Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 signed between Parties for Procurement.
|
11/15/19 |
(377 KB)
|
Application seeking relaxation in UERC (The Electricity Supply Code) Regulations 2007 and in UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.
|
08/14/18 |
(165 KB)
|
Selection of Developer(s) for setting of 200 MW Aggregate Capacity Grid Connect Solar PV Power Projects in the Hilly region of Uttarakhand for procurement of power on long term basis by UPCL.
|
11/15/19 |
(330 KB)
|
Review Petition on the Commission’s Order dated 21.03.2018 on “True-Up of FY 2016-17, ARR for FY 2017-18 and AFC for FY 2018-19 for UJVN Ltd.”
|
08/13/18 |
(179 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2019 to 31.12.2019.
|
11/14/19 |
(262 KB)
|
Petition for review of the Commission’s Order dated 21.03.2018 on True up for FY 2016-17, Annual Performance Review for FY 2017-18 and Annual Revenue Requirement for FY 2018-19.
|
08/13/18 |
(700 KB)
|
Petition seeking approval for recovery of power purchase cost incurred in excess of the approved power purchase cost for FY 2018-19.
|
10/25/19 |
(802 KB)
|
Petition seeking approval of the Commission for advance banking of power with M/s PTC India Limited, M/s Mittal Processors (P) Ltd and M/s Arunachal Pradesh Power Corporation Pvt.
|
08/07/18 |
(375 KB)
|
Petition for review of the Commission’s Order dated 27.02.2019 on True up for FY 2017-18, Annual Performance Review for FY 2018-19 and Annual Revenue Requirement for FY 2019- 20.
|
10/25/19 |
(825 KB)
|
APTEL’s Judgement dated 23.04.2019 in Appeal No. 287 of 2015.
|
10/18/19 |
(409 KB)
|
Suo-Moto proceedings initiated by the Commission against non-compliance by UPCL of the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010
|
08/06/18 |
(414 KB)
|
Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st March 2017 on open access power purchased by M/s Kashi Vishwanath Textile Mill (P) Ltd.
|
10/15/19 |
(225 KB)
|
Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited
|
07/23/18 |
(331 KB)
|
Petition seeking carry forward of surplus Renewable Purchase Obligation of 139.00 MU (Non-Solar) in FY 2018-19 as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations.
|
10/09/19 |
(188 KB)
|
Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 07.06.2019, upto October, 2020
|
09/18/19 |
(377 KB)
|
Petition for approval of Tariff rate revision from 70% CFA to Non CFA tariff rates for small solar plants, which already have 25 years PPA with UPCL under the “scheme for development of Grid
|
09/17/19 |
(399 KB)
|
Petition filed under Section 86(1)(f) of the Electricity Act, 2003 read with Article 23 of the PPAs, seeking payment of outstanding dues from Uttarakhand Power Corporation Limited
|
07/12/18 |
(410 KB)
|
Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited
|
06/28/18 |
(331 KB)
|
Petition seeking Review of the order of the Commission dated 10.04.2019 in Petition No. 31 of 2017 seeking determination of project specific Tariff for Tanga Small Hydro Power Project (5 MW) unit.
|
09/17/19 |
(743 KB)
|
Application under Regulation 50 of the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013
|
06/27/18 |
(384 KB)
|
Petition seeking clarification with regard to the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations)
|
06/20/18 |
(410 KB)
|
Application seeking amendment in UERC (The Electricity Supply Code) Regulations, 2007.
|
06/20/18 |
(61 KB)
|
Petition for submission of Draft Metering Communication & Data Acquisition Requirements (MCDAR) for Intra-State Transmission System of Uttarakhand developed in pursuance to Regulation 8.1
|
06/19/18 |
(10 MB)
|
Suo-moto proceedings in the matter of request made by Mr. Digambar Singh Bisht for issuance of appropriate directions for releasing Grant/Subsidy sanctioned
|
06/15/18 |
(342 KB)
|
Suo-moto proceedings in the matter of request made by Mr. Dhirendra Singh Rawat for issuance of appropriate directions to release Grant/Subsidy sanctioned
|
06/15/18 |
(307 KB)
|
Suo-moto proceedings in the matter of applicability of tariff for the purpose of incentive on account of revised O&M norms in UERC (Tariff and Other Terms for Supply
|
05/29/18 |
(596 KB)
|
Approval for the Capital Investment on the Implementation of Phase-II of IT enablement projects under Integrated Power Development Scheme (IPDS), Ministry of Power
|
05/21/18 |
(187 KB)
|
Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003
|
05/17/18 |
(597 KB)
|
Suo-moto proceedings initiated by the Commission on the representation of M/s India Glycols Ltd. regarding illegal demand of Cross Subsidy from Medium Term Open Access
|
04/12/18 |
(227 KB)
|
Application seeking approval on the Surcharge Waiver Scheme for the Domestic, Non-domestic, Private Tubewell and L.T. Industry Category Consumers.
|
04/02/18 |
(361 KB)
|
Petition filed under Regulation 13 of UERC (Deviation Settlement Mechanism and related matters) Regulations, 2017 for seeking relaxation of one year in Regulation 1(2)
|
03/23/18 |
(145 KB)
|
Petition seeking approval for increase in existing transaction charges per electricity bill, collected by VLEs (Village Level Entrepreneurs) through M/s CSC e-Governance Service India Ltd
|
03/23/18 |
(138 KB)
|
In the Matter of: Petition for approval of “Additional Capital Works amounting to Rs. 44.05 Crore of 4X76 MW Maneri Bhali-II HEP”.
|
03/13/18 |
(141 KB)
|
In the matter of: Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2018 to 31.03.2018.
|
|
(456 KB)
|
In the Matter of: Approval of Capital Investments under Para 11 of the Transmission Licence for laying of OPGW cable under the project “Reliable Communication
|
03/08/18 |
(97 KB)
|
In the matter of: Application seeking approval of the Power Purchase Agreement between M/s Himalaya Hydro Pvt. Ltd. and Uttarakhand Power Corporation Ltd.
|
01/23/18 |
(329 KB)
|
In the matter of: Show cause Notice-cum-Notice for Personal Hearing issued to MD, UPCL in the matter of Non-compliance of sub-Regulation 14 of Regulation 5
|
01/17/18 |
(107 KB)
|
Hon’ble ATE Judgment dated 14.11.2017 in Appeal No. 285 of 2016 & IA No. 585 of 2016 setting aside the Commission’s Order dated 20.09.2016 and remand back
|
01/18/18 |
(322 KB)
|
Application seeking approval of Uttarakhand Electricity Regulatory Commission on the Model Power Purchase Agreement between Uttarakhand Power Corporation Limited
|
09/02/19 |
(333 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
08/29/19 |
(138 KB)
|
Suo-moto proceeding under the provisions of Section 142 and 146 read with Section 149 of the Electricity Act, 2003 initiated for non-compliance of the Commission’s
|
08/26/19 |
(105 KB)
|
Petition seeking approval of the Commission for advance and return banking of power with M/s GMR Energy Trading Ltd., M/s Arunachal Pradesh Power Corporation Pvt. Ltd.
|
08/19/19 |
(427 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2019 to 30.09.2019.
|
08/14/19 |
(263 KB)
|
Suo-moto proceeding in the matter of Gross Violation of the provisions of the Electricity Act, 2003, UERC (Release of New LT Connections, Enhancement and Reduction of Loads)
|
08/13/19 |
(197 KB)
|
Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during June 2013 to March 2017 by M/s Alps Industries Ltd.
|
08/05/19 |
(297 KB)
|
Application seeking approval of the Commission on the Model Power Purchase Agreement between Uttarakhand Power Corporation Limited and selected bidders for setting of Pine Needle based power plants.
|
08/01/19 |
(420 KB)
|
Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd.
|
07/29/19 |
(480 KB)
|
Petition seeking review of Impugned Order dated 20.06.2018 in Petition No. 04/2018 passed by the Uttarakhand Electricity Regulatory commission under Section 94(1)(f) of the Electricity Act, 2003.
|
07/15/19 |
(265 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.04.2019 to 30.06.2019.
|
06/25/19 |
(265 KB)
|
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2019-20 and onwards till reviewed
|
06/07/19 |
(2 MB)
|
Suo moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 18.04.2016 and in the matter of waiver and refund of penalty imposed
|
04/10/19 |
(182 KB)
|
Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERC (Release of New LT Connections,
|
04/10/19 |
(136 KB)
|
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power Trading Company
|
05/10/19 |
(345 KB)
|
Supplementary Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act,
|
04/10/19 |
(426 KB)
|
Petition seeking determination of project specific tariff for 5 MW Tanga Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd. under Section 62 and 86 of the Electricity Act,
|
04/10/19 |
(876 KB)
|
Suo-moto proceeding initiated in the matter of transfer of assets pertaining to 66 kV Substation and Lines from UPCL to PTCUL.
|
04/10/19 |
(144 KB)
|
Dispute between M/s Bhilangana Hydro Power Limited and Uttarakhand Power Corporation Ltd., regarding non-payment of Open Access Charges by UPCL for supply of non-solar renewable power
|
04/10/19 |
(164 KB)
|
Petition for Investment Approval of construction of Colony at 132 kV Substation Majra Campus Dehradun.
|
04/10/19 |
(89 KB)
|
Application seeking approval for the investment on the project covering the construction of 03 Nos., 33/11 kV Substations & their associated 33 kV line.
|
04/08/19 |
(121 KB)
|
Petition seeking permission to set up Solar Power Plant of capacity 50 MW at Village Adhar Mafi, Kujyadi, Dehli in District Almora, Uttarakhand, for sale of electricity by Van Panchayat
|
04/08/19 |
(121 KB)
|
Suo-moto proceedings in the matter of finalization of Station Heat Rate of Gas based Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. and Sravanthi
|
04/05/19 |
(673 KB)
|
Application seeking approval for the investment on the project covering the construction of 05 No. 33/11 KV Substations & their associated 33 KV Line and 06 No. 33 KV Feeders
|
04/04/19 |
(211 KB)
|
Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the order dated 16.03.2017 passed by the Commission
|
04/02/19 |
(395 KB)
|
Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the order dated 16.03.2017 passed by the Commission
|
04/02/19 |
(493 KB)
|
Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the order dated 21.08.2018 passed by the Commission in the matter of determination
|
04/02/19 |
(493 KB)
|
Construction of 2×50 MVA 220/33 kV GIS Substation, Selaqui, Dehradun & its associated LILO of 220 kV Khodri-Jhajhra line at proposed 220/33 kV S/s Selaqui, Dehradun.
|
03/12/19 |
(86 KB)
|
Review Petition filed by UJVN Ltd. under section 94(1) (f) of the Electricity Act, 2003 read with Regulation 54 of UERC (Conduct of Business) Regulations, 2014 seeking
|
03/07/19 |
(172 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2019 to 31.03.2019.
|
03/05/19 |
(443 KB)
|
Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its order dated 06.09.2018, upto March, 2020
|
02/01/19 |
(356 KB)
|
Review Petition filed by M/s Bhilangana Hydro Power Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 54 of UERC (Conduct of Business) Regulations
|
05/24/19 |
(313 KB)
|
Application seeking approval for the investment on the project covering laying of 3250 Km. LT AB cable in theft prone and other areas of District Dehradun, Uttarkashi, Pauri, Haridwar, Nainital
|
01/21/19 |
(153 KB)
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s A B Renewable Energy Pvt. Ltd
|
01/15/19 |
(298 KB)
|
Petition seeking approval of one time registration fee and annual fee to be collected from obligated entities for registration under Renewable Purchase Obligation Compliance system (RPOCS)
|
01/14/19 |
(399 KB)
|
Petition seeking approval on the draft plan to pass on the benefit in electricity tariff to the end consumers of the State.
|
11/08/20 |
(747 KB)
|
Application seeking approval of the Commission for investment on Under grounding of HT & LT Electrical Networks in Haridwar Town under IPDS Program- a flagship program of Ministry of Power
|
12/08/20 |
(168 KB)
|
Petition seeking determination of Term of Use for Utilisation of 220 kV S/c dedicated Transmission line of M/s Greenko Budhil Hydro Electrical Project for evacuation of power
|
12/04/20 |
(265 KB)
|
Petition for review of the Tariff Order dated 18.04.2020 with respect to the truing up of Non-Tariff Income for the FY 2018-19.
|
12/03/20 |
(109 KB)
|
Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees and Rs. 55,080/-
|
11/01/20 |
(195 KB)
|
Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur as the land belonging
|
11/01/20 |
(230 KB)
|
Application seeking Review under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 read with relevant provisions of the Electricity Act, 2003 for review of the Order dated 18.04.2020
|
11/20/20 |
(250 KB)
|
Petition for review of the Commission’s Order dated 18.04.2020 on True up for FY 2018-19, Annual Performance Review for FY 2019-20 and Annual Revenue Requirement for FY 2020-21.
|
11/11/20 |
(582 KB)
|
Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL to an individual consumer connected to the electrical network
|
11/04/20 |
(193 KB)
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and Uttarakhand Power Development
|
10/19/20 |
(189 KB)
|
Application for adjudication of dispute between Beta Infratech Private Limited and Uttarakhand Power Corporation Limited in respect of termination of Power Purchase Agreement
|
10/07/20 |
(376 KB)
|
Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 11.05.2020, upto March, 2020
|
10/05/20 |
(149 KB)
|
Extension of the period of applicability of the benchmark capital cost and levellised generic tariff issued by the Commission for Solar Energy based plants vide Suo-moto Order dated 07.06.2019
|
09/30/20 |
(149 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
09/22/20 |
(143 KB)
|
Petition for seeking investment approval on the project for covering the construction of 02 nos. 33/11 kV Substations & their associated 24.30 Kms. 33 kV Line.
|
09/15/20 |
(178 KB)
|
Petition seeking increase in ceiling limit of 1 MW applicable to Grid Interactive Rooftop and Small Solar PV Plants to 2 MW under RE Regulations, 2018 for net metering arrangement.
|
09/17/20 |
(163 KB)
|
Suo-moto Order on the request of UPCL for determination of Tariff considering subsidy at the rate of 80% for the Solar Projects installed/to be installed under PM-Kusum Yojana
|
09/15/20 |
(253 KB)
|
Application seeking prior approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Bhilangana Hydro Power Ltd.
|
07/29/20 |
(190 KB)
|
Petition seeking approval of the Commission for advance and return banking of power with M/s Arunachal Pradesh Power Corporation Pvt. Ltd., M/s PTC India Ltd., M/s Kreate Energy
|
07/20/20 |
(247 KB)
|
Time extension in scheduled commissioning date of Solar PV Plants to be developed by various developers in the State of Uttarakhand considering disruption due to lockdown
|
06/23/20 |
(191 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
06/19/20 |
(138 KB)
|
Deployment of customised Renewable Purchase Obligation Compliance System (RPOCS) Web Tool in Uttarakhand.
|
06/19/20 |
(122 KB)
|
Application seeking approval for inclusion of soft drink concentrate in seasonal industries product list.
|
06/09/20 |
(145 KB)
|
Application seeking approval for investment on the Implementation of Enterprise Resource Planning (ERP) under Integrated Power Development Scheme (IPDS) of Ministry of Power, Govt. of India.
|
06/03/20 |
(206 KB)
|
Petition for seeking approval of the Commission for the investment on the Implementation of Real Time Data Acquisition System (RTDAS) for SAIFI/SAIDI measurement
|
05/22/20 |
(176 KB)
|
Extension of the period of applicability of the benchmark capital cost and levellised generic tariff issued by the Commission for Solar Energy based plants vide Suo-moto
|
05/11/20 |
(142 KB)
|
Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd.
|
03/11/20 |
(246 KB)
|