| Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar generating project of the Petitioner. | 19/04/2022 |
Accessible Version :
View(99 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar generating project of the Petitioner. | 19/04/2022 |
Accessible Version :
View(98 KB)
|
| Petition seeking extension of Control Period of the Benchmark Capital Cost & Generic Tariff as declared by the Commission vide its Orders dated 11.05.2020, 30.09.2020 and 05.10.2020 till March | 19/04/2022 |
Accessible Version :
View(99 KB)
|
| Miscellaneous Petition, inter alia amongst other grounds concerning refund of MDC/LPS charges by illegal disconnection and for determining whether Minimum Demand Charges | 11/03/2022 |
Accessible Version :
View(75 KB)
|
| Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity | 11/03/2022 |
Accessible Version :
View(79 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021 | 23/02/2022 |
Accessible Version :
View(58 KB)
|
| Suo-moto proceedings initiated by the Commission in the matter of Noncompliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the UERC | 23/02/2022 |
Accessible Version :
View(57 KB)
|
| Petition under Section 79 of the Electricity Act, 2003, read with Article 13 (“Change in Law”) of the Power Purchase Agreement (“PPA”) dated 19.03.2012 executed between M/s Uttam Sugar Mills Ltd | 30/11/2021 |
Accessible Version :
View(98 KB)
|
| Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from Generating Stations operating in Ravi Basin | 16/11/2021 |
Accessible Version :
View(107 KB)
|
| Petition to Hon’ble Commission for resolution of matter pertaining to Deviation Settlement Mechanism (“DSM”) Claim for 214 MW (225 MW ISO) for Phase I of 2×225 MW | 12/10/2021 |
Accessible Version :
View(65 KB)
|
| Review Petition for review of the Order dated 11.06.2021 passed by the Commission in Petition No. 21 of 2020 in accordance with Section 94(f) of the Electricity Act | 21/09/2021 |
Accessible Version :
View(100 KB)
|
| Hon’ble APTEL’s Judgement dated 02.03.2020 in Appeal No. 18 of 2016. | 14/09/2021 |
Accessible Version :
View(74 KB)
|
| Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. in terms of the directions contained in Order of the Commission | 07/09/2021 |
Accessible Version :
View(100 KB)
|
| Hon’ble APTEL’s Judgement dated 02.03.2020 in Appeal No. 18 of 2016. | 28/07/2021 |
Accessible Version :
View(77 KB)
|
| Petition under Section 86(1) (c), (f) and (k) read with Section 30, Section 39(2) (c), Section 40(a) and Section 42(1) of Electricity Act, 2003 seeking directions | 15/06/2021 |
Accessible Version :
View(76 KB)
|
| Petition under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 1(3), 11(1) and 12 of the Uttarakhand Electricity Regulatory Commission | 23/03/2021 |
Accessible Version :
View(99 KB)
|
| Interlocutory Application seeking directions to the Respondent No. 1 to maintain status quo qua 33/11 kV Darati Sub-station, thereby directing exclusive connectivity | 12/03/2021 |
Accessible Version :
View(75 KB)
|
| Repeated violation of Regulation 40 of CBR, clause 11 of licence conditions and directions of the Commission issued in its various orders by UPCL. | 09/03/2021 |
Accessible Version :
View(105 KB)
|
| Petition for seeking carry forward of expected surplus of 320.62 MU (non-solar) and expected deficit of 110.28 MU (Solar) Renewable Purchase Obligation of FY 2020-21 | 09/03/2021 |
Accessible Version :
View(97 KB)
|
| Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. | 05/01/2021 |
Accessible Version :
View(51 KB)
|
| To grant permanent connectivity for 214MW (225 MW ISO) for Phase II of SEPL Power Project without any state transmission charges/losses upto Intra-State | 22/12/2020 |
Accessible Version :
View(46 KB)
|
| Petition under Section 86 (1)(a), Section 86(1)(f) read with Section 61(d) seeking directions to State Load Despatch Centre of Uttarakhand to consider Scheduled Capacity | 20/12/2020 |
Accessible Version :
View(98 KB)
|
| Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur | 27/10/2020 |
Accessible Version :
View(79 KB)
|
| Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees | 17/10/2020 |
Accessible Version :
View(78 KB)
|
| Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corp. Ltd. and Uttarakhand | 13/10/2020 |
Accessible Version :
View(99 KB)
|
| Petition for issuing necessary directions for fixing the electricity rate as per the FY 2015-16 for the allocated Solar Power Plants with respect to the advertisement date | 13/10/2020 |
Accessible Version :
View(99 KB)
|
| Petition for extension of time for compliance of directions given by Hon’ble Commission vide order dated 07.01.2020 passed in the matter of relaxing/waiving | 13/10/2020 |
Accessible Version :
View(83 KB)
|
| Application seeking approval of the Commission for investment on Under grounding of HT & LT Electrical Networks in Haridwar Town under IPDS Program- a flagship | 25/08/2020 |
Accessible Version :
View(48 KB)
|
| Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its order dated 11.05.2020, upto March 2022 | 18/08/2020 |
Accessible Version :
View(98 KB)
|
| Petition seeking increase in ceiling limit of 1 MW applicable to grid connected rooftop and solar power plants to 2 MW under RE Regulations, 2018 for net metering arrangement. | 18/08/2020 |
Accessible Version :
View(97 KB)
|
| Petition for development of 2 MW Solar Project located at Birpur, Dehradun which is under progress and to be connected at 33/11 kV Anarwala (MRS) Dehradun Cantt | 18/08/2020 |
Accessible Version :
View(99 KB)
|
| Application for determination of Term of use for Utilization of 220 kV S/c Dedicated Transmission Line of M/s Greenko Budhil Hydro Electrical Project | 14/08/2020 |
Accessible Version :
View(107 KB)
|
| Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. | 29/05/2020 |
Accessible Version :
View(46 KB)
|
| Petition for seeking approval of the Commission for the investment on the Implementation of Real Time Data Acquisition System (RTDAS) for SAIFI/SAIDI | 14/02/2020 |
Accessible Version :
View(59 KB)
|
| Representation/Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL | 14/02/2020 |
Accessible Version :
View(110 KB)
|
| Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 | 04/02/2020 |
Accessible Version :
View(100 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. | 13/12/2019 |
Accessible Version :
View(71 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. | 15/11/2019 |
Accessible Version :
View(52 KB)
|
| Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to component ‘A’ that is, regarding to transmission | 15/11/2019 |
Accessible Version :
View(51 KB)
|
| Representation/Petition under Section 67(4) Of The Electricity Act, 2003 | 14/11/2019 |
Accessible Version :
View(83 KB)
|
| Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its Order dated 06.09.2018, upto March | 22/10/2019 |
Accessible Version :
View(244 KB)
|
| Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 | 22/10/2019 |
Accessible Version :
View(251 KB)
|
| Petition for determination of Project Specific Tariff for Dunao Small Hydro Power Station (2 X 750 kW) of UJVN Ltd. under Section 62 and 86 of the Electricity | 22/10/2019 |
Accessible Version :
View(244 KB)
|
| Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC | 22/10/2019 |
Accessible Version :
View(68 KB)
|
| Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide its Order dated 07.06.2019, upto October | 09/09/2019 |
Accessible Version :
View(244 KB)
|
| Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on open access Power | 09/09/2019 |
Accessible Version :
View(69 KB)
|
| Petition seeking Review of the order of the Commission dated April, 10, 2019 in petition no. 31 of 2017 seeking determination of project specific tariff for Tanga Hydro Power Project | 03/09/2019 |
Accessible Version :
View(245 KB)
|
| Petition for seeking carry forward of surplus of 139.00 MU (Non-Solar) Renewable Purchase Obligation of FY 2018-19 as per the provision of UERC | 03/09/2019 |
Accessible Version :
View(245 KB)
|
| Petition for approval of Tariff rate revision from 70% CFA to Non CFA tariff rates for small solar plants, which already have 25 years PPA with UPCL | 03/09/2019 |
Accessible Version :
View(252 KB)
|
| Gross Violation of the provisions of the Electricity Act, 2003, UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 and UERC | 15/07/2019 |
Accessible Version :
View(69 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. | 15/07/2019 |
Accessible Version :
View(145 KB)
|
| Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to component A, that is, regarding to transmission charges | 15/07/2019 |
Accessible Version :
View(155 KB)
|
| Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during 2013 to 2017 by Alps Industries Ltd. | 15/07/2019 |
Accessible Version :
View(73 KB)
|
| APTEL’s Judgement dated 23.04.2019 in Appeal No. 287 of 2015. | 10/07/2019 |
Accessible Version :
View(247 KB)
|
| Petition seeking review of Impugned Order dated 20.06.2018 in Petition No. 04/2018 passed by the Commission under Section 94(1)(f) of the Electricity Act, 2003. | 12/06/2019 |
Accessible Version :
View(237 KB)
|
| Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during 2013 to 2017 by Alps Industries Ltd. | 30/05/2019 |
Accessible Version :
View(76 KB)
|
| Suo-moto proceeding initiated by the Commission in the matter of transfer of 66 kV Substation and Lines from UPCL to PTCUL. | 02/04/2019 |
Accessible Version :
View(65 KB)
|
| Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. | 02/04/2019 |
Accessible Version :
View(246 KB)
|
| Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. | 02/04/2019 |
Accessible Version :
View(86 KB)
|
| Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. | 12/03/2019 |
Accessible Version :
View(148 KB)
|
| Dispute between M/s Bhilangana Hydro Power Limited and Uttarakhand Power Corporation Ltd., Regarding non-payment of Open Access Charges by UPCL for supply | 12/03/2019 |
Accessible Version :
View(72 KB)
|
| Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power | 12/03/2019 |
Accessible Version :
View(241 KB)
|
| Petition for review of the Commission’s Order dated 19.06.2018 read with letter No. 1144 dated 06.11.2018 on Suo moto proceeding regarding handing over of distribution business to UPCL. | 11/02/2019 |
Accessible Version :
View(68 KB)
|
| Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 21.08.2018 | 22/01/2019 |
Accessible Version :
View(245 KB)
|
| Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 16.03.2017 passed by the Commission | 22/01/2019 |
Accessible Version :
View(245 KB)
|
| Petition seeking approval of Power Purchase Agreement dated 05.02.2003 and Supplementary Power Purchase Agreement dated 07.12.2009 between Himalaya Hydro Pvt. Ltd. | 25/05/2018 |
Accessible Version :
View(230 KB)
|
| Clarification Petition under Regulation 59 and 61 r/w Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 and Regulation, 2015 in the matter of Tariff Order dated 30.11.2016 |
Accessible Version :
View(228 KB)
|
|
| Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of Section 59 of the Electricity Act, 2003 read with Regulation 5 of UERC (Standard of Performance) |
Accessible Version :
View(53 KB)
|
|
| Application seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005 AND UPCL. |
Accessible Version :
View(52 KB)
|
|
| Non-Compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated 11.04.2012 for FY 2012-13. |
Accessible Version :
View(266 KB)
|
|
| Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008. |
Accessible Version :
View(45 KB)
|
|
| Petition filed by UJVN Ltd. for review of the Order on Approval of Business Plan and Multi Year Tariff for FY 2013-14 to FY 2015-16. |
Accessible Version :
View(49 KB)
|
|
| Non-Compliance by Obligated Entities under UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations |
Accessible Version :
View(62 KB)
|
|
| Filing of petition for re-determination of Generic Tariff for Pathri Small Hydro Generating Station (3×6.8 MW) & Mohammadpur Small Hydro Generating Station (3×3.1 MW) of UJVN Ltd. |
Accessible Version :
View(70 KB)
|
|
| Petition under Section 86(1)(f) read with Section 142 of the Electricity Act, 2003 for Recovery of deemed generation charges from UPCL for the Financial Year 2012-2013 and Financial Year 2013-2014 |
Accessible Version :
View(69 KB)
|
|
| Proceeding initiated in the Commission’s Order dated 08.07.2014 under section 142 of the Electricity Act, 2003 for non-compliance of the provisions of the section 67 & 68 of the Electricity Act |
Accessible Version :
View(51 KB)
|
|
| Petition to wave the token Penalty of Rs. 10,000/- imposed under Section 142 of the Electricity Act, 2003 for non compliance |
Accessible Version :
View(44 KB)
|
|
| Petition seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005. |
Accessible Version :
View(63 KB)
|
|
| Petition with regard to Investment Approval for construction of well foundations and tower protection works at different locations of 220 kV DC Twin Zebra transmission line from 220 kV S/s Dehradun |
Accessible Version :
View(46 KB)
|
|
| Petition seeking approval for the Investment on Dehradun Project covering the woks covered under Part-B of R-APDRP of MoP, GoI for reduction of AT&C losses to the extent of 15%. |
Accessible Version :
View(62 KB)
|
|
| Petition seeking approval for Investment on SCADA/DMS Project of Dehradun town covered under Part-A of R-APDRP of MoP GoI. |
Accessible Version :
View(60 KB)
|
|
| Petition for in-principle approval of Capital Expenditure for Balance Capital Works of 4×76 MW MB-II HEP of UJVN Ltd. |
Accessible Version :
View(65 KB)
|
|
| Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015. |
Accessible Version :
View(163 KB)
|
|
| Petition for prior approval of Capital investment for Renovation & Modernization of MB-I (3×30 MW) HEP of UJVN Ltd. |
Accessible Version :
View(62 KB)
|
|
| Show cause notices dated 28.07.2014 issued to Sh. Kamal Kant, Chief Engineer (C&R) & Sh. A.K. Agarwal, Superintending Engineer (Engg.), PTCUL. |
Accessible Version :
View(66 KB)
|
|
| Petition for approval of Capital investment for Refurbishing of Asan Barrage of UJVN Ltd. under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations |
Accessible Version :
View(47 KB)
|
|
| Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. and UPCL in accordance with the provisions of UERC |
Accessible Version :
View(174 KB)
|
|
| Application seeking approval of Hon’ble UERC for the investment on the projects covering the construction of 14 No. 33/11 kV Substation and their associated lines of 113.70 Km. |
Accessible Version :
View(41 KB)
|
|
| Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access |
Accessible Version :
View(52 KB)
|
|
| Notice under section 142 of the Electricity Act, 2003 in the matter of non-compliance of the provisions of Section 67 read with Section 12 of the Indian Electricity Act |
Accessible Version :
View(44 KB)
|
|
| Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rule 2006 on the Order dated 20.05.2014 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand) |
Accessible Version :
View(88 KB)
|
|
| Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015. |
Accessible Version :
View(88 KB)
|
|
| Review petition filed under regulation 68 of the UERC(Conduct of Business Regulations,2004 for review of the order dated April10, 2014 passed by the UERC with respect to determination of tariff |
Accessible Version :
View(48 KB)
|
|
| Petition for clarification on various issues for implementation of “Uttarakhand Grid Interacted Rooftop and Small SPV Power Plants Scheme”. |
Accessible Version :
View(47 KB)
|
|
| Notice issued to MD, UPCL under Section 142 of the Electricity Act, 2003 in the matter of non-compliance of the Commission’s Order dated 24.06.2014 on the Review Petition |
Accessible Version :
View(65 KB)
|
|
| Notice issued to MD, UPCL under Section 43(3) of the Electricity Act, 2003 in the matter of violation of the provisions of section 43(1) of the Electricity Act, 2003 |
Accessible Version :
View(56 KB)
|
|
| Petition for seeking carry forward of Renewable Purchase Obligation for FY 2013-14 amounting to 387.68 MU (Non-Solar) and 1.08 MU (Solar) as per the provisions of UERC |
Accessible Version :
View(72 KB)
|
|
| Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station |
Accessible Version :
View(113 KB)
|
|
| Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. And UPCL in accordance with the provisions of UERC |
Accessible Version :
View(113 KB)
|
|
| Application seeking post facto approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01-07-2014 to 30-09-2014. |
Accessible Version :
View(220 KB)
|