| Work of Construction of 132 kV & 66 kV Bays and installation of 3×20 MVA, 132/66 kV Transformer at 132 kV Substation Simli. | 20/07/2022 |
Accessible Version :
View(2 MB)
|
| In the Matter of: Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC | 20/07/2022 |
Accessible Version :
View(3 MB)
|
| Petition for issuing necessary directions to UPCL to withdraw invoices issued against the Petitioner imposing 25% additional Temporary Supply Tariff | 27/06/2022 |
Accessible Version :
View(208 KB)
|
| Petition for review of the Commission’s Order dated 31.03.2022 on True up for FY 2020-21,Annual Performance Review for FY 2021-22 and Annual Revenue Requirement for FY 2022-23 | 29/05/2022 |
Accessible Version :
View(601 KB)
|
| Suo-moto proceedings in the matter of applicability of Rate Schedule RTS-4A, Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017. | 27/05/2022 |
Accessible Version :
View(276 KB)
|
| Petition seeking extension of Control Period of the benchmark capital cost & generic tariff as approved by the Commission vide its order dated 11/05/2020, 30/09/2020 and 05/10/2020 till March 2023 | 22/05/2022 |
Accessible Version :
View(228 KB)
|
| Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Kaliganga-II Small Hydro Power Plant (2X2.25 MW). | 22/05/2022 |
Accessible Version :
View(276 KB)
|
| Application seeking approval of the Commission on the draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd. | 22/05/2022 |
Accessible Version :
View(175 KB)
|
| Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from Generating Stations operating in Ravi Basin | 09/05/2022 |
Accessible Version :
View(241 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar project of M/s Parihar Constructions. | 05/05/2022 |
Accessible Version :
View(189 KB)
|
| Petition for Approval of consolidated DPR amounting to Rs. 843.724 Crore funded through ADB, assuming 90% grant in loan component for transmission projects under UTSDIP Scheme. | 26/04/2022 |
Accessible Version :
View(133 KB)
|
| Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2022-23 | 26/04/2022 |
Accessible Version :
View(811 KB)
|
| Filing of Miscellaneous Petition, inter alia amongst other grounds concerning refund of Minimum Demand Charges (MDC)/ Late Payment Surcharge (LPS) charges by illegal disconnection | 23/03/2022 |
Accessible Version :
View(203 KB)
|
| Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 | 22/03/2022 |
Accessible Version :
View(143 KB)
|
| Application seeking prior approval of the Commission on the draft short term Power Purchase Agreements between Uttarakhand Power Corporation Limited | 10/03/2022 |
Accessible Version :
View(158 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021 pertaining to submission of Periodical Reports | 10/03/2022 |
Accessible Version :
View(161 KB)
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2022 to 31.03.2022. | 09/03/2022 |
Accessible Version :
View(190 KB)
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2022 to 31.03.2022. | 09/03/2022 |
Accessible Version :
View(190 KB)
|
| Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity | 03/03/2022 |
Accessible Version :
View(202 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance | 11/02/2022 |
Accessible Version :
View(174 KB)
|
| Application seeking approval on the two Draft Power Purchase Agreements proposed to be entered into between UPCL and M/s Sravanthi Energy Pvt. Ltd & M/s Gama Infraprop Pvt. Ltd. | 03/02/2022 |
Accessible Version :
View(141 KB)
|
| Application seeking prior approval of Hon’ble Uttarakhand Electricity Regulatory Commission on the Power Purchase Agreement to be executed between UPCL & UJVN Ltd for Vyasi HEP (120 MW) | 03/02/2022 |
Accessible Version :
View(211 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s | 03/02/2022 |
Accessible Version :
View(174 KB)
|
| Application seeking approval on the Power Supply Agreements signed between UPCL and M/s Solar Energy Corporation of India (SECI). | 03/02/2022 |
Accessible Version :
View(147 KB)
|
| Application seeking prior approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s PTC India Ltd. on short term basis. | 21/01/2022 |
Accessible Version :
View(129 KB)
|
| Petition seeking utilisation of 220 kV S/C dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from small hydro projects operating in Ravi Basin | 17/01/2022 |
Accessible Version :
View(283 KB)
|
| Application seeking approval for the investment on the project covering the construction of 03 No. 33/11 kV Substation | 03/01/2022 |
Accessible Version :
View(186 KB)
|
| Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage | 29/12/2021 |
Accessible Version :
View(230 KB)
|
| Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage | 14/12/2021 |
Accessible Version :
View(295 KB)
|
| Petition under section 79 of the Electricity Act, 2003, read with Article 13 (“Change in Law”) of the Power Purchase Agreement (“PPA”) | 14/12/2021 |
Accessible Version :
View(171 KB)
|
| Petition under Section 142 of the Electricity Act, 2003 against UPCL authorities for nonimplementation and non-compliance of the Order dated 24.11.2020 | 09/12/2021 |
Accessible Version :
View(180 KB)
|
| Suo-Moto proceedings in the matter of clarification sought by Akshay Urja Association regarding Performance Ratio which is one of the pre-requisites for declaration | 09/12/2021 |
Accessible Version :
View(237 KB)
|
| Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage | 29/11/2021 |
Accessible Version :
View(237 KB)
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2021 to 31.12.2021. | 29/11/2021 |
Accessible Version :
View(189 KB)
|
| Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage, Asan Barrage, Dakpathar | 29/11/2021 |
Accessible Version :
View(237 KB)
|
| Petition to the Commission for resolution of matter pertaining to Deviation Settlement Mechanism (“DSM”) claim for 214 MW (225 MW ISO) for Phase I of 2×225 MW | 26/11/2021 |
Accessible Version :
View(408 KB)
|
| Petition for review of the Commission’s Order dated 11.06.2021 passed in Petition no. 21 of 2020 under Section 94(f) of the Electricity Act, 2003 read with Section 114 and Order 47 | 12/11/2021 |
Accessible Version :
View(127 KB)
|
| Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. in terms of the directions contained in Order of the Commission | 01/11/2021 |
Accessible Version :
View(167 KB)
|
| Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage, | 12/10/2021 |
Accessible Version :
View(265 KB)
|
| Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL | 05/10/2021 |
Accessible Version :
View(145 KB)
|
| Hon’ble APTEL’s Judgement dated 02.03.2020 in Appeal No. 18 of 2016. | 22/09/2021 |
Accessible Version :
View(387 KB)
|
| Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22 | 21/09/2021 |
Accessible Version :
View(194 KB)
|
| Application seeking approval of Uttarakhand Electricity Regulatory Commission (UERC) for investment on the work of construction | 17/09/2021 |
Accessible Version :
View(229 KB)
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2021 to 30.09.2021. | 02/09/2021 |
Accessible Version :
View(182 KB)
|
| Petition seeking approval of the Commission for advance and return banking of power with M/s GMR Energy Trading Ltd., M/s Arunachal Pradesh Power Corporation Pvt. Ltd | 11/08/2021 |
Accessible Version :
View(322 KB)
|
| Suo-Moto Order on methodology for payment of transmission charges for using dedicated transmission line of M/s Greenko Budhil HEP by Himachal Pradesh State Electricity Board Ltd. | 30/06/2021 |
Accessible Version :
View(172 KB)
|
| Petition under Section 86(1) (c), (f) and (k) read with Section 30, Section 39(2) (c), Section 40(a) and Section 42(1) of Electricity Act, 2003 seeking directions to Respondents | 30/06/2021 |
Accessible Version :
View(207 KB)
|
| Directions issued by the Government of Uttarakhand (GoU) under Section 108 of the Electricity Act, 2003 for Exemption of consumption security charges for release | 16/06/2021 |
Accessible Version :
View(158 KB)
|
| Petition under Section 86 (1) (a), Section 86(1)(f) read with Section 61(d) seeking directions to State Load Despatch Centre of Uttarakhand to consider Scheduled Capacity | 14/06/2021 |
Accessible Version :
View(358 KB)
|
| Petition for issuing necessary directions for fixing the electricity tariffs as per FY 2015-16 for the allocated Solar Power Plants and 40% additional tariff for the Solar PV | 11/06/2021 |
Accessible Version :
View(187 KB)
|
| Approval of Capital Investment under Para 11 of the Transmission Licence for Construction of 10X6 MVA, 220/33 kV GIS Substation Baramwari (Rudrapur) & 220 kV | 03/06/2021 |
Accessible Version :
View(82 KB)
|
| Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. And | 02/06/2021 |
Accessible Version :
View(174 KB)
|
| Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 01.02.2019, 18.09.2019 and 23.06.2020 | 31/03/2021 |
Accessible Version :
View(232 KB)
|
| Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL | 23/03/2021 |
Accessible Version :
View(161 KB)
|
| Petition for seeking carry forward of estimated surplus of 320.62 MU (Non-Solar) and estimated deficit of 110.28 MU (Solar) Renewable Purchase Obligation of FY 2020-21 | 17/03/2021 |
Accessible Version :
View(231 KB)
|
| Petition seeking permanent connectivity for 214 MW (225 MW ISO) Phase II of 2×214 MW (450 MW ISO) Gas Based Combined Cycle Power Plant at Kashipur, Uttarakhand | 05/03/2021 |
Accessible Version :
View(137 KB)
|
| Compliance of Reports/Plans/Procedures by the Distribution Licensee as per the UERC (Distribution Code) Regulations, 2018. | 25/02/2021 |
Accessible Version :
View(103 KB)
|
| Petition filed under Regulation 59 of Uttarakhand Electricity Regulatory Commission (Conduct of Business) Regulations, 2014 and Regulation 103 & 104 of Uttarakhand Electricity Regulatory Commissio | 13/01/2021 |
Accessible Version :
View(112 KB)
|
| Application seeking approval for the investment on the project covering Construction of 02 Nos. 33/11 kV Sub-Stations along with their associated 33 kV Underground Lines | 11/01/2021 |
Accessible Version :
View(174 KB)
|
| Compliance of Reports/Plans/Procedures by the Distribution Licensee as per the UERC (Distribution Code) Regulations, 2018. | 02/01/2021 |
Accessible Version :
View(103 KB)
|
| Application seeking approval of the Commission for investment on Under grounding of HT & LT Electrical Networks in Haridwar Town under IPDS Program- a flagship program of Ministry of Power | 08/12/2020 |
Accessible Version :
View(168 KB)
|
| Petition seeking determination of Term of Use for Utilisation of 220 kV S/c dedicated Transmission line of M/s Greenko Budhil Hydro Electrical Project for evacuation of power | 04/12/2020 |
Accessible Version :
View(265 KB)
|
| Petition for review of the Tariff Order dated 18.04.2020 with respect to the truing up of Non-Tariff Income for the FY 2018-19. | 03/12/2020 |
Accessible Version :
View(109 KB)
|
| Application seeking Review under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 read with relevant provisions of the Electricity Act, 2003 for review of the Order dated 18.04.2020 | 20/11/2020 |
Accessible Version :
View(250 KB)
|
| Petition for review of the Commission’s Order dated 18.04.2020 on True up for FY 2018-19, Annual Performance Review for FY 2019-20 and Annual Revenue Requirement for FY 2020-21. | 11/11/2020 |
Accessible Version :
View(582 KB)
|
| Petition seeking approval on the draft plan to pass on the benefit in electricity tariff to the end consumers of the State. | 08/11/2020 |
Accessible Version :
View(747 KB)
|
| Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL to an individual consumer connected to the electrical network | 04/11/2020 |
Accessible Version :
View(193 KB)
|
| Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur as the land belonging | 01/11/2020 |
Accessible Version :
View(230 KB)
|
| Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees and Rs. 55,080/- | 01/11/2020 |
Accessible Version :
View(195 KB)
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and Uttarakhand Power Development | 19/10/2020 |
Accessible Version :
View(189 KB)
|
| Application for adjudication of dispute between Beta Infratech Private Limited and Uttarakhand Power Corporation Limited in respect of termination of Power Purchase Agreement | 07/10/2020 |
Accessible Version :
View(376 KB)
|
| Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 11.05.2020, upto March, 2020 | 05/10/2020 |
Accessible Version :
View(149 KB)
|
| Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 11.05.2020, upto March, 2020 | 05/10/2020 |
Accessible Version :
View(203 KB)
|
| Extension of the period of applicability of the benchmark capital cost and levellised generic tariff issued by the Commission for Solar Energy based plants vide Suo-moto Order dated 07.06.2019 | 30/09/2020 |
Accessible Version :
View(149 KB)
|
| Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL | 22/09/2020 |
Accessible Version :
View(143 KB)
|
| Petition seeking increase in ceiling limit of 1 MW applicable to Grid Interactive Rooftop and Small Solar PV Plants to 2 MW under RE Regulations, 2018 for net metering arrangement. | 17/09/2020 |
Accessible Version :
View(163 KB)
|
| Suo-moto Order on the request of UPCL for determination of Tariff considering subsidy at the rate of 80% for the Solar Projects installed/to be installed under PM-Kusum Yojana | 15/09/2020 |
Accessible Version :
View(253 KB)
|
| Petition for seeking investment approval on the project for covering the construction of 02 nos. 33/11 kV Substations & their associated 24.30 Kms. 33 kV Line. | 15/09/2020 |
Accessible Version :
View(178 KB)
|
| Application seeking amendment in UERC Tariff Regulations, 2018. | 03/09/2020 |
Accessible Version :
View(97 KB)
|
| Application seeking prior approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Bhilangana Hydro Power Ltd. | 29/07/2020 |
Accessible Version :
View(190 KB)
|
| Petition seeking approval of the Commission for advance and return banking of power with M/s Arunachal Pradesh Power Corporation Pvt. Ltd., M/s PTC India Ltd., M/s Kreate Energy | 20/07/2020 |
Accessible Version :
View(247 KB)
|
| Time extension in scheduled commissioning date of Solar PV Plants to be developed by various developers in the State of Uttarakhand considering disruption due to lockdown | 23/06/2020 |
Accessible Version :
View(191 KB)
|
| Deployment of customised Renewable Purchase Obligation Compliance System (RPOCS) Web Tool in Uttarakhand. | 19/06/2020 |
Accessible Version :
View(122 KB)
|
| Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL | 19/06/2020 |
Accessible Version :
View(138 KB)
|
| Application seeking approval for inclusion of soft drink concentrate in seasonal industries product list. | 09/06/2020 |
Accessible Version :
View(145 KB)
|
| Application seeking approval for investment on the Implementation of Enterprise Resource Planning (ERP) under Integrated Power Development Scheme (IPDS) of Ministry of Power, Govt. of India. | 03/06/2020 |
Accessible Version :
View(206 KB)
|
| Petition for seeking approval of the Commission for the investment on the Implementation of Real Time Data Acquisition System (RTDAS) for SAIFI/SAIDI measurement | 22/05/2020 |
Accessible Version :
View(176 KB)
|
| Extension of the period of applicability of the benchmark capital cost and levellised generic tariff issued by the Commission for Solar Energy based plants vide Suo-moto | 11/05/2020 |
Accessible Version :
View(142 KB)
|
| Petition to extend the settlement of Net Energy from billing period to yearly basis on captive use by Rooftop Solar PV generator under the NOC model | 11/03/2020 |
Accessible Version :
View(185 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. | 11/03/2020 |
Accessible Version :
View(246 KB)
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2020 to 31.03.2020. | 02/03/2020 |
Accessible Version :
View(194 KB)
|
| Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 | 07/01/2020 |
Accessible Version :
View(217 KB)
|
| Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to ‘component A’ that is, regarding to transmission charges for the use. | 02/12/2019 |
Accessible Version :
View(131 KB)
|
| Representation/Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL to an individual consumer connected to the electrical network | 02/12/2019 |
Accessible Version :
View(99 KB)
|
| Selection of Developer(s) for setting of 200 MW Aggregate Capacity Grid Connect Solar PV Power Projects in the Hilly region of Uttarakhand for procurement of power on long term basis by UPCL. | 15/11/2019 |
Accessible Version :
View(330 KB)
|
| Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 signed between Parties for Procurement. | 15/11/2019 |
Accessible Version :
View(377 KB)
|
| Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2019 to 31.12.2019. | 14/11/2019 |
Accessible Version :
View(262 KB)
|
| Petition for review of the Commission’s Order dated 27.02.2019 on True up for FY 2017-18, Annual Performance Review for FY 2018-19 and Annual Revenue Requirement for FY 2019- 20. | 25/10/2019 |
Accessible Version :
View(825 KB)
|
| Petition seeking approval for recovery of power purchase cost incurred in excess of the approved power purchase cost for FY 2018-19. | 25/10/2019 |
Accessible Version :
View(802 KB)
|
| APTEL’s Judgement dated 23.04.2019 in Appeal No. 287 of 2015. | 18/10/2019 |
Accessible Version :
View(409 KB)
|