Investment Approval for increasing capacity of 220 kV Sub-station Chamba from 2×25 MVA (220/33kV) to 1×50 MVA +1×25 MVA (220/33 kV).
|
|
Accessible Version :
View
(66 KB) /
|
Petition under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Tariff) Regulations
|
|
Accessible Version :
View
(324 KB) /
|
Prior approval of ‘Capital Investment for Renovation & Modernization’ of Dhalipur (3×17 MW) HEP of UJVN Ltd.
|
|
Accessible Version :
View
(68 KB) /
|
Petition for review of the Hon’ble UERC’s order dated 30.07.2015 on “Petition for prior approval of Capital Investment for Renovation & Modernization of 3 x 30 MW MB-I HEP of UJVN Ltd”.
|
|
Accessible Version :
View
(66 KB) /
|
System strengthening of 132 kV S/s Kichha Comprising
|
|
Accessible Version :
View
(67 KB) /
|
Investment Approval for Augmentation of Transformer capacity of 132 kV substation Bhupatwala Haridwar from 2×40 MVA to 3×40 MVA by procurement, erection & commissioning
|
|
Accessible Version :
View
(66 KB) /
|
Investment Approval for Augmentation of 220 kV Substation Jhajhra from 2×40 MVA to 2×80 MVA.
|
|
Accessible Version :
View
(65 KB) /
|
Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015
|
|
Accessible Version :
View
(528 KB) /
|
Petition seeking investment approval on the project for implementing Integrated Automatic Meter Reading (IAMR) System on 12000 nos. of consumers to be executed on turnkey basis.
|
|
Accessible Version :
View
(158 KB) /
|
Petition for seeking carry forward of Renewable Purchase Obligation of FY 2016-17 amounting to 787.68 MU (Non-Solar) and 161.32 MU (Solar) as per the provisions of UERC
|
|
Accessible Version :
View
(446 KB) /
|
Date of orderIn the Matter of: Condonation for delay in implementation of online issuance of NoC to Open Access Customers
|
|
Accessible Version :
View
(80 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2017 to 30.09.2017
|
|
Accessible Version :
View
(471 KB) /
|
Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Pvt. Ltd.
|
|
Accessible Version :
View
(65 KB) /
|
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2017-18 and onwards till reviewed
|
|
Accessible Version :
View
(610 KB) /
|
Petition for review of the Commission’s Order dated 29.03.2017 on True up for FY 2015-16, Annual Performance Review for FY 2016-17 and Annual Revenue Requirement for FY 2017-18.
|
|
Accessible Version :
View
(2 MB) /
|
Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s RV Akash Ganga Solar Power Ltd.
|
|
Accessible Version :
View
(371 KB) /
|
Augmentation of 220 kV Substation SIDCUL Haridwar from 2×80 MVA (132/33 kV)+ 1×50 MVA (220/33 kV) to 2×80 MVA (132/33 kV)+1×50 MVA (220/33 kV)+1×25 MVA (220/33 kV)
|
|
Accessible Version :
View
(72 KB) /
|
Petition for seeking prior approval of “Capital Investment for Renovation & Modernisation” of Dhakrani HEP (3 X 11.25 MW) of UJVN Ltd.
|
|
Accessible Version :
View
(209 KB) /
|
Petition seeking approval of the Commission for advance banking of power to Punjab State Power Corporation Ltd. under banking arrangement by Uttarakhand Power Corporation Ltd.
|
|
Accessible Version :
View
(381 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.04.2017 to 30.06.2017.
|
|
Accessible Version :
View
(498 KB) /
|
Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Ltd
|
|
Accessible Version :
View
(423 KB) /
|
Investment Approval for Increasing capacity of 220 kV Substation Virbhadra Rishikesh from 2×160 MVA (220/132 kV) to 3×160 MVA (132/33 kV).
|
|
Accessible Version :
View
(65 KB) /
|
Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 30th October
|
|
Accessible Version :
View
(484 KB) /
|
Petition for Review of the UERC’s Order dated 11.04.2015 on “True-up of FY 2013-14, Annual Performance Review for FY 2014-15 and Annual Fixed Charges for FY 2015-16 for UJVN Ltd”.
|
|
Accessible Version :
View
(67 KB) /
|
In the Matter of: Misc. Application filed against the shifting of High Tension Line (33 KV) in Prakash Vihar, Haridwar Road, Dehradun under section 67(4) of The Electricity Act, 2003.
|
|
Accessible Version :
View
(134 KB) /
|
Review filed by UJVN Ltd. on Commission’s Order dated 13.03.2015 issued in the matter of prior approval of Capital Investment for Renovation & Modernization of 3×10 MW Kulhal HEP.
|
|
Accessible Version :
View
(66 KB) /
|
Suo-moto proceedings in the matter of Office Memorandum issued by UPCL regarding continuation of Continuous Power Supply Surcharge/Additional Surcharge on Power purchased through open access
|
|
Accessible Version :
View
(151 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2015 to 31.12.2015.
|
|
Accessible Version :
View
(227 KB) /
|
Petition to extend the benchmark capital cost & generic tariff as declared by UERC vide its Order dated 16.06.2016, i.e. upto 31.07.2017 for Grid Interactive Rooftop and Small Solar Power Plants.
|
|
Accessible Version :
View
(305 KB) /
|
Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & M/s Greenko Budhil Hydro Power Pvt. Ltd.
|
|
Accessible Version :
View
(86 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & M/s GMR Chhattisgarh Energy Ltd.
|
|
Accessible Version :
View
(84 KB) /
|
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Mittal Processors Pvt. Ltd. (MPP Ltd.)
|
|
Accessible Version :
View
(195 KB) /
|
Petition seeking the approval of the Commission for advance banking of power by the UPCL from Haryana Power Purchase Centre/Northern Region Utility, through a trader
|
|
Accessible Version :
View
(226 KB) /
|
Petitions filed under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission by UJVN Ltd. for approval of Capital investment
|
|
Accessible Version :
View
(54 KB) /
|
Petition filed under Regulation 27(2) and 41 of the UERC (Terms and Conditions of Intra-state open access) Regulations, 2015 read with Regulation 59 of UERC (Conduct of Business) Regulations
|
|
Accessible Version :
View
(64 KB) /
|
Petition seeking adjustment of Tariff for Motighat SHP (5 MW) due to Additional Capitalization incurred on account of damages due to natural calamity as per UERC Tariff Regulations, 2010.
|
|
Accessible Version :
View
(233 KB) /
|
Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Generators.
|
|
Accessible Version :
View
(231 KB) /
|
Petition under “UERC (RE) Regulations, 2008” for relief against excess rebate deduction from payment of monthly energy bill of M/s RBNS Sugar Mills Ltd., Laksar, Haridwar by UPCL.
|
|
Accessible Version :
View
(77 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) for the quarter ending June, 2015 and to adjust the same in the FCA computation for the quarter ending September, 2015.
|
|
Accessible Version :
View
(226 KB) /
|
Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of the disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corporation Ltd.
|
|
Accessible Version :
View
(56 KB) /
|
Investment approval for strengthening of 132 kV network (A) Extension of 220 kV substation Piran Kaliyar (B) Construction of 132 kV LILO of Bhagwanpur- Chudiyala.
|
|
Accessible Version :
View
(50 KB) /
|
Investment approval for construction of 220 kV Pirankaliyar-Puhana (PGCIL) Line.
|
|
Accessible Version :
View
(48 KB) /
|
Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rule 2006 on the Order dated 02.05.2015 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand)
|
|
Accessible Version :
View
(78 KB) /
|
Compliance of Commission’s orders dated 07.11.2014 and 10.02.2015 in the matter of approval of Power Purchase Agreements between UPCL and Generators.
|
|
Accessible Version :
View
(235 KB) /
|
Application seeking approval of the Commission on the PPAs between UPCL and 08 nos. Generators.
|
|
Accessible Version :
View
(152 KB) /
|
Grid connectivity for 12.6 MW SHP of M/s Uttar Bharat Hydro Power Pvt. Ltd., New Delhi(Suo-moto).
|
|
Accessible Version :
View
(65 KB) /
|
Petition under Section 30, 42(2), 42(3) and 86(1)(c) of the Electricity Act, 2003 read with Regulation 41 of Uttarakhand Electricity Regulatory Commission
|
|
Accessible Version :
View
(53 KB) /
|
Implementation of Retail Tariff Order issued by the Commission on 11.04.2015.
|
|
Accessible Version :
View
(228 KB) /
|
Petition seeking extension of generic tariff prescribed under the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations)
|
|
Accessible Version :
View
(149 KB) /
|
Misc. Petition under “UERC (Tariff & Other Terms for Supply of Electricity from NRE Sources) Regulation 2008” for relief against Excess Rebate deduction from payment of Monthly Energy Bill
|
|
Accessible Version :
View
(236 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01-04-2015 to 30-06-2015.
|
|
Accessible Version :
View
(227 KB) /
|
Determination of project specific tariff for 10.5 MW Small Hydro Power Project on Sarju River at Kapkot, Bageshwar District, Uttarakhand under Sections 62 and 86 of the Electricity Act
|
|
Accessible Version :
View
(228 KB) /
|
Petition under Section 86 (1) (f) of the Electricity Act, 2003, for adjudication of the disputes between M/s Swasti Power Ltd and Uttarakhand Power Corporation Ltd.
|
|
Accessible Version :
View
(227 KB) /
|
Prior approval of “Capital Investment for Renovation & Modernization of 4 x 36 MW Chilla HEP” of UJVN Ltd. under Section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations
|
|
Accessible Version :
View
(65 KB) /
|
Misc. App. No. 02 of 2015 1) Investment Approval for construction of 1. (2×25 MVA), 220/33 kV S/s Barham (Jauljivi) and 2. Construction of LILO line of one circuit 220 kV
|
|
Accessible Version :
View
(72 KB) /
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2015 to 31.03.2015.
|
|
Accessible Version :
View
(228 KB) /
|
Petition under Section 86(1)(F) of the Electricity Act, 2003 for adjudication of the disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corp. Ltd.
|
|
Accessible Version :
View
(83 KB) /
|
Petition seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.
|
|
Accessible Version :
View
(63 KB) /
|
Increasing capacity of 220 kV sub-station SIDCUL, Haridwar from 2×80 MVA (132/33 kV) to 2×80 MVA (132/33 KV) + 1×50 MVA (220/33 KV).
|
|
Accessible Version :
View
(50 KB) /
|
Petition filed by M/s Bhilangana Hydro Power Ltd. for indemnification on account of loss caused due to delay in commissioning of transmission/evacuation system
|
|
Accessible Version :
View
(48 KB) /
|
Dispute between UJVN Ltd. and Uttarakhand Power Corporation Limited (UPCL) relating to payments.
|
|
Accessible Version :
View
(59 KB) /
|
Applications seeking approval of UERC on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and Himalaya Hydro Pvt. Ltd., Regency Yamuna Energy Ltd.
|
|
Accessible Version :
View
(65 KB) /
|
UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023. (Hindi)
|
|
Accessible Version :
View
(8 MB) /
|
Investment approval for Construction of Colony at 132 kV Substation Majra Campus, Dehradun.
|
|
Accessible Version :
View
(46 KB) /
|
Investment approval for procurement and stringing of 132 kV Roorkee-Laksar line by replacing existing wolf/panther conductor with HTLS Conductor.
|
|
Accessible Version :
View
(47 KB) /
|
Investment approval for procurement and stringing of 132 kV Roorkee-Manglore line by replacing existing wolf/panther conductor with HTLS Conductor.
|
|
Accessible Version :
View
(47 KB) /
|
Review Petition filed under Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 28th Oct., 2016 passed by the Commission
|
|
Accessible Version :
View
(231 KB) /
|
Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Uttar Bharat Hydro Power Pvt. Ltd.
|
|
Accessible Version :
View
(223 KB) /
|
Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and Khutani Hydro Power Project.
|
|
Accessible Version :
View
(223 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and M/s Beta Infratech Pvt. Ltd.
|
|
Accessible Version :
View
(238 KB) /
|
In the matter of: Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005. & Show Cause Notice issued by the Commission vide its letter dated 18.04.2016.
|
|
Accessible Version :
View
(225 KB) /
|
Petition to determine the project specific Tariff of Chamoli Extension Mini Hydro Power Project of Capacity of 3 MW on cost plus approach
|
|
Accessible Version :
View
(225 KB) /
|
Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for Investment approval for Augmentation of Transformation capacity from 2×40 MVA
|
|
Accessible Version :
View
(50 KB) /
|
In the Matter of: Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for Investment approval for Augmentation of 132 KV Substation Binda
|
|
Accessible Version :
View
(48 KB) /
|
Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for Investment approval for Shifting of 132 kV lines in Dev Sanskriti Vishvavidyalaya Campus
|
|
Accessible Version :
View
(55 KB) /
|
Petition seeking determination of provisional tariff in anticipation of completion of Tanga Small Hydro Power Project (5 MW) of Himalaya Hydro Pvt. Ltd., as per Regulation 13
|
|
Accessible Version :
View
(233 KB) /
|
1. Distribution Formats
|
|
Accessible Version :
View
(1 MB) /
|
Investment Approval for Construction of Separate Building for SLDC at 132 KV Substation, Majra Campus, Dehradun.
|
|
Accessible Version :
View
(52 KB) /
|
Petition seeking approval of Business Plan for the Control Period starting from FY 2016-17 to FY 2018-19 for 214 MW Gas based Kashipur Combined Cycle Power Plant of Gama Infraprop Private Ltd.
|
|
Accessible Version :
View
(229 KB) /
|
Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024, in short, UERC Tariff Regulations, 2024.(SoR)
|
|
Accessible Version :
View
(372 KB) /
|
Show Cause Notice–cum–Notice for Personal Hearing:- 1. Offence of misleading the electricity consumers of the State
|
|
Accessible Version :
View
(70 KB) /
|
Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence
|
|
Accessible Version :
View
(59 KB) /
|
Petition filed under Regulation 37(1)of the UERC (Conduct of Business Regulations), 2014, clause 3.2 and 14A of the Transmission license read with section 18
|
|
Accessible Version :
View
(79 KB) /
|
Petition on Relaxation in RE Regulations, 2013 in respect to Sarju-II & Sarju-III SHPs of M/s UBHP Ltd. for restriction of any claim under deemed generation
|
|
Accessible Version :
View
(234 KB) /
|
Suo-moto proceedings initiated by the Commission in accordance with the Agreement dated 21.11.1972 between Govt. of Himachal Pradesh and Govt. of Uttar Pradesh.
|
|
Accessible Version :
View
(228 KB) /
|
Application seeking removal of difficulty in implementing the Prepaid Metering system provided in Tariff Order for FY 2016-17 dated 5th April. Daily Order
|
|
Accessible Version :
View
(287 KB) /
|
Application seeking removal of difficulty in implementing the Prepaid Metering system provided in Tariff Order for FY 2016-17 dated 5th April. Petition
|
|
Accessible Version :
View
(552 KB) /
|
Application seeking approval of the Commission on the Model Power Purchase Agreement between Uttarakhand Power Corp. Ltd. & Grid Interactive Rooftop and Small Solar PV Power Plant.
|
|
Accessible Version :
View
(226 KB) /
|
Review petition filed under Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 5th April, 2016 passed by the Commission
|
|
Accessible Version :
View
(227 KB) /
|
Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Applicant
|
|
Accessible Version :
View
(341 KB) /
|
Petition seeking adjustment of tariff of Vanala Small Hydro Project (15 MW) of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation
|
|
Accessible Version :
View
(232 KB) /
|
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd.
|
|
Accessible Version :
View
(225 KB) /
|
Petition to waive the token Penalty of Rs. 10000 imposed on MD, UPCL under section 142 of the Electricity Act, 2003 vide Order dated 09.09.2014 in the matter of non-compliance
|
|
Accessible Version :
View
(332 KB) /
|
Application seeking approval of the Commission for the investment on the project covering the works covered under Part-‘B’ of Restructured-Accelerated Power Development
|
|
Accessible Version :
View
(247 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Sravanthi Energy Pvt. Ltd.
|
|
Accessible Version :
View
(235 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and Sh. Rakesh Kumar.
|
|
Accessible Version :
View
(231 KB) /
|
Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access.
|
|
Accessible Version :
View
(87 KB) /
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Dans Energy Pvt. Ltd
|
|
Accessible Version :
View
(232 KB) /
|
Application under Section 42(2) of the Electricity Act, 2003 read with Regulation 58 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations
|
|
Accessible Version :
View
(160 KB) /
|
Withdrawal of Show-Cause notices dated March 12, 2013 in pursuance to Judgment dated October 01, 2014 of the Hon’ble Appellate Tribunal for Electricity in Appeal Nos
|
|