Technology Pvt. Ltd. Khasra No. 122, MI Central Hopetown, Selaqui, Dehradun Uttarakhand Vs The Executive Engineer, Electricity Distribution Division, U.P.C. Ltd. 29/08/2025
    Accessible Version : View (7 MB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (Second Amendment) Regulations, 2018. SoR
    Accessible Version : View (128 KB) 
    Uttarakhand Electricity Regulatory Commission (Green Energy Open Access) Regulations, 2023. Hindi
    Accessible Version : View (128 KB) 
    Petition seeking review of the Tariff Order dated 11.04.2025 on the approval of Business Plan and MYT for fifth Control Period from FY 2025-26 to FY 2027-28 and tariff determination 04/09/2025
    Accessible Version : View (826 KB) 
    Petition seeking removal of certain difficulties/relaxation in Implementation of Tariff Order dated 11.04.2025 passed by the Commission in exercise of its power u/s 64(1) read with Section 61 and 62 03/09/2025
    Accessible Version : View (655 KB) 
    Misc. Application filed by Shri Vikram Singh Chikara, Kuanwala, Near Soap Factory/Generator Factory, Dehradun pertaining to Shifting of Electric Line. 02/09/2025
    Accessible Version : View (58 KB) 
    Uttaranchal Jal Vidyut Nigam Ltd. (UJVNL) had filed applications for
    Accessible Version : View (12 KB) 
    Annexure – 1 PROPOSED LOAD SHEDDING PLAN OF UPCL
    Accessible Version : View (4 MB) 
    UERC(Conduct of Business) Regulations (Removal of Difficulties) (First) Order, 2010. Hindi
    Accessible Version : View (25 KB) 
    Clarification sought by UPCL on levy of 15% Surcharge on Continuous Process Industries vide their letter no. 145/UPCL/COM dated 21.01.2012.
    Accessible Version : View (150 KB) 
    Suo-moto proceedings initiated by the Commission for non-compliance by UPCL under UERC (Tariff and Other Terms for Supply of Electricity from non- conventional
    Accessible Version : View (292 KB) 
    Clarification on the date of applicability of Tariff as directed vide the Commission’s Order dated April 05, 2013.
    Accessible Version : View (121 KB) 
    Suo-moto proceedings initiated by the Commission on the representation of M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Laksar, Haridwar
    Accessible Version : View (185 KB) 
    Determination of Average Pooled Cost of Power Purchase (APPC) for the financial year 2013-14 for fulfilment of requirement specified under UERC (Compliance of Renewable Purchase Obligation).
    Accessible Version : View (190 KB) 
    Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. 23/02/2015
    Accessible Version : View (112 KB) 
    Approval of Capital Investments under Para 11 of the Transmission Licence [Licence No. 1 of 2003 28/04/2015
    Accessible Version : View (111 KB) 
    Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for: (a) Investment Approval for increasing 23/07/2015
    Accessible Version : View (131 KB) 
    Application seeking amendment in UERC (Guidelines for Appointment of Members and Procedures to be followed by the Forum for Redressal
    Accessible Version : View (98 KB) 
    Application seeking approval of the Commission on the Model Power Purchase Agreement between Uttarakhand Power Corporation
    Accessible Version : View (421 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) SoR
    Accessible Version : View (1 MB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Hindi
    Accessible Version : View (91 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) hindi
    Accessible Version : View (279 KB) 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations)
    Accessible Version : View (2 MB) 
    Grid Code
    Accessible Version : View (9 MB) 
    Uttarakhand Electricity Regulatory Commission has issued UERC (Fees and Fines) (Second Amendment) Regulations, 2018
    Accessible Version : View (167 KB) 
    Uttarakhand Electricity Regulatory Commission (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020.
    Accessible Version : View (9 MB) 
    UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (Second Amendment) Regulations, 2021
    Accessible Version : View (113 KB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021, in short, UERC Tariff Regulations, 2021. hindi
    Accessible Version : View (9 MB) 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff)
    Accessible Version : View (9 MB) 
    Approval of Capital Investments under Para 11 of the Transmission Licence involving following works of System Improvement 17/02/2017
    Accessible Version : View (82 KB) 
    Approval of Capital Investments under Para 11 of the Transmission Licence involving 06/04/2017
    Accessible Version : View (130 KB) 
    Review Petition filed by M/s Bhilangana Hydro Power Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 54 of UERC (Conduct of Business) 24/01/2019
    Accessible Version : View (313 KB) 
    Petition seeking permission to set up Solar Power Plant of capacity 50 MW at Village Adhar Mafi, Kujyadi, Dehli in District Almora, Uttarakhand 09/04/2019
    Accessible Version : View (382 KB) 
    Application seeking amendment in UERC Tariff Regulations, 2018. 03/09/2020
    Accessible Version : View (97 KB) 
    Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 11.05.2020, upto March, 2020 05/10/2020
    Accessible Version : View (203 KB) 
    Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2025-26 and onwards till reviewed/ revised 20/08/2025
    Accessible Version : View (295 KB) 
    Compliance of Reports/Plans/Procedures by the Distribution Licensee as per the UERC (Distribution Code) Regulations, 2018. 25/02/2021
    Accessible Version : View (103 KB) 
    Application seeking approval of Uttarakhand Electricity Regulatory Commission (UERC) for investment on the work of construction 17/09/2021
    Accessible Version : View (229 KB) 
    Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage, Asan Barrage, Dakpathar 29/11/2021
    Accessible Version : View (237 KB) 
    Petition under section 79 of the Electricity Act, 2003, read with Article 13 (“Change in Law”) of the Power Purchase Agreement (“PPA”) 14/12/2021
    Accessible Version : View (171 KB) 
    Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending March 20/08/2025
    Accessible Version : View (238 KB) 
    Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance 11/02/2022
    Accessible Version : View (174 KB) 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2022 to 31.03.2022. 09/03/2022
    Accessible Version : View (190 KB) 
    Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL 19/10/2022
    Accessible Version : View (160 KB) 
    Petition for approval of Provisional Tariff for Vyasi Hydro Power Project (2×60 MW) under Section 62 and 86 of the Electricity Act, 2003 09/11/2022
    Accessible Version : View (185 KB) 
    ANNEXURE-1 11/11/2022
    Accessible Version : View (397 KB) 
    Petition seeking amendment in the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021 in compliance of the Electricity (Amendment) Rules, 2022. 09/05/2023
    Accessible Version : View (99 KB) 
    Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL 03/04/2023
    Accessible Version : View (142 KB) 
    Application for recovery of Additional Security Deposits against credit sale of electricity in installments from the consumers. 31/10/2023
    Accessible Version : View (298 KB) 
    Application seeking approval on the Power Usage Agreement signed between UPCL and M/s SJVN Green Energy Limited 31/10/2023
    Accessible Version : View (134 KB) 
    Petition seeking approval of capital investment for Supply Installation Testing & Commissioning (SITC) of Generator Transformer (75 MVA, 11/220 KV) with all accessories including 31/10/2023
    Accessible Version : View (275 KB) 
    Inherent power of the Commission to amend certain provision of the Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) 27/06/2024
    Accessible Version : View (85 KB) 
    Application seeking review of the UERC’s Tariff Order on True-up for FY 2022- 23, Annual Performance Review for FY 2023-24, and Annual Fixed Charges for FY 2024-25. 30/07/2024
    Accessible Version : View (128 KB) 
    Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending March 10/09/2024
    Accessible Version : View (217 KB) 
    Investment Approval for Augmentation of 220 kV substation Jhajra (2×160 MVA to 3×160 MVA T/F at 220/132 kV voltage level and 2×80 MVA to 3×80 MVA at 132/33 kV voltage level). 17/09/2024
    Accessible Version : View (110 KB) 
    Review Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections 18/09/2024
    Accessible Version : View (238 KB) 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s JGN Sugar and Biofuels Pvt. Ltd. 19/09/2024
    Accessible Version : View (163 KB) 
    Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020. 23/09/2024
    Accessible Version : View (205 KB) 
    Application for Determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 to meet the fixed cost of UPCL 30/09/2024
    Accessible Version : View (186 KB) 
    Petition filed under Regulation 9, 20, 58, 59, 61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulations 3.6 and chapter-8 Regulation 1 to 3 of UERC Supply Code Regulation 2020 07/10/2024
    Accessible Version : View (233 KB) 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Arunachal Pradesh Power Corporation Pvt. Ltd. (APPCPL) 08/10/2024
    Accessible Version : View (153 KB) 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. 08/09/2024
    Accessible Version : View (148 KB) 
    Suo-moto proceeding in the matter of tariff of RE Component in addition to the tariff applicable for Rajwakti Small Hydro Plant of M/s Him Urja Pvt. Ltd. 16/10/2024
    Accessible Version : View (152 KB) 
    Petition for fixation of voltage wise distribution loss or reduction of approved distribution loss for open access captive solar power plants under Uttarakhand State Solar Policy-2023. 28/10/2024
    Accessible Version : View (187 KB) 
    Hon’ble APTEL’s Judgement dated 19.07.2024 on Appeal no. 215 of 2016, Appeal No. 283 of 2016 & Appeal No. 139 of 2018 w.r.t. ‘Denial of 50% of the excess IDC and 50% of Price Variation component 20/11/2024
    Accessible Version : View (333 KB) 
    Petition seeking approval of capital investment on Rehabilitation works of civil structure of Ichari Dam under Section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and 21/11/2024
    Accessible Version : View (371 KB) 
    Petition seeking prior approval of the Commission for Advance & Return Energy Banking to M/s Haryana Power Purchase Centre under an Energy Banking Agreement with Uttarakhand Power Corporation Ltd. 22/11/2024
    Accessible Version : View (157 KB) 
    Public Notice (Extension of bids submission date) 23/09/2025
    Accessible Version : View (259 KB) 
    Bid for engagement of Technical Consultants for assistance in Preparation of 05 Nos. Regulations for the State of Uttarakhand Terms of Reference (ToR) 23/09/2025
    Accessible Version : View (196 KB) 
    Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost for the quarter ending June, 2024 09/12/2024
    Accessible Version : View (182 KB) 
    Disposed Petitions 18/08/2025
    Accessible Version : View (1 MB) 
    Pending Petitions 18/08/2025
    Accessible Version : View (262 KB) 
    Overall Petitions data summary 18/08/2025
    Accessible Version : View (76 KB) 
    Petition for grant of relaxation in clause 2.4 (vii) of the Commission Investment Approval Order dated 16.08.2024 in Petition No. 37 of 2024 regarding “Construction of 220/33 kV GIS substation 12/08/2025
    Accessible Version : View (174 KB) 
    Petition seeking review of the Order dated 13th May, 2025 passed by the Commission in the Suo-moto proceedings in the matter of implementation of the Hon’ble APTEL’s Judgement dated 28.08.2024 06/08/2025
    Accessible Version : View (99 KB) 
    Application seeking review of the UERC’s Tariff Order dated 11.04.2025 on Approval of Business Plan and Multi Year Tariff for Fifth Control Period (FY 2025-26 to 2027-28). 05/08/2025
    Accessible Version : View (59 KB) 
    Petition for review of the Commission’s Tariff Order dated 11.04.2025 on the Petitions of the Business Plan and Multi Year Tariff for Fifth Control Period from FY 2025-26 to FY 2027-28 05/08/2025
    Accessible Version : View (96 KB)