Close

    Daily Orders

    Filter Document category wise
    Daily Orders
    Title Date View / Download
    Interlocutory Application seeking directions to the Respondent No. 1 to maintain status quo qua 33/11 kV Darati Sub-station, thereby directing exclusive connectivity 12/03/2021
    Accessible Version : View(75 KB)
    Repeated violation of Regulation 40 of CBR, clause 11 of licence conditions and directions of the Commission issued in its various orders by UPCL. 09/03/2021
    Accessible Version : View(105 KB)
    Petition for seeking carry forward of expected surplus of 320.62 MU (non-solar) and expected deficit of 110.28 MU (Solar) Renewable Purchase Obligation of FY 2020-21 09/03/2021
    Accessible Version : View(97 KB)
    Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. 05/01/2021
    Accessible Version : View(51 KB)
    To grant permanent connectivity for 214MW (225 MW ISO) for Phase II of SEPL Power Project without any state transmission charges/losses upto Intra-State 22/12/2020
    Accessible Version : View(46 KB)
    Petition under Section 86 (1)(a), Section 86(1)(f) read with Section 61(d) seeking directions to State Load Despatch Centre of Uttarakhand to consider Scheduled Capacity 20/12/2020
    Accessible Version : View(98 KB)
    Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur 27/10/2020
    Accessible Version : View(79 KB)
    Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees 17/10/2020
    Accessible Version : View(78 KB)
    Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corp. Ltd. and Uttarakhand 13/10/2020
    Accessible Version : View(99 KB)
    Petition for issuing necessary directions for fixing the electricity rate as per the FY 2015-16 for the allocated Solar Power Plants with respect to the advertisement date 13/10/2020
    Accessible Version : View(99 KB)
    Petition for extension of time for compliance of directions given by Hon’ble Commission vide order dated 07.01.2020 passed in the matter of relaxing/waiving 13/10/2020
    Accessible Version : View(83 KB)
    Application seeking approval of the Commission for investment on Under grounding of HT & LT Electrical Networks in Haridwar Town under IPDS Program- a flagship 25/08/2020
    Accessible Version : View(48 KB)
    Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its order dated 11.05.2020, upto March 2022 18/08/2020
    Accessible Version : View(98 KB)
    Petition seeking increase in ceiling limit of 1 MW applicable to grid connected rooftop and solar power plants to 2 MW under RE Regulations, 2018 for net metering arrangement. 18/08/2020
    Accessible Version : View(97 KB)
    Petition for development of 2 MW Solar Project located at Birpur, Dehradun which is under progress and to be connected at 33/11 kV Anarwala (MRS) Dehradun Cantt 18/08/2020
    Accessible Version : View(99 KB)
    Application for determination of Term of use for Utilization of 220 kV S/c Dedicated Transmission Line of M/s Greenko Budhil Hydro Electrical Project 14/08/2020
    Accessible Version : View(107 KB)
    Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. 29/05/2020
    Accessible Version : View(46 KB)
    Petition for seeking approval of the Commission for the investment on the Implementation of Real Time Data Acquisition System (RTDAS) for SAIFI/SAIDI 14/02/2020
    Accessible Version : View(59 KB)
    Representation/Petition under Section 67(4) of the Electricity Act, 2003, in the matter of dispute regarding release of connection by UPCL 14/02/2020
    Accessible Version : View(110 KB)
    Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 04/02/2020
    Accessible Version : View(100 KB)
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. 13/12/2019
    Accessible Version : View(71 KB)
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. 15/11/2019
    Accessible Version : View(52 KB)
    Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to component ‘A’ that is, regarding to transmission 15/11/2019
    Accessible Version : View(51 KB)
    Representation/Petition under Section 67(4) Of The Electricity Act, 2003 14/11/2019
    Accessible Version : View(83 KB)
    Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its Order dated 06.09.2018, upto March 22/10/2019
    Accessible Version : View(244 KB)
    Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 22/10/2019
    Accessible Version : View(251 KB)
    Petition for determination of Project Specific Tariff for Dunao Small Hydro Power Station (2 X 750 kW) of UJVN Ltd. under Section 62 and 86 of the Electricity 22/10/2019
    Accessible Version : View(244 KB)
    Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC 22/10/2019
    Accessible Version : View(68 KB)
    Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide its Order dated 07.06.2019, upto October 09/09/2019
    Accessible Version : View(244 KB)
    Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on open access Power 09/09/2019
    Accessible Version : View(69 KB)
    Petition seeking Review of the order of the Commission dated April, 10, 2019 in petition no. 31 of 2017 seeking determination of project specific tariff for Tanga Hydro Power Project 03/09/2019
    Accessible Version : View(245 KB)
    Petition for seeking carry forward of surplus of 139.00 MU (Non-Solar) Renewable Purchase Obligation of FY 2018-19 as per the provision of UERC 03/09/2019
    Accessible Version : View(245 KB)
    Petition for approval of Tariff rate revision from 70% CFA to Non CFA tariff rates for small solar plants, which already have 25 years PPA with UPCL 03/09/2019
    Accessible Version : View(252 KB)
    Gross Violation of the provisions of the Electricity Act, 2003, UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 and UERC 15/07/2019
    Accessible Version : View(69 KB)
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. 15/07/2019
    Accessible Version : View(145 KB)
    Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to component A, that is, regarding to transmission charges 15/07/2019
    Accessible Version : View(155 KB)
    Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during 2013 to 2017 by Alps Industries Ltd. 15/07/2019
    Accessible Version : View(73 KB)
    APTEL’s Judgement dated 23.04.2019 in Appeal No. 287 of 2015. 10/07/2019
    Accessible Version : View(247 KB)
    Petition seeking review of Impugned Order dated 20.06.2018 in Petition No. 04/2018 passed by the Commission under Section 94(1)(f) of the Electricity Act, 2003. 12/06/2019
    Accessible Version : View(237 KB)
    Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during 2013 to 2017 by Alps Industries Ltd. 30/05/2019
    Accessible Version : View(76 KB)
    Suo-moto proceeding initiated by the Commission in the matter of transfer of 66 kV Substation and Lines from UPCL to PTCUL. 02/04/2019
    Accessible Version : View(65 KB)
    Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. 02/04/2019
    Accessible Version : View(246 KB)
    Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. 02/04/2019
    Accessible Version : View(86 KB)
    Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. 12/03/2019
    Accessible Version : View(148 KB)
    Dispute between M/s Bhilangana Hydro Power Limited and Uttarakhand Power Corporation Ltd., Regarding non-payment of Open Access Charges by UPCL for supply 12/03/2019
    Accessible Version : View(72 KB)
    Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power 12/03/2019
    Accessible Version : View(241 KB)
    Petition for review of the Commission’s Order dated 19.06.2018 read with letter No. 1144 dated 06.11.2018 on Suo moto proceeding regarding handing over of distribution business to UPCL. 11/02/2019
    Accessible Version : View(68 KB)
    Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 21.08.2018 22/01/2019
    Accessible Version : View(245 KB)
    Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 16.03.2017 passed by the Commission 22/01/2019
    Accessible Version : View(245 KB)
    Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of Section 59 of the Electricity Act, 2003 read with Regulation 5 of UERC (Standard of Performance)
    Accessible Version : View(53 KB)
    Application seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005 AND UPCL.
    Accessible Version : View(52 KB)
    Non-Compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated 11.04.2012 for FY 2012-13.
    Accessible Version : View(266 KB)
    Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.
    Accessible Version : View(45 KB)
    Petition filed by UJVN Ltd. for review of the Order on Approval of Business Plan and Multi Year Tariff for FY 2013-14 to FY 2015-16.
    Accessible Version : View(49 KB)
    Non-Compliance by Obligated Entities under UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations
    Accessible Version : View(62 KB)
    Filing of petition for re-determination of Generic Tariff for Pathri Small Hydro Generating Station (3×6.8 MW) & Mohammadpur Small Hydro Generating Station (3×3.1 MW) of UJVN Ltd.
    Accessible Version : View(70 KB)
    Petition under Section 86(1)(f) read with Section 142 of the Electricity Act, 2003 for Recovery of deemed generation charges from UPCL for the Financial Year 2012-2013 and Financial Year 2013-2014
    Accessible Version : View(69 KB)
    Proceeding initiated in the Commission’s Order dated 08.07.2014 under section 142 of the Electricity Act, 2003 for non-compliance of the provisions of the section 67 & 68 of the Electricity Act
    Accessible Version : View(51 KB)
    Petition to wave the token Penalty of Rs. 10,000/- imposed under Section 142 of the Electricity Act, 2003 for non compliance
    Accessible Version : View(44 KB)
    Petition seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.
    Accessible Version : View(63 KB)
    Petition with regard to Investment Approval for construction of well foundations and tower protection works at different locations of 220 kV DC Twin Zebra transmission line from 220 kV S/s Dehradun
    Accessible Version : View(46 KB)
    Petition seeking approval for the Investment on Dehradun Project covering the woks covered under Part-B of R-APDRP of MoP, GoI for reduction of AT&C losses to the extent of 15%.
    Accessible Version : View(62 KB)
    Petition seeking approval for Investment on SCADA/DMS Project of Dehradun town covered under Part-A of R-APDRP of MoP GoI.
    Accessible Version : View(60 KB)
    Petition for in-principle approval of Capital Expenditure for Balance Capital Works of 4×76 MW MB-II HEP of UJVN Ltd.
    Accessible Version : View(65 KB)
    Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015.
    Accessible Version : View(163 KB)
    Petition for prior approval of Capital investment for Renovation & Modernization of MB-I (3×30 MW) HEP of UJVN Ltd.
    Accessible Version : View(62 KB)
    Show cause notices dated 28.07.2014 issued to Sh. Kamal Kant, Chief Engineer (C&R) & Sh. A.K. Agarwal, Superintending Engineer (Engg.), PTCUL.
    Accessible Version : View(66 KB)
    Petition for approval of Capital investment for Refurbishing of Asan Barrage of UJVN Ltd. under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations
    Accessible Version : View(47 KB)
    Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. and UPCL in accordance with the provisions of UERC
    Accessible Version : View(174 KB)
    Application seeking approval of Hon’ble UERC for the investment on the projects covering the construction of 14 No. 33/11 kV Substation and their associated lines of 113.70 Km.
    Accessible Version : View(41 KB)
    Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access
    Accessible Version : View(52 KB)
    Notice under section 142 of the Electricity Act, 2003 in the matter of non-compliance of the provisions of Section 67 read with Section 12 of the Indian Electricity Act
    Accessible Version : View(44 KB)
    Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rule 2006 on the Order dated 20.05.2014 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand)
    Accessible Version : View(88 KB)
    Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015.
    Accessible Version : View(88 KB)
    Review petition filed under regulation 68 of the UERC(Conduct of Business Regulations,2004 for review of the order dated April10, 2014 passed by the UERC with respect to determination of tariff
    Accessible Version : View(48 KB)
    Petition for clarification on various issues for implementation of “Uttarakhand Grid Interacted Rooftop and Small SPV Power Plants Scheme”.
    Accessible Version : View(47 KB)
    Notice issued to MD, UPCL under Section 142 of the Electricity Act, 2003 in the matter of non-compliance of the Commission’s Order dated 24.06.2014 on the Review Petition
    Accessible Version : View(65 KB)
    Notice issued to MD, UPCL under Section 43(3) of the Electricity Act, 2003 in the matter of violation of the provisions of section 43(1) of the Electricity Act, 2003
    Accessible Version : View(56 KB)
    Petition for seeking carry forward of Renewable Purchase Obligation for FY 2013-14 amounting to 387.68 MU (Non-Solar) and 1.08 MU (Solar) as per the provisions of UERC
    Accessible Version : View(72 KB)
    Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View(113 KB)
    Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. And UPCL in accordance with the provisions of UERC
    Accessible Version : View(113 KB)
    Application seeking post facto approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01-07-2014 to 30-09-2014.
    Accessible Version : View(220 KB)
    Petition for seeking carry forward of Renewable Purchase Obligation for FY 2013-14 amounting to 387.68 MU (Non-Solar) and 1.08 MU (Solar) as per the provisions of UERC
    Accessible Version : View(70 KB)
    Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View(153 KB)
    Application seeking approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Regency Yamuna Energy
    Accessible Version : View(151 KB)
    In the matter of: Filing of proposal for prior approval of “Capital Investment for Renovation & Modernization of 3 x 10 MW Kulhal HEP” of UJVN Ltd. under Section 61 and 86 of the Electricity Act
    Accessible Version : View(51 KB)
    Application under Section 42(2) of the Electricity Act, 2003 read with Regulation 58 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations
    Accessible Version : View(52 KB)
    In the matter of: Application seeking approval of the Commission for the investment on the project covering construction of 44.1 km, 33 kV line to connect 7 Nos. 33/11 kV
    Accessible Version : View(64 KB)
    Review Petition on the Commission’s Order dated 05.05.2014 under provisions of the Regulation 68 Regulation 74 of UERC (Conduct of Business) Regulations
    Accessible Version : View(71 KB)
    Petition to waive the per day Penalty for non compliance imposed vide order dated 22 January, 2014 passed by the Commission.
    Accessible Version : View(159 KB)
    In the matter of: Application seeking approval for the investment on the projects covering (i) Replacement of ACSR conductor by AB cable in theft prone areas.
    Accessible Version : View(71 KB)
    Petition seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Super Hydro Electric Pvt. Ltd.
    Accessible Version : View(77 KB)
    Application seeking recovery of claim in respect of Deemed Generation under Section 44 (A) of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy
    Accessible Version : View(164 KB)
    Petition to waive the per day Penalty for non compliance imposed vide order dated 22 January, 2014 passed by the Commission.
    Accessible Version : View(140 KB)
    Dispute between UJVN Ltd. and Uttarakhand Power Corporation Limited (UPCL) relating to payments.
    Accessible Version : View(49 KB)
    Review Petition on the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads)
    Accessible Version : View(46 KB)
    Suo-moto proceedings initiated under section 142 of the Electricity Act, 2003 for Non compliance of the Commission’s Directions
    Accessible Version : View(54 KB)
    Non-compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated April 11, 2012 for FY 2012-13.
    Accessible Version : View(203 KB)
    Review Petition against the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of Non-compliance of UERC (Release of New HT & EHT Connections
    Accessible Version : View(44 KB)
    Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View(155 KB)