    In the matter of: Application seeking approval of the Power Purchase Agreement between M/s Himalaya Hydro Pvt. Ltd. and Uttarakhand Power Corporation Ltd. 23/01/2018
    Accessible Version : View(329 KB)
    Hon’ble ATE Judgment dated 14.11.2017 in Appeal No. 285 of 2016 & IA No. 585 of 2016 setting aside the Commission’s Order dated 20.09.2016 and remand back 18/01/2018
    Accessible Version : View(322 KB)
    In the matter of: Show cause Notice-cum-Notice for Personal Hearing issued to MD, UPCL in the matter of Non-compliance of sub-Regulation 14 of Regulation 5 17/01/2018
    Accessible Version : View(107 KB)
    Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC 16/05/2017
    Accessible Version : View(859 KB)
    Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Mittal Processors Pvt. Ltd. 16/05/2017
    Accessible Version : View(195 KB)
    Petition to extend the benchmark capital cost & generic tariff as declared by UERC vide its Order dated 16.06.2016, i.e. upto 31.07.2017 for Grid Interactive Rooftop and Small Solar Power Plants. 16/05/2017
    Accessible Version : View(305 KB)
    Application seeking approval for the investment for improvement of Bill Collection Facilities of UPCL in lieu of the Order dated 01.09.2005 passed by the Commission 15/05/2017
    Accessible Version : View(95 KB)
    Petition to relax or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC 09/05/2017
    Accessible Version : View(183 KB)
    Petition filed under Regulation 37(1) of the UERC(Conduct of Business) Regulations, 2014, Clause 3.2 and 14.A of the Transmission License read with Section 18 03/05/2017
    Accessible Version : View(111 KB)
    Approval for Construction of Separate Building of SLDC at 132 kV Sub-Station Majra Campus, Dehradun. 01/05/2017
    Accessible Version : View(140 KB)
    Petition to review/reconsider the Order dated January 25, 2017 passed by the Commission in the matter of petition filed by M/s GIPL for amendment of Clause No. 9 relating to “Billing and Payment” 17/04/2017
    Accessible Version : View(470 KB)
    Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. 12/04/2017
    Accessible Version : View(413 KB)
    Petition filed under Regulation 9, 20, 58, 59, 61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 49 and 50 of UERC RE Regulation, 2013 12/04/2017
    Accessible Version : View(401 KB)
    Capital Investment for the investment on the works covered under centrally funded Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) of Ministry of Power (MoP), Govt. of India (GoI). 06/04/2017
    Accessible Version : View(146 KB)
    Procurement and Stringing of 132 kV Roorkee-Laksar line by replacing existing Wolf/Panther conductor with ACCC (HTLS) Casablanca conductor. 06/04/2017
    Accessible Version : View(130 KB)
    Applicability of Rate Schedule RTS-4A: Agriculture Allied Activities on the connection no. 557 issued to M/s Flex Foods Limited at their Mushroom Farm at Chidderwala, Dehradun. 29/03/2017
    Accessible Version : View(333 KB)
    Installation of 18 kWp capacity Grid Connected Rooftop Solar Power Plant at Uttarakhand Electricity Regulatory Commission (UERC) building, Dehradun sanctioned by M/s PFC Ltd. 23/03/2017
    Accessible Version : View(116 KB)
    Petition seeking determination of project specific tariff for 10.5 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 16/03/2017
    Accessible Version : View(574 KB)
    Petition seeking approval of the Commission on the Power Purchase Agreement proposed to be executed between Uttarakhand Power Corporation Ltd. and M/s K. Ramachandra Rao 10/03/2017
    Accessible Version : View(396 KB)
    Application seeking approval for the investment on the following projects: Construction of 9 Nos. 33/11 kV S/s and their associated lines of 109.40 km 08/03/2017
    Accessible Version : View(236 KB)
    Approval of 09 nos. projects under Capital Investments under Para 11 of the Transmission Licence involving various works of System Improvement. 01/03/2017
    Accessible Version : View(108 KB)
    Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited & M/s Beta Infratech Pvt. Ltd. 17/02/2017
    Accessible Version : View(257 KB)
    Augmentation of 132 kV S/s Bindal from 2×40 MVA to 3×40 MVA by procurement, installation & commissioning of 132/33 kV, 40 MVA Transformer at 132 kV S/s Bindal, Dehradun. 10/02/2017
    Accessible Version : View(82 KB)
    Petition under Section 62 and Section 86 (1) (a) of the Electricity Act, 2003, read with the UERC (Terms and Conditions for Determination of Tariff) Regulations, 2011 (in short, UERC MYT Regulations 10/02/2017
    Accessible Version : View(271 KB)
    Approval of 09 nos. projects under Capital Investments under Para 11 of the Transmission Licence involving various works of System Improvement. 07/02/2017
    Accessible Version : View(105 KB)
    Petition seeking determination of provisional tariff in anticipation of completion of Tanga Small Hydropower Project (5MW) of Himalaya Hydro Pvt. Ltd., as per Regulation 13, sub-clause (2) 06/02/2017
    Accessible Version : View(301 KB)
    Investment Approval for Shifting of 132 kV lines in Dev Sanskriti Vishvavidyalaya Campus for Shri Vedmata Gayatri Trust, Shantikunj, Haridwar. 06/02/2017
    Accessible Version : View(92 KB)
    Petition filed for amendment of Clause No. 9 relating to “Billing and Payment”, Clause No. 1.1.32 relating to “Due Date” and Clause No. 9.4 relating to “Payment Security Mechanism” 25/01/2017
    Accessible Version : View(417 KB)
    In the matter of: Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Khutani Power Company Private Limited. 16/01/2017
    Accessible Version : View(394 KB)
    Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Uttar Bharat Hydro Power Private Limited 16/01/2017
    Accessible Version : View(411 KB)
    In the matter of: Petition filed by UPCL to review/reconsider the personal penalty imposed vide Order dated 05th October, 2016 issued by the Commission in the matter of suo-moto proceedings 12/01/2017
    Accessible Version : View(358 KB)
    Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005. 11/01/2017
    Accessible Version : View(150 KB)
    Suo moto proceeding for making consistent the time limits specified in clause (17), (18), (20), (21), (22), (24) & (27)(c) of Regulation 7.5 under Regulation 10.3
    Accessible Version : View(178 KB)
    Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 KV Substation & 0.60 Km 66 KV Line and 02 No. 33/11 KV Substations
    Accessible Version : View(156 KB)
    Clarification Petition under Regulation 59 and 61 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 and Regulation 103, 104 and 105 of MYT Regulations
    Accessible Version : View(497 KB)
    Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on Open Access Power Purchased.
    Accessible Version : View(102 KB)
    Petition filed under Regulation 59 and 39 of the UERC (Conduct of Business Regulations), 2014 and Regulation 55A, 103, 104 & 105 of MYT Regulation 2015
    Accessible Version : View(502 KB)
    Suo-moto proceedings in the matter of application seeking revision of tariff of Mohammadpur and Pathri SHPs of UJVN Ltd. determined by the Commission vide its Order dated 30.11.2016 & 25.05.2017
    Accessible Version : View(413 KB)
    Investment Approval of revised DPR of under Construction 220 kV Piran Kaliyar-Puhana (PGCIL) double circuit Line on double circuit Towers.
    Accessible Version : View(126 KB)
    Suo-moto proceedings in the matter of non-compliance of Commission’s direction issued vide order dated 16.05.2017 regarding the finalization of Station Heat Rate
    Accessible Version : View(314 KB)
    Suo-moto proceedings in the matter of application under Section 62 and 86 of Electricity Act, 2003 seeking modification of the project specific tariff of 10.5 MW Sarju III SHP
    Accessible Version : View(379 KB)
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2017 to 31.12.2017
    Accessible Version : View(456 KB)
    Application seeking approval of the Commission on the bulk Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s UJVN Limited.
    Accessible Version : View(426 KB)
    Petition to extend the benchmark capital cost & generic tariff as decided by the Commission vide Order dated 16.06.2016 upto 31.01.2018 for Grid Interactive Rooftop and Small Solar Power Plants.
    Accessible Version : View(340 KB)
    Application seeking approval of the Commission on the Draft Power Purchase Agreement executed between Uttarakhand Power Corporation Limited and Uttarakhand Renewable Energy Development Agency.
    Accessible Version : View(399 KB)
    Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s Avani Bio Energy Pvt. Ltd
    Accessible Version : View(412 KB)
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Pvt. Ltd.
    Accessible Version : View(65 KB)
    Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015
    Accessible Version : View(528 KB)
    Date of orderIn the Matter of: Condonation for delay in implementation of online issuance of NoC to Open Access Customers
    Accessible Version : View(80 KB)
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2017 to 30.09.2017
    Accessible Version : View(471 KB)
    Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2017-18 and onwards till reviewed
    Accessible Version : View(610 KB)
    Petition for review of the Commission’s Order dated 29.03.2017 on True up for FY 2015-16, Annual Performance Review for FY 2016-17 and Annual Revenue Requirement for FY 2017-18.
    Accessible Version : View(2 MB)
    Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s RV Akash Ganga Solar Power Ltd.
    Accessible Version : View(371 KB)
    Augmentation of 220 kV Substation SIDCUL Haridwar from 2×80 MVA (132/33 kV)+ 1×50 MVA (220/33 kV) to 2×80 MVA (132/33 kV)+1×50 MVA (220/33 kV)+1×25 MVA (220/33 kV)
    Accessible Version : View(72 KB)
    Petition for seeking prior approval of “Capital Investment for Renovation & Modernisation” of Dhakrani HEP (3 X 11.25 MW) of UJVN Ltd.
    Accessible Version : View(209 KB)
    Petition seeking approval of the Commission for advance banking of power to Punjab State Power Corporation Ltd. under banking arrangement by Uttarakhand Power Corporation Ltd.
    Accessible Version : View(381 KB)
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.04.2017 to 30.06.2017.
    Accessible Version : View(498 KB)
    Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Ltd
    Accessible Version : View(423 KB)
    Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 30th October
    Accessible Version : View(484 KB)
    Suo-moto proceedings in the matter of Office Memorandum issued by UPCL regarding continuation of Continuous Power Supply Surcharge/Additional Surcharge on Power purchased through open access
    Accessible Version : View(151 KB)
    In the Matter of: Misc. Application filed against the shifting of High Tension Line (33 KV) in Prakash Vihar, Haridwar Road, Dehradun under section 67(4) of The Electricity Act, 2003.
    Accessible Version : View(134 KB)
    Petition to extend the benchmark capital cost & generic tariff as declared by UERC vide its Order dated 16.06.2016, i.e. upto 31.07.2017 for Grid Interactive Rooftop and Small Solar Power Plants.
    Accessible Version : View(305 KB)
    Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Mittal Processors Pvt. Ltd. (MPP Ltd.)
    Accessible Version : View(195 KB)
    Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Applicant
    Accessible Version : View(341 KB)
    Petition to waive the token Penalty of Rs. 10000 imposed on MD, UPCL under section 142 of the Electricity Act, 2003 vide Order dated 09.09.2014 in the matter of non-compliance
    Accessible Version : View(332 KB)
    Application seeking approval of the Commission for the investment on the project covering the works covered under Part-‘B’ of Restructured-Accelerated Power Development
    Accessible Version : View(247 KB)
    Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access.
    Accessible Version : View(87 KB)
    Application under Section 42(2) of the Electricity Act, 2003 read with Regulation 58 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations
    Accessible Version : View(160 KB)
    Withdrawal of Show-Cause notices dated March 12, 2013 in pursuance to Judgment dated October 01, 2014 of the Hon’ble Appellate Tribunal for Electricity in Appeal Nos
    Accessible Version : View(235 KB)
    Petition seeking amendment in the PPA dated 30.11.2010 executed between M/s Birahi Ganga Hydro Power Ltd. and UPCL in accordance with the provisions of UERC
    Accessible Version : View(401 KB)
    Application seeking review of the Tariff Order dated 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for FY 2014-2015.
    Accessible Version : View(414 KB)
    Petition seeking clarification on various issues for implementation of “Uttarakhand Grid Interactive Rooftop and Small SPV Power Plants Scheme”.
    Accessible Version : View(472 KB)
    Application seeking approval of Hon’ble UERC for the investment on the projects covering the construction of 22 No. 33/11 kV Substation, 6 No. Feeders for 132/33 kV Substation Simli
    Accessible Version : View(140 KB)
    Petition seeking carry forward of Renewable Purchase Obligation for FY 2012-13 and FY 2013-14 as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.
    Accessible Version : View(254 KB)
    Petition seeking interference of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View(289 KB)
    Petition seeking post facto approval of the Fuel Charge Adjustment (FCA) charged from the consumers for the period from 01.07.2014 to 30.09.2014.
    Accessible Version : View(435 KB)
    Petition filed by Uttarakhand Power Corporation Limited seeking review of the Order dated April 10, 2014 passed by the Commission determining the tariff of Vanala SHP having capacity of 15 MW
    Accessible Version : View(349 KB)
    Petition seeking approval of the Commission for the investment on the project covering construction of 44.1 Km., 33 kV line to connect 7 Nos. 33/11 kV Substation to 220/33 kV Substation Jhajhara.
    Accessible Version : View(150 KB)
    Notice issued to MD, UPCL under Section 142 of the Electricity Act, 2003 in the matter of non-compliance of the Commission’s Order dated 24.06.2014 on the Review Petition filed
    Accessible Version : View(255 KB)
    Notice issued to MD, UPCL under Section 43(3) of the Electricity Act, 2003 for violation of the provisions of Section 43(1) of the Electricity Act, 2003 in pursuance to the Commission’s Order
    Accessible Version : View(159 KB)
    Petition seeking waiver of per day Penalty imposed by the Commission vide order dated January 22, 2014 for non-compliance of directions issued vide Order dated September 11, 2013.
    Accessible Version : View(322 KB)
    Review Petition filed by UPCL on Commission’s Order dated 05.05.2014 on the Application seeking approval of releasing additional 6 MVA load (Total of 20 MVA)
    Accessible Version : View(468 KB)
    Application seeking recovery of claim in respect of Deemed Generation under Section 44 (A) of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional)
    Accessible Version : View(271 KB)
    Application seeking approval for the Investment on the project covering (i) releasing of 2,500 electricity connections for Private Tube-wells (ii) installation of double metering
    Accessible Version : View(76 KB)
    Review Petition on the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations
    Accessible Version : View(145 KB)
    Petition filed by M/s Him Urja Pvt Ltd. under UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010 seeking accreditation and issuance of Renewable Energy Certificates
    Accessible Version : View(307 KB)
    Application for seeking review/reconsideration on the Commission’s Order dated 28.02.2014 issued in the matter of approval of Investment in the project
    Accessible Version : View(72 KB)
    Sh. S. K Tamta, Chief Engineer (Commercial), UPCL.
    Accessible Version : View(91 KB)
    Petition seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Super Hydro Electric Pvt. Ltd.
    Accessible Version : View(262 KB)
    Petition under provision of the Regulation 68 read with Regulation 74 of UERC (Conduct of Business) Regulations, 2004 to reconsider/review the order dated 22.01.2014 passed by UERC
    Accessible Version : View(243 KB)
    Application in pursuance to Show-Cause notice no. UERC/6/TF-142/12-13/2013/1720 dated March 12, 2013.
    Accessible Version : View(438 KB)
    Petition filed by M/s Him Urja (P) Ltd. seeking determination of tariff of Vanala SHP of 15 MW Capacity.
    Accessible Version : View(556 KB)
    Application filed by M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Haridwar in the matter of misc petition under UERC (Tariff & Other Terms for Supply of Electricity from Renewable Energy Sources
    Accessible Version : View(289 KB)
    Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Regency Gangani Energy Pvt. Ltd.
    Accessible Version : View(300 KB)
    Petition under Section 86(1)(f) of the Electricity Act,2003, for adjudication of dispute between M/s PTC India Ltd., Swasti Power Engineering Ltd., Uttarakhand Power Corporation Ltd.
    Accessible Version : View(185 KB)
    Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Super Hydro Electric Pvt. Ltd.
    Accessible Version : View(154 KB)
    Dispute between M/s Bhilangana Hydro Power Limited and Power Transmission Corporation of Uttarakhand Limited regarding illegal and incorrect bills for monthly transmission charges
    Accessible Version : View(132 KB)
    Application filed by M/s Swasti Power Engineering Ltd. for condonation of delay in filing of the Petition for determination of Project Specific Tariff in respect of Bhilangana 22.5 MW HEP
    Accessible Version : View(346 KB)
    1) Notice under section 142 read with section 146 of the Electricity Act, 2003 and in the matter of Non-compliance of Commission’s Directions issued vide Order dated 01.02.2013.
    Accessible Version : View(57 KB)
    Application seeking relaxation of the provisions of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations
    Accessible Version : View(162 KB)