Miscellaneous Orders
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Application seeking approval for investment on the project for implementing Integrated Automatic Meter Reading (IAMR) System. |
Accessible Version :
View(130 KB)
|
|
| Non-compliance of Commission’s Order dated 02.04.2013 in the matter of delay in release of new connections to BSNL |
Accessible Version :
View(131 KB)
|
|
| Non-compliance of UERC (The Electricity Supply Code) Regulations, 2007 with regard to ‘Additional Security Deposit’. |
Accessible Version :
View(158 KB)
|
|
| Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources |
Accessible Version :
View(201 KB)
|
|
| Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008. |
Accessible Version :
View(223 KB)
|
|
| Representation of M/s Bhilangana Hydro Power Ltd. seeking clarification in the matter of impact on accreditation of its 24 MW Bhilangana-III HEP |
Accessible Version :
View(208 KB)
|
|
| Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of Section 59 of the Electricity Act, 2003 read with Regulation 5 of UERC (Standard of Performance) Regulations, 2007. |
Accessible Version :
View(200 KB)
|
|
| Application filed by UPCL for approval of procurement of 200 MW (+/- 20%) power on Medium term basis with respect to Guidelines for Determination of Tariff by Bidding Process |
Accessible Version :
View(127 KB)
|
|
| Petition for seeking approval for implementation of Domestic Efficient Lighting Program (DELP) for LED bulbs in the state of Uttarakhand under 24 X 7 Power for All. |
Accessible Version :
View(121 KB)
|
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & M/s GMR Chhattisgarh Energy Ltd. |
Accessible Version :
View(420 KB)
|
|
| Petition filed for adjudication and appropriate direction under Section 86 (1) (f), 94(2) of the Electricity Act, 2003 read with Regulation 20 & 21 of the UERC (Conduct of Business) Regulations, |
Accessible Version :
View(184 KB)
|
|
| Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rules, 2006 on the Order dated 02.05.2015 issued by the District Magistrate, Udhamsingh Nagar (Uttarakhand) |
Accessible Version :
View(424 KB)
|
|
| Application seeking approval of the Commission on the PPAs between UPCL and 12 nos. Generators |
Accessible Version :
View(469 KB)
|
|
| Petition seeking the approval of the Commission for advance banking of power by the UPCL from Haryana Power Purchase Centre/Northern Region Utility, through a trader. |
Accessible Version :
View(393 KB)
|
|
| Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for investment |
Accessible Version :
View(145 KB)
|
|
| Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of the disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corp. Ltd. |
Accessible Version :
View(641 KB)
|
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) for the quarter ending June, 2015 and to adjust the same in the FCA computation for the quarter ending September, 2015. |
Accessible Version :
View(378 KB)
|
|
| Grid connectivity for 12.6 MW SHP of M/s Uttar Bharat Hydro Power Pvt. Ltd. (UBHP), A-2/452, Sector-8, Rohini, New Delhi (suo-moto) |
Accessible Version :
View(179 KB)
|
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & Grid Interactive Rooftop & Small Solar PV Plant under Third Party Model. |
Accessible Version :
View(462 KB)
|
|
| Petition filed under Section 86(1) (k) of Electricity Act read with UERC(Terms and Conditions of Intra-State Open Access)Regulations, 2015 |
Accessible Version :
View(92 KB)
|
|
| Filing of Petition for allowing presentation and acceptance of the Petition for Review of the UERC’s “Order on True-up of FY 2013-14, Annual Performance Review for FY 2014-15 |
Accessible Version :
View(53 KB)
|
|
| Petition to increase the Solar Renewable Purchase Obligation (SRPO) as stipulated by Uttarakhand Electricity Regulatory Commission. |
Accessible Version :
View(264 KB)
|
|
| Application seeking approval of UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. & M/s Sravanthi Energy Pvt. Ltd. |
Accessible Version :
View(310 KB)
|
|
| Petition for prior approval of “Capital Investment for Renovation & Modernization” of MB-I (3×30 MW) HEP of UJVN Ltd. |
Accessible Version :
View(310 KB)
|
|
| Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2015-16 |
Accessible Version :
View(603 KB)
|
|
| Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence |
Accessible Version :
View(131 KB)
|
|
| Petition seeking approval of the Commission on return of banked power by UPCL to Haryana Power Purchase Centre through a trader. |
Accessible Version :
View(397 KB)
|
|
| Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. & Investment Approval (Change in scope) for Construction of 2×20 MVA 132 kV GIS substation |
Accessible Version :
View(142 KB)
|
|
| Petition seeking determination of project specific tariff for 10.5 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of UERC |
Accessible Version :
View(407 KB)
|
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers during the period from 01.04.2015 to 30.06.2015. |
Accessible Version :
View(480 KB)
|
|
| Dispute between UJVN Ltd. and Uttarakhand Power Corporation Limited (UPCL) relating to payments. |
Accessible Version :
View(87 KB)
|
|
| Petition for approval of “Capital Investment for Renovation & Modernization” of Khatima (3×13.8 MW) HEP of UJVN Ltd. |
Accessible Version :
View(156 KB)
|
|
| Misc App. No. 07 of 2015 and Misc Application No. 10 to 13 of 2015 filed by Power Transmission Corporation of Uttarakhand Limited (PTCUL). |
Accessible Version :
View(111 KB)
|
|
| Application seeking approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. |
Accessible Version :
View(495 KB)
|
|
| Petition for prior approval of “Capital Investment for Renovation & Modernization” of Kulhal (3×10 MW) HEP of UJVN Ltd. |
Accessible Version :
View(136 KB)
|
|
| Indemnification of the Petitioner for the loss caused due to delay in commissioning of Transmission/evacuation system and the breach of the provisions of the Transmission Services Agreement by PTCUL. |
Accessible Version :
View(122 KB)
|
|
| Revision against the Order dated 27.09.2014 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand), under Rule 3 Sub-Rule 2 of The Work of Licensee Rules, 2006 |
Accessible Version :
View(77 KB)
|
|
| Petition seeking approval for the investment on the project covering the construction of 14 Nos., 33/11 kV sub-station and their associated lines of 113.70 Km. |
Accessible Version :
View(166 KB)
|
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers during the period from 01.01.2015 to 31.03.2015. |
Accessible Version :
View(812 KB)
|
|
| Petition under Regulation 40(1) read with Regulation 59 & 62 of Conduct of Business Regulation, 2014 for seeking post-facto approval regarding Investment on the project |
Accessible Version :
View(181 KB)
|
|
| Investment Approval (Change in scope) for Construction of (2×50 MVA) 220/33 kV substation at Piran Kaliyar |
Accessible Version :
View(112 KB)
|
|
| Petitions seeking approval of the Power Purchase Agreements executed by Uttarakhand Power Corporation Ltd with 3 nos. small hydro generators. |
Accessible Version :
View(191 KB)
|
|
| Petition seeking approval for the investment on the SCADA /DMS Project of Dehradun town covered under Part-‘A’ of Restructured-Accelerated Power Development |
Accessible Version :
View(334 KB)
|
|
| Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. |
Accessible Version :
View(141 KB)
|
|
| Proceeding initiated in the Commission’s Order dated 08.07.2014 under section 142 of the Electricity Act, 2003 for non-compliance of the provisions of the section 67 & 68 of the Electricity Act |
Accessible Version :
View(138 KB)
|
|
| Processing of Tender for purchase of Renewable Energy Power for the period from December 2014 to March 2015. |
Accessible Version :
View(362 KB)
|
|
| Targets for Renewable Purchase Obligation of FY 2016-17 & FY 2017-18 in accordance with the UERC Regulations, 2013 |
Accessible Version :
View(329 KB)
|
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Greenko Budhil Hydro Power Pvt. Ltd. |
Accessible Version :
View(491 KB)
|
|
| Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 28th October |
Accessible Version :
View(415 KB)
|
|
| Petition seeking approval on the projects covering construction of 16 Nos. 33/11 kV substation and their associated lines of 131.34 Km. |
Accessible Version :
View(221 KB)
|
|
| Adjudication of dispute under Section 86(1)(f) of the Electricity Act, 2003 between Uttar Bharat Hydro Power Private Limited and Uttarakhand Power Corporation Limited |
Accessible Version :
View(196 KB)
|
|
| Petition under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 |
Accessible Version :
View(1 MB)
|
|
| Petition under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011, UERC |
Accessible Version :
View(330 KB)
|
|
| Petition to determine the project specific tariff of Chamoli extension mini hydro power project of capacity 3 MW on cost plus approach. |
Accessible Version :
View(414 KB)
|
|
| Application seeking to abolish the Minimum Consumption Guarantee (MCG) on electricity connections issued for PTW in the State of Uttarakhand |
Accessible Version :
View(351 KB)
|
|
| Petition seeking removal of difficulty in implementing the Prepaid Metering Scheme provided in Tariff Order for FY 2016-17 dated 5th April, 2016. |
Accessible Version :
View(393 KB)
|
|
| Investment Approval for construction of 2×25 MVA, 220/33 kV S/s Baram (Jauljivi) and construction of LILO line of one Circuit 220 kV Dhauliganga- Pithoragarh (PGCIL) |
Accessible Version :
View(124 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp |
Accessible Version :
View(351 KB)
|
|
| Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power (P) Ltd. and Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju III Small Hydro Power Projec |
Accessible Version :
View(370 KB)
|
|
| Application seeking approval of the Commission on the Power Purchase Agreement between: |
Accessible Version :
View(449 KB)
|
|
| Approval of Capital Investment under Para 11 of the Distribution and Retail Supply License [License No. 2 of 2003] for investment on the Integrated Power Development Scheme Project |
Accessible Version :
View(166 KB)
|
|
| Suo moto proceedings initiated by the Commission against non-compliance by UPCL of the Commission’s Order dated 20.06.2016 for procurement of non-solar RECs equivalent to 7.50% |
Accessible Version :
View(360 KB)
|
|
| Application seeking revision of the Renewable Purchase Obligation of FY 2016-17 & FY 2017-18 as per the provisions of the Uttarakhand Electricity Regulatory Commission |
Accessible Version :
View(230 KB)
|
|
| Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited |
Accessible Version :
View(361 KB)
|
|
| Petition filed under Section 62 and 86(1)(a) of the Electricity Act , 2003, read with the relevant provisions of the Uttarakhand Electricity Regulatory Commission |
Accessible Version :
View(317 KB)
|
|
| Petition to extend the commissioning Date of 23 Solar PV Power Plants (cumulative capacity 181.40 MW) upto 31 January, 2017. |
Accessible Version :
View(277 KB)
|
|
| Petition seeking review of the order of the Commission dated July 8, 2016 in the petition for adjustment of tariff for Vanala SHPs (15 MW) unit of M/s Him Urja Pvt. Ltd. |
Accessible Version :
View(422 KB)
|
|
| Petition for seeking prior approval of “Capital Investment for Renovation & Modernisation” of Dhalipur HEP (3 X 17 MW) of UJVN Ltd. And In the matter of: UJVN Ltd., “UJJWAL” |
Accessible Version :
View(181 KB)
|
|
| Offence of misleading the electricity consumers of the State by publishing wrongful interpretation of the provisions of the UERC(Release of new LT Connections, Enhancement and Reduction of Loads) |
Accessible Version :
View(137 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Manikaran Power Ltd. |
Accessible Version :
View(352 KB)
|
|
| Petition for approval of the ‘Date of Commercial Operation’ (COD) of the damaged/non-functional 8 Small Hydro Power Plants (SHPs) on the date when the SHPs would start operating after renovation |
Accessible Version :
View(418 KB)
|
|
| Petition under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC |
Accessible Version :
View(261 KB)
|
|
| Petition filed under Section 62 and 86(1)(a) of the Electricity Act , 2003, read with the relevant provisions of the Uttarakhand Electricity Regulatory Commission |
Accessible Version :
View(469 KB)
|
|
| Petitions filed by UPCL seeking approval of the Commission on the Power Purchase Agreement entered into between |
Accessible Version :
View(337 KB)
|
|
| Investment Approval for Procurement, Erection & Commissioning of 40 MVA, 132/33 kV Transformer and replacing the defective Transformer at 132 /33 kV Sub-station Roorkee |
Accessible Version :
View(101 KB)
|
|
| Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Sravanthi Energy Pvt. Ltd |
Accessible Version :
View(530 KB)
|
|
| Petition filed under Regulation 27(2) and 41 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 read with Regulations, 59 UERC (Conduct of Business) Regulations |
Accessible Version :
View(134 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and M/s Manikaran Power Ltd. . |
Accessible Version :
View(342 KB)
|
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and Sh. Rakesh Kumar. |
Accessible Version :
View(381 KB)
|
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. |
Accessible Version :
View(359 KB)
|
|
| Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Grid Interactive Rooftop & Small Solar PV Generators under Suryodaya Swarozgar Yozna. |
Accessible Version :
View(404 KB)
|
|
| Petition for review of the Order dated 5th April, 2016 issued by the Commission on approval of Business Plan and determination of Multi Year Tariff for the second Control Period |
Accessible Version :
View(413 KB)
|
|
| Petition seeking adjustment of tariff of Vanala Small Hydro Project (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act |
Accessible Version :
View(333 KB)
|
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Avani Bio Energy Pvt. Ltd. |
Accessible Version :
View(403 KB)
|
|
| Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERCRegulations, 2007/ sub-Regulation 14 of Regulation 5 of UERC |
Accessible Version :
View(84 KB)
|
|
| Petition for seeking approval of the Commission on Tender Document for Short Term Power Procurement. |
Accessible Version :
View(330 KB)
|
|
| Petition seeking carry forward of Renewable Purchase Obligation for FY 2014-15 amounting to 526.8 MU (Non-Solar) and 2.5 MU (Solar). |
Accessible Version :
View(373 KB)
|
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (4.5 MW Canal Bank Grid connected Solar PV Plant). |
Accessible Version :
View(370 KB)
|
|
| Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2016-17 and onwards till reviewed |
Accessible Version :
View(802 KB)
|
|
| Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power (P) Ltd. and Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju III Small Hydro Power Project. |
Accessible Version :
View(364 KB)
|
|
| Suo-Moto proceedings on non-compliance of Renewable Purchase Obligation (RPO) by UPCL in accordance with UERC Regulations, 2010 & UERC Regulations, 2013. |
Accessible Version :
View(259 KB)
|
|
| Application seeking amendment in UERC (Guidelines for Appointment of Members and Procedures to be followed by the Forum for Redressal of Grievances of the Consumers) Regulations. |
Accessible Version :
View(98 KB)
|
|
| Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for investment for Increasing capacity of 220 kV Substation Chamba from 2×25 MVA to 1×50 MVA +1×25 MVA. |
Accessible Version :
View(103 KB)
|
|
| Investment Approval for Implementation of Intra-State ABT Metering Scheme for On-Lining of ABT Meters to be installed at Interface Points for Energy Accounting & Transmission Level Energy Auditing |
Accessible Version :
View(112 KB)
|
|
| Petitions filed under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission by UJVN Ltd. for approval of Capital investment |
Accessible Version :
View(327 KB)
|
|
| Petition to extend the benchmark capital cost and generic tariff as declared by on UERC vide order dated 23-07-2015, i.e. up to 30 Oct, 2016 for 23 Solar PV Power Plants |
Accessible Version :
View(308 KB)
|
|
| Application seeking clarification/elucidation of Order dated 07.01.2016 passed by the Commission directing UREDA to grant accreditation to M/s Him Urja Pvt. Ltd. on their application dated 22.06.2012. |
Accessible Version :
View(420 KB)
|
|
| Review Petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 06.01.2016 passed by the Hon’ble UERC |
Accessible Version :
View(95 KB)
|
|
| Suo-moto proceedings initiated by the Commission for non-establishing the Complaint Handling Procedures in accordance with Clause 23.4 of the Distribution and Retail Supply Licence |
Accessible Version :
View(192 KB)
|
|
| Petition for approval of “Capital Investment for Renovation & Modernization” of 3×66 MW Ramganga HEP of UJVN Ltd. |
Accessible Version :
View(130 KB)
|