Miscellaneous Application filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant
|
20/02/2023 |
Accessible Version :
View(204 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2023 to 31.03.2023.
|
13/02/2023 |
Accessible Version :
View(169 KB)
|
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd
|
13/02/2023 |
Accessible Version :
View(134 KB)
|
Petition for relaxation in balance quantum of Renewable Purchase Obligation of FY 2021-22 not met to the tune of 25.61 MUs (Non-Solar) and 350.49 MUs (Solar) as per the provisions of UERC
|
13/02/2023 |
Accessible Version :
View(256 KB)
|
Petition for prior approval of Additional Capital Works on Unit No. 1 of (3×66 MW) Ramganga HEP of UJVN Ltd. under Section 61 and 86 of the Electricity Act, 2003
|
13/02/2023 |
Accessible Version :
View(278 KB)
|
Review/Reconsideration petition filed by Power Transmission Corporation of Uttarakhand Ltd., seeking review of the order dated 14.10.2022 passed in the matter of Waiver of Supervision
|
06/01/2023 |
Accessible Version :
View(191 KB)
|
Application seeking approval of the investment on the Construction of 33 kV line (Underground and Overhead Lines) in Haridwar and US Nagar District of Uttarakhand.
|
29/11/2022 |
Accessible Version :
View(349 KB)
|
Petition for approval of Provisional Tariff for Vyasi Hydro Power Project (2×60 MW) under Section 62 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines
|
22/11/2022 |
Accessible Version :
View(185 KB)
|
Petition for approval of Draft Amended Metering Communication & Data Acquisition Requirements (MCDAR) for Intra-State Power System of Uttarakhand after incorporating amendments
|
22/11/2022 |
Accessible Version :
View(93 KB)
|
Application seeking approval of the Commission on the draft Power Purchase Agreement for medium term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd
|
22/11/2022 |
Accessible Version :
View(165 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2022 to 31.12.2022.
|
15/11/2022 |
Accessible Version :
View(169 KB)
|
Petition seeking determination of project specific tariff for 1.5 MW (2 X 750 kW) Dunao Small Hydro Power Station under Section 62 and 86 of the Electricity Act, 2003 read with Regulation
|
11/11/2022 |
Accessible Version :
View(497 KB)
|
Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP till 30.11.2022 or commissioning of 400 kV D/c Transmission line,
|
10/11/2022 |
Accessible Version :
View(178 KB)
|
Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s
|
03/11/2022 |
Accessible Version :
View(177 KB)
|
Petition seeking approval of the Commission on Deviation in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost
|
28/10/2022 |
Accessible Version :
View(981 KB)
|
Petition seeking approval for increasing the Continuous Supply Surcharge (CSS) as approved by the Commission in the Tariff Order for FY 2022-23.
|
19/10/2022 |
Accessible Version :
View(847 KB)
|
Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid
|
28/09/2022 |
Accessible Version :
View(76 KB)
|
Revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31.03.2022 for FY 2022-23.
|
27/09/2022 |
Accessible Version :
View(258 KB)
|
Waiver of supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj– Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity
|
27/09/2022 |
Accessible Version :
View(78 KB)
|
Petition for review of the Commission’s Order dated 22.06.2022 on application for approval of draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited
|
19/09/2022 |
Accessible Version :
View(176 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
19/09/2022 |
Accessible Version :
View(160 KB)
|
Waiver of Supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj–Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity
|
14/09/2022 |
Accessible Version :
View(220 KB)
|
Unplanned and irregular load shedding/curtailment of power by Uttarakhand Power Corporation Limited during the period 01st of March 2022 to 30th June 2022 and being continued till date.
|
12/09/2022 |
Accessible Version :
View(135 KB)
|
Petition seeking removal of difficulty in implementation of modified Time of Day metering as provided in clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23.
|
12/09/2022 |
Accessible Version :
View(621 KB)
|
Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Suringad-II Small Hydro Power Plant
|
02/09/2022 |
Accessible Version :
View(233 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2022 to 30.09.2022
|
29/08/2022 |
Accessible Version :
View(163 KB)
|
Petition seeking adjustment of tariff for 5 MW Tanga Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated due to the catastrophic damage caused
|
25/08/2022 |
Accessible Version :
View(87 KB)
|
Petition seeking adjustment of tariff for 5 MW Motighat Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated
|
25/08/2022 |
Accessible Version :
View(87 KB)
|
Petition seeking grant of permission to connect 33 kV dedicated line from 15 MW Captive Solar Power Plant to the stepdown side of 132/33 kV switchyard of Kashi Vishwanath Steels Pvt. Ltd.
|
22/08/2022 |
Accessible Version :
View(170 KB)
|
Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERC (Release of New LT Connections,
|
22/07/2022 |
Accessible Version :
View(177 KB)
|
Non-compliance of Sub-Section 3 of Section 43 of the Electricity Act, 2003 and Regulation 3.3.3 (17) & Regulation 3.3.3 (19) of UERC
|
22/07/2022 |
Accessible Version :
View(133 KB)
|
Work of Construction of 132 kV & 66 kV Bays and installation of 3×20 MVA, 132/66 kV Transformer at 132 kV Substation Simli.
|
20/07/2022 |
Accessible Version :
View(2 MB)
|
In the Matter of: Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC
|
20/07/2022 |
Accessible Version :
View(3 MB)
|
Petition for issuing necessary directions to UPCL to withdraw invoices issued against the Petitioner imposing 25% additional Temporary Supply Tariff
|
27/06/2022 |
Accessible Version :
View(208 KB)
|
Petition for review of the Commission’s Order dated 31.03.2022 on True up for FY 2020-21,Annual Performance Review for FY 2021-22 and Annual Revenue Requirement for FY 2022-23
|
29/05/2022 |
Accessible Version :
View(601 KB)
|
Suo-moto proceedings in the matter of applicability of Rate Schedule RTS-4A, Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017.
|
27/05/2022 |
Accessible Version :
View(276 KB)
|
Petition seeking extension of Control Period of the benchmark capital cost & generic tariff as approved by the Commission vide its order dated 11/05/2020, 30/09/2020 and 05/10/2020 till March 2023
|
22/05/2022 |
Accessible Version :
View(228 KB)
|
Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Kaliganga-II Small Hydro Power Plant (2X2.25 MW).
|
22/05/2022 |
Accessible Version :
View(276 KB)
|
Application seeking approval of the Commission on the draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd.
|
22/05/2022 |
Accessible Version :
View(175 KB)
|
Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from Generating Stations operating in Ravi Basin
|
09/05/2022 |
Accessible Version :
View(241 KB)
|
Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar project of M/s Parihar Constructions.
|
05/05/2022 |
Accessible Version :
View(189 KB)
|
Petition for Approval of consolidated DPR amounting to Rs. 843.724 Crore funded through ADB, assuming 90% grant in loan component for transmission projects under UTSDIP Scheme.
|
26/04/2022 |
Accessible Version :
View(133 KB)
|
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2022-23
|
26/04/2022 |
Accessible Version :
View(811 KB)
|
Filing of Miscellaneous Petition, inter alia amongst other grounds concerning refund of Minimum Demand Charges (MDC)/ Late Payment Surcharge (LPS) charges by illegal disconnection
|
23/03/2022 |
Accessible Version :
View(203 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015
|
22/03/2022 |
Accessible Version :
View(143 KB)
|
Application seeking prior approval of the Commission on the draft short term Power Purchase Agreements between Uttarakhand Power Corporation Limited
|
10/03/2022 |
Accessible Version :
View(158 KB)
|
Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021 pertaining to submission of Periodical Reports
|
10/03/2022 |
Accessible Version :
View(161 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2022 to 31.03.2022.
|
09/03/2022 |
Accessible Version :
View(190 KB)
|
Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity
|
03/03/2022 |
Accessible Version :
View(202 KB)
|
Application seeking approval on the two Draft Power Purchase Agreements proposed to be entered into between UPCL and M/s Sravanthi Energy Pvt. Ltd & M/s Gama Infraprop Pvt. Ltd.
|
03/02/2022 |
Accessible Version :
View(141 KB)
|
Application seeking prior approval of Hon’ble Uttarakhand Electricity Regulatory Commission on the Power Purchase Agreement to be executed between UPCL & UJVN Ltd for Vyasi HEP (120 MW)
|
03/02/2022 |
Accessible Version :
View(211 KB)
|
Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s
|
03/02/2022 |
Accessible Version :
View(174 KB)
|
Application seeking approval on the Power Supply Agreements signed between UPCL and M/s Solar Energy Corporation of India (SECI).
|
03/02/2022 |
Accessible Version :
View(147 KB)
|
Application seeking prior approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s PTC India Ltd. on short term basis.
|
21/01/2022 |
Accessible Version :
View(129 KB)
|
Petition seeking utilisation of 220 kV S/C dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from small hydro projects operating in Ravi Basin
|
17/01/2022 |
Accessible Version :
View(283 KB)
|
Application seeking approval for the investment on the project covering the construction of 03 No. 33/11 kV Substation
|
03/01/2022 |
Accessible Version :
View(186 KB)
|
Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage
|
29/12/2021 |
Accessible Version :
View(230 KB)
|
Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage
|
14/12/2021 |
Accessible Version :
View(295 KB)
|
Petition under Section 142 of the Electricity Act, 2003 against UPCL authorities for nonimplementation and non-compliance of the Order dated 24.11.2020
|
09/12/2021 |
Accessible Version :
View(180 KB)
|
Suo-Moto proceedings in the matter of clarification sought by Akshay Urja Association regarding Performance Ratio which is one of the pre-requisites for declaration
|
09/12/2021 |
Accessible Version :
View(237 KB)
|
Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage
|
29/11/2021 |
Accessible Version :
View(237 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2021 to 31.12.2021.
|
29/11/2021 |
Accessible Version :
View(189 KB)
|
Petition to the Commission for resolution of matter pertaining to Deviation Settlement Mechanism (“DSM”) claim for 214 MW (225 MW ISO) for Phase I of 2×225 MW
|
26/11/2021 |
Accessible Version :
View(408 KB)
|
Petition for review of the Commission’s Order dated 11.06.2021 passed in Petition no. 21 of 2020 under Section 94(f) of the Electricity Act, 2003 read with Section 114 and Order 47
|
12/11/2021 |
Accessible Version :
View(127 KB)
|
Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. in terms of the directions contained in Order of the Commission
|
01/11/2021 |
Accessible Version :
View(167 KB)
|
Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage,
|
12/10/2021 |
Accessible Version :
View(265 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
05/10/2021 |
Accessible Version :
View(145 KB)
|
Hon’ble APTEL’s Judgement dated 02.03.2020 in Appeal No. 18 of 2016.
|
22/09/2021 |
Accessible Version :
View(387 KB)
|
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22
|
21/09/2021 |
Accessible Version :
View(194 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2021 to 30.09.2021.
|
02/09/2021 |
Accessible Version :
View(182 KB)
|
Petition seeking approval of the Commission for advance and return banking of power with M/s GMR Energy Trading Ltd., M/s Arunachal Pradesh Power Corporation Pvt. Ltd
|
11/08/2021 |
Accessible Version :
View(322 KB)
|
Suo-Moto Order on methodology for payment of transmission charges for using dedicated transmission line of M/s Greenko Budhil HEP by Himachal Pradesh State Electricity Board Ltd.
|
30/06/2021 |
Accessible Version :
View(172 KB)
|
Petition under Section 86(1) (c), (f) and (k) read with Section 30, Section 39(2) (c), Section 40(a) and Section 42(1) of Electricity Act, 2003 seeking directions to Respondents
|
30/06/2021 |
Accessible Version :
View(207 KB)
|
Directions issued by the Government of Uttarakhand (GoU) under Section 108 of the Electricity Act, 2003 for Exemption of consumption security charges for release
|
16/06/2021 |
Accessible Version :
View(158 KB)
|
Petition under Section 86 (1) (a), Section 86(1)(f) read with Section 61(d) seeking directions to State Load Despatch Centre of Uttarakhand to consider Scheduled Capacity
|
14/06/2021 |
Accessible Version :
View(358 KB)
|
Petition for issuing necessary directions for fixing the electricity tariffs as per FY 2015-16 for the allocated Solar Power Plants and 40% additional tariff for the Solar PV
|
11/06/2021 |
Accessible Version :
View(187 KB)
|
Approval of Capital Investment under Para 11 of the Transmission Licence for Construction of 10X6 MVA, 220/33 kV GIS Substation Baramwari (Rudrapur) & 220 kV
|
03/06/2021 |
Accessible Version :
View(82 KB)
|
Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. And
|
02/06/2021 |
Accessible Version :
View(174 KB)
|
Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 01.02.2019, 18.09.2019 and 23.06.2020
|
31/03/2021 |
Accessible Version :
View(232 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
23/03/2021 |
Accessible Version :
View(161 KB)
|
Petition for seeking carry forward of estimated surplus of 320.62 MU (Non-Solar) and estimated deficit of 110.28 MU (Solar) Renewable Purchase Obligation of FY 2020-21
|
17/03/2021 |
Accessible Version :
View(231 KB)
|
Petition seeking permanent connectivity for 214 MW (225 MW ISO) Phase II of 2×214 MW (450 MW ISO) Gas Based Combined Cycle Power Plant at Kashipur, Uttarakhand
|
05/03/2021 |
Accessible Version :
View(137 KB)
|
Petition filed under Regulation 59 of Uttarakhand Electricity Regulatory Commission (Conduct of Business) Regulations, 2014 and Regulation 103 & 104 of Uttarakhand Electricity Regulatory Commissio
|
13/01/2021 |
Accessible Version :
View(112 KB)
|
Application seeking approval for the investment on the project covering Construction of 02 Nos. 33/11 kV Sub-Stations along with their associated 33 kV Underground Lines
|
11/01/2021 |
Accessible Version :
View(174 KB)
|
Compliance of Reports/Plans/Procedures by the Distribution Licensee as per the UERC (Distribution Code) Regulations, 2018.
|
02/01/2021 |
Accessible Version :
View(103 KB)
|
Application seeking approval of the Commission for investment on Under grounding of HT & LT Electrical Networks in Haridwar Town under IPDS Program- a flagship program of Ministry of Power
|
08/12/2020 |
Accessible Version :
View(168 KB)
|
Petition seeking determination of Term of Use for Utilisation of 220 kV S/c dedicated Transmission line of M/s Greenko Budhil Hydro Electrical Project for evacuation of power
|
04/12/2020 |
Accessible Version :
View(265 KB)
|
Petition for review of the Tariff Order dated 18.04.2020 with respect to the truing up of Non-Tariff Income for the FY 2018-19.
|
03/12/2020 |
Accessible Version :
View(109 KB)
|
Application seeking Review under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 read with relevant provisions of the Electricity Act, 2003 for review of the Order dated 18.04.2020
|
20/11/2020 |
Accessible Version :
View(250 KB)
|
Petition for review of the Commission’s Order dated 18.04.2020 on True up for FY 2018-19, Annual Performance Review for FY 2019-20 and Annual Revenue Requirement for FY 2020-21.
|
11/11/2020 |
Accessible Version :
View(582 KB)
|
Petition seeking approval on the draft plan to pass on the benefit in electricity tariff to the end consumers of the State.
|
08/11/2020 |
Accessible Version :
View(747 KB)
|
Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL to an individual consumer connected to the electrical network
|
04/11/2020 |
Accessible Version :
View(193 KB)
|
Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur as the land belonging
|
01/11/2020 |
Accessible Version :
View(230 KB)
|
Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees and Rs. 55,080/-
|
01/11/2020 |
Accessible Version :
View(195 KB)
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and Uttarakhand Power Development
|
19/10/2020 |
Accessible Version :
View(189 KB)
|
Application for adjudication of dispute between Beta Infratech Private Limited and Uttarakhand Power Corporation Limited in respect of termination of Power Purchase Agreement
|
07/10/2020 |
Accessible Version :
View(376 KB)
|
Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 11.05.2020, upto March, 2020
|
05/10/2020 |
Accessible Version :
View(149 KB)
|
Extension of the period of applicability of the benchmark capital cost and levellised generic tariff issued by the Commission for Solar Energy based plants vide Suo-moto Order dated 07.06.2019
|
30/09/2020 |
Accessible Version :
View(149 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
22/09/2020 |
Accessible Version :
View(143 KB)
|
Petition seeking increase in ceiling limit of 1 MW applicable to Grid Interactive Rooftop and Small Solar PV Plants to 2 MW under RE Regulations, 2018 for net metering arrangement.
|
17/09/2020 |
Accessible Version :