    Title Date View / Download
    Review filed by UJVN Ltd. on Commission’s Order dated 13.03.2015 issued in the matter of prior approval of Capital Investment for Renovation & Modernization of 3×10 MW Kulhal HEP.
    Accessible Version : View (66 KB) / 
    Suo-moto proceedings in the matter of Office Memorandum issued by UPCL regarding continuation of Continuous Power Supply Surcharge/Additional Surcharge on Power purchased through open access
    Accessible Version : View (151 KB) / 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2015 to 31.12.2015.
    Accessible Version : View (227 KB) / 
    Petition to extend the benchmark capital cost & generic tariff as declared by UERC vide its Order dated 16.06.2016, i.e. upto 31.07.2017 for Grid Interactive Rooftop and Small Solar Power Plants.
    Accessible Version : View (305 KB) / 
    Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & M/s Greenko Budhil Hydro Power Pvt. Ltd.
    Accessible Version : View (86 KB) / 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & M/s GMR Chhattisgarh Energy Ltd.
    Accessible Version : View (84 KB) / 
    Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Mittal Processors Pvt. Ltd. (MPP Ltd.)
    Accessible Version : View (195 KB) / 
    Petition seeking the approval of the Commission for advance banking of power by the UPCL from Haryana Power Purchase Centre/Northern Region Utility, through a trader
    Accessible Version : View (226 KB) / 
    Petitions filed under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission by UJVN Ltd. for approval of Capital investment
    Accessible Version : View (54 KB) / 
    Petition filed under Regulation 27(2) and 41 of the UERC (Terms and Conditions of Intra-state open access) Regulations, 2015 read with Regulation 59 of UERC (Conduct of Business) Regulations
    Accessible Version : View (64 KB) / 
    Petition seeking adjustment of Tariff for Motighat SHP (5 MW) due to Additional Capitalization incurred on account of damages due to natural calamity as per UERC Tariff Regulations, 2010.
    Accessible Version : View (233 KB) / 
    Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Generators.
    Accessible Version : View (231 KB) / 
    Petition under “UERC (RE) Regulations, 2008” for relief against excess rebate deduction from payment of monthly energy bill of M/s RBNS Sugar Mills Ltd., Laksar, Haridwar by UPCL.
    Accessible Version : View (77 KB) / 
    Application seeking approval of the Fuel Charge Adjustment (FCA) for the quarter ending June, 2015 and to adjust the same in the FCA computation for the quarter ending September, 2015.
    Accessible Version : View (226 KB) / 
    Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of the disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corporation Ltd.
    Accessible Version : View (56 KB) / 
    Investment approval for strengthening of 132 kV network (A) Extension of 220 kV substation Piran Kaliyar (B) Construction of 132 kV LILO of Bhagwanpur- Chudiyala.
    Accessible Version : View (50 KB) / 
    Investment approval for construction of 220 kV Pirankaliyar-Puhana (PGCIL) Line.
    Accessible Version : View (48 KB) / 
    Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rule 2006 on the Order dated 02.05.2015 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand)
    Accessible Version : View (78 KB) / 
    Compliance of Commission’s orders dated 07.11.2014 and 10.02.2015 in the matter of approval of Power Purchase Agreements between UPCL and Generators.
    Accessible Version : View (235 KB) / 
    Application seeking approval of the Commission on the PPAs between UPCL and 08 nos. Generators.
    Accessible Version : View (152 KB) / 
    Grid connectivity for 12.6 MW SHP of M/s Uttar Bharat Hydro Power Pvt. Ltd., New Delhi(Suo-moto).
    Accessible Version : View (65 KB) / 
    Petition under Section 30, 42(2), 42(3) and 86(1)(c) of the Electricity Act, 2003 read with Regulation 41 of Uttarakhand Electricity Regulatory Commission
    Accessible Version : View (53 KB) / 
    Implementation of Retail Tariff Order issued by the Commission on 11.04.2015.
    Accessible Version : View (228 KB) / 
    Petition seeking extension of generic tariff prescribed under the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations)
    Accessible Version : View (149 KB) / 
    Misc. Petition under “UERC (Tariff & Other Terms for Supply of Electricity from NRE Sources) Regulation 2008” for relief against Excess Rebate deduction from payment of Monthly Energy Bill
    Accessible Version : View (236 KB) / 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01-04-2015 to 30-06-2015.
    Accessible Version : View (227 KB) / 
    Determination of project specific tariff for 10.5 MW Small Hydro Power Project on Sarju River at Kapkot, Bageshwar District, Uttarakhand under Sections 62 and 86 of the Electricity Act
    Accessible Version : View (228 KB) / 
    Petition under Section 86 (1) (f) of the Electricity Act, 2003, for adjudication of the disputes between M/s Swasti Power Ltd and Uttarakhand Power Corporation Ltd.
    Accessible Version : View (227 KB) / 
    Prior approval of “Capital Investment for Renovation & Modernization of 4 x 36 MW Chilla HEP” of UJVN Ltd. under Section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations
    Accessible Version : View (65 KB) / 
    Misc. App. No. 02 of 2015 1) Investment Approval for construction of 1. (2×25 MVA), 220/33 kV S/s Barham (Jauljivi) and 2. Construction of LILO line of one circuit 220 kV
    Accessible Version : View (72 KB) / 
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2015 to 31.03.2015.
    Accessible Version : View (228 KB) / 
    Petition under Section 86(1)(F) of the Electricity Act, 2003 for adjudication of the disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corp. Ltd.
    Accessible Version : View (83 KB) / 
    Petition seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.
    Accessible Version : View (63 KB) / 
    Increasing capacity of 220 kV sub-station SIDCUL, Haridwar from 2×80 MVA (132/33 kV) to 2×80 MVA (132/33 KV) + 1×50 MVA (220/33 KV).
    Accessible Version : View (50 KB) / 
    Petition filed by M/s Bhilangana Hydro Power Ltd. for indemnification on account of loss caused due to delay in commissioning of transmission/evacuation system
    Accessible Version : View (48 KB) / 
    Dispute between UJVN Ltd. and Uttarakhand Power Corporation Limited (UPCL) relating to payments.
    Accessible Version : View (59 KB) / 
    Applications seeking approval of UERC on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and Himalaya Hydro Pvt. Ltd., Regency Yamuna Energy Ltd.
    Accessible Version : View (65 KB) / 
    UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023. (Hindi)
    Accessible Version : View (8 MB) / 
    Investment approval for Construction of Colony at 132 kV Substation Majra Campus, Dehradun.
    Accessible Version : View (46 KB) / 
    Investment approval for procurement and stringing of 132 kV Roorkee-Laksar line by replacing existing wolf/panther conductor with HTLS Conductor.
    Accessible Version : View (47 KB) / 
    Investment approval for procurement and stringing of 132 kV Roorkee-Manglore line by replacing existing wolf/panther conductor with HTLS Conductor.
    Accessible Version : View (47 KB) / 
    Review Petition filed under Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 28th Oct., 2016 passed by the Commission
    Accessible Version : View (231 KB) / 
    Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Uttar Bharat Hydro Power Pvt. Ltd.
    Accessible Version : View (223 KB) / 
    Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and Khutani Hydro Power Project.
    Accessible Version : View (223 KB) / 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and M/s Beta Infratech Pvt. Ltd.
    Accessible Version : View (238 KB) / 
    In the matter of: Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005. & Show Cause Notice issued by the Commission vide its letter dated 18.04.2016.
    Accessible Version : View (225 KB) / 
    Petition to determine the project specific Tariff of Chamoli Extension Mini Hydro Power Project of Capacity of 3 MW on cost plus approach
    Accessible Version : View (225 KB) / 
    Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for Investment approval for Augmentation of Transformation capacity from 2×40 MVA
    Accessible Version : View (50 KB) / 
    In the Matter of: Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for Investment approval for Augmentation of 132 KV Substation Binda
    Accessible Version : View (48 KB) / 
    Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for Investment approval for Shifting of 132 kV lines in Dev Sanskriti Vishvavidyalaya Campus
    Accessible Version : View (55 KB) / 
    Petition seeking determination of provisional tariff in anticipation of completion of Tanga Small Hydro Power Project (5 MW) of Himalaya Hydro Pvt. Ltd., as per Regulation 13
    Accessible Version : View (233 KB) / 
    1. Distribution Formats
    Accessible Version : View (1 MB) / 
    Investment Approval for Construction of Separate Building for SLDC at 132 KV Substation, Majra Campus, Dehradun.
    Accessible Version : View (52 KB) / 
    Petition seeking approval of Business Plan for the Control Period starting from FY 2016-17 to FY 2018-19 for 214 MW Gas based Kashipur Combined Cycle Power Plant of Gama Infraprop Private Ltd.
    Accessible Version : View (229 KB) / 
    Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024, in short, UERC Tariff Regulations, 2024.(SoR)
    Accessible Version : View (372 KB) / 
    Show Cause Notice–cum–Notice for Personal Hearing:- 1. Offence of misleading the electricity consumers of the State
    Accessible Version : View (70 KB) / 
    Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence
    Accessible Version : View (59 KB) / 
    Petition filed under Regulation 37(1)of the UERC (Conduct of Business Regulations), 2014, clause 3.2 and 14A of the Transmission license read with section 18
    Accessible Version : View (79 KB) / 
    Petition on Relaxation in RE Regulations, 2013 in respect to Sarju-II & Sarju-III SHPs of M/s UBHP Ltd. for restriction of any claim under deemed generation
    Accessible Version : View (234 KB) / 
    Suo-moto proceedings initiated by the Commission in accordance with the Agreement dated 21.11.1972 between Govt. of Himachal Pradesh and Govt. of Uttar Pradesh.
    Accessible Version : View (228 KB) / 
    Application seeking removal of difficulty in implementing the Prepaid Metering system provided in Tariff Order for FY 2016-17 dated 5th April. Daily Order
    Accessible Version : View (287 KB) / 
    Application seeking removal of difficulty in implementing the Prepaid Metering system provided in Tariff Order for FY 2016-17 dated 5th April. Petition
    Accessible Version : View (552 KB) / 
    Application seeking approval of the Commission on the Model Power Purchase Agreement between Uttarakhand Power Corp. Ltd. & Grid Interactive Rooftop and Small Solar PV Power Plant.
    Accessible Version : View (226 KB) / 
    Review petition filed under Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 5th April, 2016 passed by the Commission
    Accessible Version : View (227 KB) / 
    Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Applicant
    Accessible Version : View (341 KB) / 
    Petition seeking adjustment of tariff of Vanala Small Hydro Project (15 MW) of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation
    Accessible Version : View (232 KB) / 
    Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd.
    Accessible Version : View (225 KB) / 
    Petition to waive the token Penalty of Rs. 10000 imposed on MD, UPCL under section 142 of the Electricity Act, 2003 vide Order dated 09.09.2014 in the matter of non-compliance
    Accessible Version : View (332 KB) / 
    Application seeking approval of the Commission for the investment on the project covering the works covered under Part-‘B’ of Restructured-Accelerated Power Development
    Accessible Version : View (247 KB) / 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Sravanthi Energy Pvt. Ltd.
    Accessible Version : View (235 KB) / 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and Sh. Rakesh Kumar.
    Accessible Version : View (231 KB) / 
    Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access.
    Accessible Version : View (87 KB) / 
    Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Dans Energy Pvt. Ltd
    Accessible Version : View (232 KB) / 
    Application under Section 42(2) of the Electricity Act, 2003 read with Regulation 58 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations
    Accessible Version : View (160 KB) / 
    Withdrawal of Show-Cause notices dated March 12, 2013 in pursuance to Judgment dated October 01, 2014 of the Hon’ble Appellate Tribunal for Electricity in Appeal Nos
    Accessible Version : View (235 KB) / 
    Petition seeking amendment in the PPA dated 30.11.2010 executed between M/s Birahi Ganga Hydro Power Ltd. and UPCL in accordance with the provisions of UERC
    Accessible Version : View (401 KB) / 
    Investment approval for Procurement, Erection & Commissioning of 01 No. 40 MVA 132/33 kV Transformer complete with 132 kV & 33 kV Bay for increasing capacity
    Accessible Version : View (66 KB) / 
    Application seeking review of the Tariff Order dated 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for FY 2014-2015.
    Accessible Version : View (414 KB) / 
    In the matter of: Petition for prior approval of “Capital Investment for Renovation & Modernization” of Dhakrani (3×11.25 MW) HEP of UJVN Ltd.
    Accessible Version : View (67 KB) / 
    Petition seeking clarification on various issues for implementation of “Uttarakhand Grid Interactive Rooftop and Small SPV Power Plants Scheme”.
    Accessible Version : View (472 KB) / 
    In the matter of: Investment Approval of Revised DPR for Construction of 132 kV S/C Over head line on Double Circuit Tower from 220 kV S/s SIDCUL Haridwar to 132 kV S/s Jwalapur Haridwar.
    Accessible Version : View (65 KB) / 
    Application seeking approval of Hon’ble UERC for the investment on the projects covering the construction of 22 No. 33/11 kV Substation, 6 No. Feeders for 132/33 kV Substation Simli
    Accessible Version : View (140 KB) / 
    In the matter of: Investment Approval for Balance work of “Diversion of 220 kV Rishikesh-Dharasu and Chamba-Dharasu line in THDC submerged area.”
    Accessible Version : View (64 KB) / 
    Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Tata Power Trading Co. Ltd.
    Accessible Version : View (233 KB) / 
    Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. & Grid Interactive Rooftop & Small Solar PV Plant
    Accessible Version : View (233 KB) / 
    Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Avani Bio Energy Pvt. Ltd.
    Accessible Version : View (236 KB) / 
    Petition for seeking carry forward of Renewable Purchase Obligation for FY 2015-16 amounting to 699.6 MU (Non-Solar) and 8.1 MU (Solar) as per the provisions of UERC
    Accessible Version : View (226 KB) / 
    Petition seeking carry forward of Renewable Purchase Obligation for FY 2012-13 and FY 2013-14 as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.
    Accessible Version : View (254 KB) / 
    Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (4.5 MW Canal Bank Grid
    Accessible Version : View (237 KB) / 
    Petition seeking interference of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View (289 KB) / 
    Petition under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Tariff) Regulations,
    Accessible Version : View (236 KB) / 
    Petition to approve the ‘Date of Commercial Operation’ (CoD) of the damaged/non-functional 8 Small Hydro Power Plants (SHPs) on the date
    Accessible Version : View (234 KB) / 
    Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power Pvt. Ltd. and Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju III Small Hydro Power Project.
    Accessible Version : View (230 KB) / 
    Petition seeking post facto approval of the Fuel Charge Adjustment (FCA) charged from the consumers for the period from 01.07.2014 to 30.09.2014.
    Accessible Version : View (435 KB) / 
    Adjudication of dispute under 86(1)(f) between Uttar Bharat Hydro Power Private Limited and Uttarakhand Power Corporation Limited in respect of 12.6 MW Sarju II Hydro Power Project.
    Accessible Version : View (85 KB) / 
    Petition filed by Uttarakhand Power Corporation Limited seeking review of the Order dated April 10, 2014 passed by the Commission determining the tariff of Vanala SHP having capacity of 15 MW
    Accessible Version : View (349 KB) / 
    Petition seeking approval of the Commission for the investment on the project covering construction of 44.1 Km., 33 kV line to connect 7 Nos. 33/11 kV Substation to 220/33 kV Substation Jhajhara.
    Accessible Version : View (150 KB) / 
    Notice issued to MD, UPCL under Section 142 of the Electricity Act, 2003 in the matter of non-compliance of the Commission’s Order dated 24.06.2014 on the Review Petition filed
    Accessible Version : View (255 KB) / 
    Internal Complaints Committee under Sexual Harassment of Women at Workplace (Prevention, Prohibition and Redressal) Act-2013.
    Accessible Version : View (355 KB) / 
    Notice issued to MD, UPCL under Section 43(3) of the Electricity Act, 2003 for violation of the provisions of Section 43(1) of the Electricity Act, 2003 in pursuance to the Commission’s Order
    Accessible Version : View (159 KB) /