    Petition on behalf of the petitioners filed under Regulation 9 of the UERC (Conduct of Business Regulation), 2014 read with Regulations 50 & 59, Sec. 142 of the Electricity Act, 2003 and Sec. 12 11/07/2025
    Accessible Version : View(86 KB)
    Petition on behalf of the petitioners filed under Regulation 9 of the UERC (Conduct of Business Regulation), 2014 read with Regulations 59 & 66 and Order XXI of the Code of Civil Procedure, 1908 11/07/2025
    Accessible Version : View(86 KB)
    Application seeking review of the UERC’s Tariff Order dated 24.03.2025 on Approval of Capital Cost, True-up for FY 2022-23, and Annual Fixed Charges for FY 2024-25 for Vyasi Hydro Electric Project. 17/06/2025
    Accessible Version : View(54 KB)
    Petition seeking review of the Commission’s Order dated 27.03.2025, passed in the Suo-Moto proceedings regarding Extension requests for development and commissioning of Solar Power Plants allotted 17/06/2025
    Accessible Version : View(99 KB)
    Suo-moto proceeding initiated under the provisions of Section 142 read with Section 146 & Section 149 of the Electricity Act, 2003 in the matter of Non-compliance of the Commission’s directions 17/06/2025
    Accessible Version : View(101 KB)
    Petition seeking implementation of Clause 26-Taxes and Duties of UERC (Tariff and other Terms for supply of Electricity from Non-conventional & Renewable Energy Sources) Regulations, 2010 17/06/2025
    Accessible Version : View(112 KB)
    Hon’ble APTEL’s Order dated 24.03.2025 in Appeal No. 295 of 2018 in the matter of Appeal against the Commission’s Order dated 24.11.2017 in Petition No. 40 of 2017 (Suo-moto). 10/06/2025
    Accessible Version : View(98 KB)
    Suo-moto proceeding initiated by the Commission in the matter of Show Cause Notice under Section 142 of the Electricity Act, 2003, read with Regulation 3.3.2(4) of the UERC The Electricity Supply Code 10/06/2025
    Accessible Version : View(64 KB)
    Suo-moto proceeding initiated under the provisions of Section 142 read with Section 146 & Section 149 of the Electricity Act, 2003 in the matter of Non-compliance of the Commission’s directions 10/06/2025
    Accessible Version : View(120 KB)
    Application seeking review of the Tariff Order issued by the Commission on 11.04.2025 on the determination of AFC charges 06/06/2025
    Accessible Version : View(100 KB)
    Petition seeking review of the Commission’s Order dated 27.03.2025, passed in the Suo-Moto proceedings regarding Extension requests 06/06/2025
    Accessible Version : View(101 KB)
    Petition for seeking prior approval of Capital investment for Augmentation of transformer capacity of 132 kV/33 kV substation of Sharda Power House. 20/05/2025
    Accessible Version : View(57 KB)
    Petition seeking review of the Commission’s Order dated 27.03.2025, passed in the Suo-Moto proceedings regarding Extension requests for development and commissioning of Solar Power Plants allotted. 13/05/2025
    Accessible Version : View(99 KB)
    Petition under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003, read with Regulation 59(1) of The UERC (Conduct of Business) Regulations 2014 and the “Guidelines for Procurement of. 06/05/2025
    Accessible Version : View(100 KB)
    Filing of Miscellaneous Petition u/s 181(1) r/w Section 181(2)(zp) r/w Section 94(1)(f) of the Indian Electricity Act, 2003, seeking relaxation of Clause 2.1(4) of the UERC 29/04/2025
    Accessible Version : View(61 KB)
    Filing of Miscellaneous Petition u/s 181(1) r/w Section 181(2)(zp) r/w Section 94(1)(f) of the Indian Electricity Act, 2003, seeking relaxation of Clause 2.1(4) of the UERC (the Electricity Supply. 29/04/2025
    Accessible Version : View(100 KB)
    Petition regarding permission to install GRPV Plant beyond 1.0 MW limit set by the Commission with Net Metering facility by UPCL. AND 27/02/2025
    Accessible Version : View(97 KB)
    Application under Regulation 59(1) of the UERC (Conduct of Business) Regulations, 2014, Section 94, Section 64 and Section 86(1)(f) & (k) of the Electricity Act, 2003, 14/02/2025
    Accessible Version : View(106 KB)
    Application filed by M/s Galwalia Ispat Udyog Pvt. Ltd and M/s Kumaon Garhwal Chamber of Commerce & Industry (KGCCI) seeking review of Commission’s Order dated 30.09.2024 21/01/2025
    Accessible Version : View(45 KB)
    Suo-moto proceedings w.r.t. implementation of Hon’ble APTEL’s Judgement dated 28.08.2024 in Appeal No. 100 of 2017 and Appeal No. 389 of 2018. 17/12/2024
    Accessible Version : View(100 KB)
    Suo-moto proceeding in the matter of Show Cause Notice under Section 142 of the Electricity Act, 2003, read with Regulation 3.3.2(4) of the UERC (The Electricity Supply Code 13/11/2024
    Accessible Version : View(67 KB)
    Petition seeking Approval of Releasing of Additional 2000 kVA Load (Total Contracted Load of 12000 kVA) on a Supply Voltage Line of 33 kV and thereby Providing Relaxation Over Regulation 05/11/2024
    Accessible Version : View(62 KB)
    Suo-moto proceeding in the matter of Show-cause Notice dated 30.07.2024 under Section 142 of the Electricity Act, 2003 in the matter of Complaint filed by M/s Kashi Vishwanath Steels Pvt. Ltd. 05/11/2024
    Accessible Version : View(60 KB)
    Petition for determination of Project Specific Tariff for Kaliganga-II (2×2.25 MW) Small Hydro Power Station of UJVN Ltd. under Sections 62(1)(a) and 86(1)(a) of the Electricity Act 15/10/2024
    Accessible Version : View(102 KB)
    Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued. 04/10/2024
    Accessible Version : View(57 KB)
    Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued. 04/10/2024
    Accessible Version : View(57 KB)
    Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued. 04/10/2024
    Accessible Version : View(56 KB)
    Hon’ble APTEL’s Order dated 19.07.2024 on Appeal No. 215 of 2016 w.r.t. ‘Denial of 50% of the excess IDC and 50% of price variation component of capital cost for MB-II project. 27/09/2024
    Accessible Version : View(66 KB)
    Hon’ble APTEL’s Judgement dated 19.07.2024 on Appeal no. 215 of 2016 w.r.t. ‘Denial of 50% of the excess IDC and 50% of price variation component of capital cost for MB-II project’. 26/09/2024
    Accessible Version : View(69 KB)
    Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 28/08/2024
    Accessible Version : View(66 KB)
    Review Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC 20/08/2024
    Accessible Version : View(73 KB)
    Petition for review of the Commission’s Tariff Order dated 28.03.2024 on the Annual Revenue Requirement & Tariff Petition for FY 2024-25. 14/08/2024
    Accessible Version : View(97 KB)
    Application seeking review of the UERC’s Tariff Order on True-up for FY 2022- 23, Annual Performance Review for FY 2023-24, and Annual Fixed Charges for FY 2024-25. 30/07/2024
    Accessible Version : View(128 KB)
    Application seeking review of the UERC’s Tariff Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24, and Annual Fixed Charges for FY 2024-25. 23/07/2024
    Accessible Version : View(55 KB)
    Review Petition in the matter of order dated March 28, 2024 in Pet. No. 49 of 2023 of Power Transmission Corporation of Uttarakhand Limited for true up for FY 2022-23, Annual Performance Review 23/07/2024
    Accessible Version : View(54 KB)
    Petition filed under Regulation 9,20,58,59,61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 3.6 and chapter -8 Regulation 1 to 3 of UERC Supply Code Regulation 12/07/2024
    Accessible Version : View(80 KB)
    Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020. 12/07/2024
    Accessible Version : View(63 KB)
    Petition for fixation of voltage wise distribution loss or reduction of approved distribution loss for open access captive solar power plants under Uttarakhand State Solar Policy, 2023. 09/07/2024
    Accessible Version : View(97 KB)
    Petition under Section 61, 62 & 86 of the EA, 2003 read with Regulations 50(6) of the UERC (Terms & Conditions for Determination of MYT) Regulations, 2018 & 2021 09/07/2024
    Accessible Version : View(66 KB)
    Petition under Section 62 and 84 of the Electricity Act, 2003 read with Regulation 50(6) of the UERC (Terms and Conditions for Determination of MYT) Regulations, 2018 & 2021 for recovery 09/07/2024
    Accessible Version : View(63 KB)
    Investment Approval for DPR of “Establishment of NABL Accredited Oil Test Laboratory with associated office building and Transit hostel at 220 kV Substation, Ramnagar, Roorkee. 17/05/2024
    Accessible Version : View(76 KB)
    Suo-moto proceeding initiated by the Commission for non-compliance of Regulation 3.4.3(11) of UERC (The Electricity Supply Code, Release of new Connections and Related Matters) Regulations 17/05/2024
    Accessible Version : View(88 KB)
    Petition under Section 86(1)(f) and (e) of the Electricity Act, 2003 read with Regulation 49 of the UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources 03/04/2024
    Accessible Version : View(80 KB)
    Petition for resolution of matter pertaining to “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corp. 22/03/2024
    Accessible Version : View(102 KB)
    Petition for resolution of matter pertaining to “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corp. 22/03/2024
    Accessible Version : View(102 KB)
    Reconsideration/Review of Order dated 17.10.2023 passed by the Commission in Petition No. 30 of 2023. 01/02/2024
    Accessible Version : View(72 KB)
    Petition under Section 86(1)(f) of Electricity Act 2003, Regulation 59 of UERC (Conduct of Business) Regulations, 2014 and Regulation 103 & 104 of UERC (MYT) Regulations 25/01/2024
    Accessible Version : View(101 KB)
    Petition under Section 86(1) (e) and 86(1) (f) claiming deemed generation in respect of 12.6 MW Sarju II Smal Hydro Power Project of Uttar Bharat Hydro Power Private Limited. 06/10/2023
    Accessible Version : View(53 KB)
    Miscellaneous Petition challenging the Regulation No. 6.1 of the Uttarakhand Electricity Regulatory Commission (The Electricity Supply Code, Release of New Connections and Related Matters) 15/09/2023
    Accessible Version : View(57 KB)
    Suo-moto proceeding initiated by the Commission for non-compliance of Commission’s directions issued vide Commission’s Order dated 06.07.2022 & 20.07.2022 15/09/2023
    Accessible Version : View(69 KB)
    Petition filed by M/s Bhilangana Hydro Power Ltd., under Section 86 read with Section 181 of the Electricity Act, 2003 read with the Order dated 20.06.2023 07/08/2023
    Accessible Version : View(57 KB)
    Petition under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 50(6) of the Uttarakhand Electricity Regulatory Commission 01/08/2023
    Accessible Version : View(100 KB)
    Petition seeking to allow approximate cumulative capacity of 246.5 MW to be allotted to eligible applicants against ground mounted solar power plants having capacity size of 20/25/50/100/200 kW 03/07/2023
    Accessible Version : View(61 KB)
    Suo-moto proceedings in the matter of request for seeking approval of revised payment terms for release of gas payments. 31/05/2023
    Accessible Version : View(98 KB)
    Show Cause Notice-cum-Notice for Personal Hearing under Section 142 read with Section 149 of The Electricity Act, 2003, in the matter of non-compliance to Commission’s Orders 13/04/2023
    Accessible Version : View(74 KB)
    Petition for Investment Approvals of Transmission Projects under UTSDIP Scheme under ADB Funding for: (1) Establishment of NABL 13/04/2023
    Accessible Version : View(81 KB)
    Petition filed by UJVN Ltd. Under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity 18/01/2023
    Accessible Version : View(79 KB)
    Preconsider/Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for removal of difficulty and review of the Order dated 22.09.2021 03/01/2023
    Accessible Version : View(77 KB)
    Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid 03/01/2023
    Accessible Version : View(75 KB)
    Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of Section 59 of the Electricity Act, 2003 read with Regulation 5 of UERC (Standard of Performance)
    Accessible Version : View(53 KB)
    Application seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005 AND UPCL.
    Accessible Version : View(52 KB)
    Non-Compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated 11.04.2012 for FY 2012-13.
    Accessible Version : View(266 KB)
    Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.
    Accessible Version : View(45 KB)
    Petition filed by UJVN Ltd. for review of the Order on Approval of Business Plan and Multi Year Tariff for FY 2013-14 to FY 2015-16.
    Accessible Version : View(49 KB)
    Non-Compliance by Obligated Entities under UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations
    Accessible Version : View(62 KB)
    Filing of petition for re-determination of Generic Tariff for Pathri Small Hydro Generating Station (3×6.8 MW) & Mohammadpur Small Hydro Generating Station (3×3.1 MW) of UJVN Ltd.
    Accessible Version : View(70 KB)
    Petition under Section 86(1)(f) read with Section 142 of the Electricity Act, 2003 for Recovery of deemed generation charges from UPCL for the Financial Year 2012-2013 and Financial Year 2013-2014
    Accessible Version : View(69 KB)
    Proceeding initiated in the Commission’s Order dated 08.07.2014 under section 142 of the Electricity Act, 2003 for non-compliance of the provisions of the section 67 & 68 of the Electricity Act
    Accessible Version : View(51 KB)
    Petition to wave the token Penalty of Rs. 10,000/- imposed under Section 142 of the Electricity Act, 2003 for non compliance
    Accessible Version : View(44 KB)
    Petition seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.
    Accessible Version : View(63 KB)
    Petition with regard to Investment Approval for construction of well foundations and tower protection works at different locations of 220 kV DC Twin Zebra transmission line from 220 kV S/s Dehradun
    Accessible Version : View(46 KB)
    Petition seeking approval for the Investment on Dehradun Project covering the woks covered under Part-B of R-APDRP of MoP, GoI for reduction of AT&C losses to the extent of 15%.
    Accessible Version : View(62 KB)
    Petition seeking approval for Investment on SCADA/DMS Project of Dehradun town covered under Part-A of R-APDRP of MoP GoI.
    Accessible Version : View(60 KB)
    Petition for in-principle approval of Capital Expenditure for Balance Capital Works of 4×76 MW MB-II HEP of UJVN Ltd.
    Accessible Version : View(65 KB)
    Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015.
    Accessible Version : View(163 KB)
    Petition for prior approval of Capital investment for Renovation & Modernization of MB-I (3×30 MW) HEP of UJVN Ltd.
    Accessible Version : View(62 KB)
    Show cause notices dated 28.07.2014 issued to Sh. Kamal Kant, Chief Engineer (C&R) & Sh. A.K. Agarwal, Superintending Engineer (Engg.), PTCUL.
    Accessible Version : View(66 KB)
    Petition for approval of Capital investment for Refurbishing of Asan Barrage of UJVN Ltd. under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations
    Accessible Version : View(47 KB)
    Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. and UPCL in accordance with the provisions of UERC
    Accessible Version : View(174 KB)
    Application seeking approval of Hon’ble UERC for the investment on the projects covering the construction of 14 No. 33/11 kV Substation and their associated lines of 113.70 Km.
    Accessible Version : View(41 KB)
    Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access
    Accessible Version : View(52 KB)
    Notice under section 142 of the Electricity Act, 2003 in the matter of non-compliance of the provisions of Section 67 read with Section 12 of the Indian Electricity Act
    Accessible Version : View(44 KB)
    Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rule 2006 on the Order dated 20.05.2014 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand)
    Accessible Version : View(88 KB)
    Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015.
    Accessible Version : View(88 KB)
    Review petition filed under regulation 68 of the UERC(Conduct of Business Regulations,2004 for review of the order dated April10, 2014 passed by the UERC with respect to determination of tariff
    Accessible Version : View(48 KB)
    Petition for clarification on various issues for implementation of “Uttarakhand Grid Interacted Rooftop and Small SPV Power Plants Scheme”.
    Accessible Version : View(47 KB)
    Notice issued to MD, UPCL under Section 142 of the Electricity Act, 2003 in the matter of non-compliance of the Commission’s Order dated 24.06.2014 on the Review Petition
    Accessible Version : View(65 KB)
    Notice issued to MD, UPCL under Section 43(3) of the Electricity Act, 2003 in the matter of violation of the provisions of section 43(1) of the Electricity Act, 2003
    Accessible Version : View(56 KB)
    Petition for seeking carry forward of Renewable Purchase Obligation for FY 2013-14 amounting to 387.68 MU (Non-Solar) and 1.08 MU (Solar) as per the provisions of UERC
    Accessible Version : View(72 KB)
    Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View(113 KB)
    Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. And UPCL in accordance with the provisions of UERC
    Accessible Version : View(113 KB)
    Application seeking post facto approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01-07-2014 to 30-09-2014.
    Accessible Version : View(220 KB)
    Petition for seeking carry forward of Renewable Purchase Obligation for FY 2013-14 amounting to 387.68 MU (Non-Solar) and 1.08 MU (Solar) as per the provisions of UERC
    Accessible Version : View(70 KB)
    Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
    Accessible Version : View(153 KB)
    Application seeking approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Regency Yamuna Energy
    Accessible Version : View(151 KB)
    In the matter of: Filing of proposal for prior approval of “Capital Investment for Renovation & Modernization of 3 x 10 MW Kulhal HEP” of UJVN Ltd. under Section 61 and 86 of the Electricity Act
    Accessible Version : View(51 KB)
    Application under Section 42(2) of the Electricity Act, 2003 read with Regulation 58 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations
    Accessible Version : View(52 KB)
    In the matter of: Application seeking approval of the Commission for the investment on the project covering construction of 44.1 km, 33 kV line to connect 7 Nos. 33/11 kV
    Accessible Version : View(64 KB)
    Review Petition on the Commission’s Order dated 05.05.2014 under provisions of the Regulation 68 Regulation 74 of UERC (Conduct of Business) Regulations
    Accessible Version : View(71 KB)