Close

    Daily Orders

    Filter Document category wise
    Daily Orders
    Title Date View / Download
    A Miscellaneous Application has been filed by UJVN Ltd. under Sections 61, 62 and 86 of the Electricity Act, 2003 read with Regulations 50(6), 103(1), 104 and 105 in respect of Ramganga Hydro Power 14/10/2025
    Accessible Version : View(82 KB)
    A Miscellaneous Application has been filed by UJVN Ltd. under Sections 61, 62 and 86 of the Electricity Act, 2003 read with Regulations 50(6), 103(1), 104 and 105 in respect of Dhakrani and Khatima 14/10/2025
    Accessible Version : View(83 KB)
    Investment Approval for revised DPR of “Construction of proposed 220/132/33 kV S/s Raipur (Bhagwanpur), Roorkee along with construction of associated lines (220 kV D/C 14/10/2025
    Accessible Version : View(82 KB)
    Petition under Sections 86(1)(a) and 86(1)(b) read with Section 63 of the Electricity Act, 2003 and Rules 2(1)(c) & 3 of the Electricity (Timely Recovery of Costs due to Change in Law) Rules, 08/10/2025
    Accessible Version : View(107 KB)
    Application for Stay of the Order dated 13.05.2025 passed by the Commission in the Suo-moto proceedings in the matter of implementation of the APTEL’s Judgment dated 28.08.2024 06/10/2025
    Accessible Version : View(99 KB)
    Misc. Application filed by Shri Vikram Singh Chikara, Kuanwala, Near Soap Factory/Generator Factory, Dehradun pertaining to Shifting of Electric Line. 02/09/2025
    Accessible Version : View(58 KB)
    Petition seeking review of the Order dated 13th May, 2025 passed by the Commission in the Suo-moto proceedings in the matter of implementation of the Hon’ble APTEL’s Judgement dated 28.08.2024 06/08/2025
    Accessible Version : View(99 KB)
    Petition for review of the Commission’s Tariff Order dated 11.04.2025 on the Petitions of the Business Plan and Multi Year Tariff for Fifth Control Period from FY 2025-26 to FY 2027-28 05/08/2025
    Accessible Version : View(96 KB)
    Application seeking review of the UERC’s Tariff Order dated 11.04.2025 on Approval of Business Plan and Multi Year Tariff for Fifth Control Period (FY 2025-26 to 2027-28). 05/08/2025
    Accessible Version : View(59 KB)
    Review Petition filed under Section 94 of the Electricity Act, 2003 and the provisions of Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 against the Order dated 11.04.2025 31/07/2025
    Accessible Version : View(61 KB)
    Petition on behalf of the petitioners filed under Regulation 9 of the UERC (Conduct of Business Regulation), 2014 read with Regulations 50 & 59, Sec. 142 of the Electricity Act, 2003 and Sec. 12 11/07/2025
    Accessible Version : View(86 KB)
    Petition on behalf of the petitioners filed under Regulation 9 of the UERC (Conduct of Business Regulation), 2014 read with Regulations 59 & 66 and Order XXI of the Code of Civil Procedure, 1908 11/07/2025
    Accessible Version : View(86 KB)
    Application seeking review of the UERC’s Tariff Order dated 24.03.2025 on Approval of Capital Cost, True-up for FY 2022-23, and Annual Fixed Charges for FY 2024-25 for Vyasi Hydro Electric Project. 17/06/2025
    Accessible Version : View(54 KB)
    Petition seeking review of the Commission’s Order dated 27.03.2025, passed in the Suo-Moto proceedings regarding Extension requests for development and commissioning of Solar Power Plants allotted 17/06/2025
    Accessible Version : View(99 KB)
    Suo-moto proceeding initiated under the provisions of Section 142 read with Section 146 & Section 149 of the Electricity Act, 2003 in the matter of Non-compliance of the Commission’s directions 17/06/2025
    Accessible Version : View(101 KB)
    Petition seeking implementation of Clause 26-Taxes and Duties of UERC (Tariff and other Terms for supply of Electricity from Non-conventional & Renewable Energy Sources) Regulations, 2010 17/06/2025
    Accessible Version : View(112 KB)
    Hon’ble APTEL’s Order dated 24.03.2025 in Appeal No. 295 of 2018 in the matter of Appeal against the Commission’s Order dated 24.11.2017 in Petition No. 40 of 2017 (Suo-moto). 10/06/2025
    Accessible Version : View(98 KB)
    Suo-moto proceeding initiated by the Commission in the matter of Show Cause Notice under Section 142 of the Electricity Act, 2003, read with Regulation 3.3.2(4) of the UERC The Electricity Supply Code 10/06/2025
    Accessible Version : View(64 KB)
    Suo-moto proceeding initiated under the provisions of Section 142 read with Section 146 & Section 149 of the Electricity Act, 2003 in the matter of Non-compliance of the Commission’s directions 10/06/2025
    Accessible Version : View(120 KB)
    Application seeking review of the Tariff Order issued by the Commission on 11.04.2025 on the determination of AFC charges 06/06/2025
    Accessible Version : View(100 KB)
    Petition seeking review of the Commission’s Order dated 27.03.2025, passed in the Suo-Moto proceedings regarding Extension requests 06/06/2025
    Accessible Version : View(101 KB)
    Petition for seeking prior approval of Capital investment for Augmentation of transformer capacity of 132 kV/33 kV substation of Sharda Power House. 20/05/2025
    Accessible Version : View(57 KB)
    Petition seeking review of the Commission’s Order dated 27.03.2025, passed in the Suo-Moto proceedings regarding Extension requests for development and commissioning of Solar Power Plants allotted. 13/05/2025
    Accessible Version : View(99 KB)
    Petition under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003, read with Regulation 59(1) of The UERC (Conduct of Business) Regulations 2014 and the “Guidelines for Procurement of. 06/05/2025
    Accessible Version : View(100 KB)
    Filing of Miscellaneous Petition u/s 181(1) r/w Section 181(2)(zp) r/w Section 94(1)(f) of the Indian Electricity Act, 2003, seeking relaxation of Clause 2.1(4) of the UERC 29/04/2025
    Accessible Version : View(61 KB)
    Filing of Miscellaneous Petition u/s 181(1) r/w Section 181(2)(zp) r/w Section 94(1)(f) of the Indian Electricity Act, 2003, seeking relaxation of Clause 2.1(4) of the UERC (the Electricity Supply. 29/04/2025
    Accessible Version : View(100 KB)
    Petition regarding permission to install GRPV Plant beyond 1.0 MW limit set by the Commission with Net Metering facility by UPCL. AND 27/02/2025
    Accessible Version : View(97 KB)
    Application under Regulation 59(1) of the UERC (Conduct of Business) Regulations, 2014, Section 94, Section 64 and Section 86(1)(f) & (k) of the Electricity Act, 2003, 14/02/2025
    Accessible Version : View(106 KB)
    Application filed by M/s Galwalia Ispat Udyog Pvt. Ltd and M/s Kumaon Garhwal Chamber of Commerce & Industry (KGCCI) seeking review of Commission’s Order dated 30.09.2024 21/01/2025
    Accessible Version : View(45 KB)
    Suo-moto proceedings w.r.t. implementation of Hon’ble APTEL’s Judgement dated 28.08.2024 in Appeal No. 100 of 2017 and Appeal No. 389 of 2018. 17/12/2024
    Accessible Version : View(100 KB)
    Suo-moto proceeding in the matter of Show Cause Notice under Section 142 of the Electricity Act, 2003, read with Regulation 3.3.2(4) of the UERC (The Electricity Supply Code 13/11/2024
    Accessible Version : View(67 KB)
    Petition seeking Approval of Releasing of Additional 2000 kVA Load (Total Contracted Load of 12000 kVA) on a Supply Voltage Line of 33 kV and thereby Providing Relaxation Over Regulation 05/11/2024
    Accessible Version : View(62 KB)
    Suo-moto proceeding in the matter of Show-cause Notice dated 30.07.2024 under Section 142 of the Electricity Act, 2003 in the matter of Complaint filed by M/s Kashi Vishwanath Steels Pvt. Ltd. 05/11/2024
    Accessible Version : View(60 KB)
    Petition for determination of Project Specific Tariff for Kaliganga-II (2×2.25 MW) Small Hydro Power Station of UJVN Ltd. under Sections 62(1)(a) and 86(1)(a) of the Electricity Act 15/10/2024
    Accessible Version : View(102 KB)
    Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued. 04/10/2024
    Accessible Version : View(57 KB)
    Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued. 04/10/2024
    Accessible Version : View(57 KB)
    Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued. 04/10/2024
    Accessible Version : View(56 KB)
    Hon’ble APTEL’s Order dated 19.07.2024 on Appeal No. 215 of 2016 w.r.t. ‘Denial of 50% of the excess IDC and 50% of price variation component of capital cost for MB-II project. 27/09/2024
    Accessible Version : View(66 KB)
    Hon’ble APTEL’s Judgement dated 19.07.2024 on Appeal no. 215 of 2016 w.r.t. ‘Denial of 50% of the excess IDC and 50% of price variation component of capital cost for MB-II project’. 26/09/2024
    Accessible Version : View(69 KB)
    Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 28/08/2024
    Accessible Version : View(66 KB)
    Petition for seeking Removal of Difficulty in Implementation of Modified Time of Day Metering as provided in Clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23. 24/08/2024
    Accessible Version : View(54 KB)
    Review Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC 20/08/2024
    Accessible Version : View(73 KB)
    Petition for review of the Commission’s Tariff Order dated 28.03.2024 on the Annual Revenue Requirement & Tariff Petition for FY 2024-25. 14/08/2024
    Accessible Version : View(97 KB)
    Application seeking review of the UERC’s Tariff Order on True-up for FY 2022- 23, Annual Performance Review for FY 2023-24, and Annual Fixed Charges for FY 2024-25. 30/07/2024
    Accessible Version : View(128 KB)
    Application seeking review of the UERC’s Tariff Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24, and Annual Fixed Charges for FY 2024-25. 23/07/2024
    Accessible Version : View(55 KB)
    Review Petition in the matter of order dated March 28, 2024 in Pet. No. 49 of 2023 of Power Transmission Corporation of Uttarakhand Limited for true up for FY 2022-23, Annual Performance Review 23/07/2024
    Accessible Version : View(54 KB)
    Petition filed under Regulation 9,20,58,59,61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 3.6 and chapter -8 Regulation 1 to 3 of UERC Supply Code Regulation 12/07/2024
    Accessible Version : View(80 KB)
    Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020. 12/07/2024
    Accessible Version : View(63 KB)
    Petition for fixation of voltage wise distribution loss or reduction of approved distribution loss for open access captive solar power plants under Uttarakhand State Solar Policy, 2023. 09/07/2024
    Accessible Version : View(97 KB)
    Petition under Section 61, 62 & 86 of the EA, 2003 read with Regulations 50(6) of the UERC (Terms & Conditions for Determination of MYT) Regulations, 2018 & 2021 09/07/2024
    Accessible Version : View(66 KB)
    Petition under Section 62 and 84 of the Electricity Act, 2003 read with Regulation 50(6) of the UERC (Terms and Conditions for Determination of MYT) Regulations, 2018 & 2021 for recovery 09/07/2024
    Accessible Version : View(63 KB)
    Investment Approval for DPR of “Establishment of NABL Accredited Oil Test Laboratory with associated office building and Transit hostel at 220 kV Substation, Ramnagar, Roorkee. 17/05/2024
    Accessible Version : View(76 KB)
    Suo-moto proceeding initiated by the Commission for non-compliance of Regulation 3.4.3(11) of UERC (The Electricity Supply Code, Release of new Connections and Related Matters) Regulations 17/05/2024
    Accessible Version : View(88 KB)
    Petition under Section 86(1)(f) and (e) of the Electricity Act, 2003 read with Regulation 49 of the UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources 03/04/2024
    Accessible Version : View(80 KB)
    Petition for resolution of matter pertaining to “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corp. 22/03/2024
    Accessible Version : View(102 KB)
    Petition for resolution of matter pertaining to “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corp. 22/03/2024
    Accessible Version : View(102 KB)
    Reconsideration/Review of Order dated 17.10.2023 passed by the Commission in Petition No. 30 of 2023. 01/02/2024
    Accessible Version : View(72 KB)
    Petition under Section 86(1)(f) of Electricity Act 2003, Regulation 59 of UERC (Conduct of Business) Regulations, 2014 and Regulation 103 & 104 of UERC (MYT) Regulations 25/01/2024
    Accessible Version : View(101 KB)
    Petition under Section 86(1) (e) and 86(1) (f) claiming deemed generation in respect of 12.6 MW Sarju II Smal Hydro Power Project of Uttar Bharat Hydro Power Private Limited. 06/10/2023
    Accessible Version : View(53 KB)
    Miscellaneous Petition challenging the Regulation No. 6.1 of the Uttarakhand Electricity Regulatory Commission (The Electricity Supply Code, Release of New Connections and Related Matters) 15/09/2023
    Accessible Version : View(57 KB)
    Suo-moto proceeding initiated by the Commission for non-compliance of Commission’s directions issued vide Commission’s Order dated 06.07.2022 & 20.07.2022 15/09/2023
    Accessible Version : View(69 KB)
    Petition filed by M/s Bhilangana Hydro Power Ltd., under Section 86 read with Section 181 of the Electricity Act, 2003 read with the Order dated 20.06.2023 07/08/2023
    Accessible Version : View(57 KB)
    Petition under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 50(6) of the Uttarakhand Electricity Regulatory Commission 01/08/2023
    Accessible Version : View(100 KB)
    Petition seeking to allow approximate cumulative capacity of 246.5 MW to be allotted to eligible applicants against ground mounted solar power plants having capacity size of 20/25/50/100/200 kW 03/07/2023
    Accessible Version : View(61 KB)
    Suo-moto proceedings in the matter of request for seeking approval of revised payment terms for release of gas payments. 31/05/2023
    Accessible Version : View(98 KB)
    Show Cause Notice-cum-Notice for Personal Hearing under Section 142 read with Section 149 of The Electricity Act, 2003, in the matter of non-compliance to Commission’s Orders 13/04/2023
    Accessible Version : View(74 KB)
    Petition for Investment Approvals of Transmission Projects under UTSDIP Scheme under ADB Funding for: (1) Establishment of NABL 13/04/2023
    Accessible Version : View(81 KB)
    Petition filed by UJVN Ltd. Under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity 18/01/2023
    Accessible Version : View(79 KB)
    Preconsider/Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for removal of difficulty and review of the Order dated 22.09.2021 03/01/2023
    Accessible Version : View(77 KB)
    Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid 03/01/2023
    Accessible Version : View(75 KB)
    Review/Reconsideration Petition filed by PTCUL under Regulation 54, 59 and 62 of the UERC (Conduct of Business) Regulations, 2014 r/w relevant provisions of Electricity Act 2003 23/12/2022
    Accessible Version : View(76 KB)
    Petition seeking approval for increasing the Continuous Supply Surcharge as approved by the Commission in the Tariff Order dated 31.03.2022 for FY 2022-23. 14/10/2022
    Accessible Version : View(54 KB)
    Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant 27/09/2022
    Accessible Version : View(76 KB)
    Unplanned and irregular load shedding/curtailment of power by Uttarakhand Power Corporation Limited during the period 01st of March 2022 to 30th June 2022 and being continued till date. 24/08/2022
    Accessible Version : View(57 KB)
    Revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31.03.2022 for FY 2022-23. 24/08/2022
    Accessible Version : View(55 KB)
    Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 (“Electricity Act”) read with Regulation 54 of the UERC (Conduct of Business) Regulations 23/08/2022
    Accessible Version : View(99 KB)
    Petition seeking grant of permission to connect 33 kV dedicated line from 15 MW Captive Solar Power Plant to the stepdown side of 132/33 kV switchyard of Kashi Vishwanath Steels Pvt. Ltd. 27/07/2022
    Accessible Version : View(63 KB)
    Compliance of Reports/Plans/Procedures by the Distribution Licensee as per the UERC (Distribution Code) regulations, 2018. 22/06/2022
    Accessible Version : View(70 KB)
    Suo-moto proceeding initiated under Section 142 and Section 146 read with Section 149 of The Electricity Act, 2003 in the matter of violation of Section 12(b) of the Electricity Act 22/06/2022
    Accessible Version : View(118 KB)
    Petition for review of the Commission’s Tariff Order dated 31.03.2022 on the ARR & Tariff Petition for FY 2022-23 filed by UPCL. 07/06/2022
    Accessible Version : View(97 KB)
    Applicability of Rate Schedule RTS-4A: Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017 (UPCL Vs. UERC & M/s Flex Foods Ltd.). 20/05/2022
    Accessible Version : View(99 KB)
    Petition for issuing necessary directions to UPCL to withdraw invoices issued against the Petitioner imposing 25% additional Temporary Supply Tariff and issue 04/05/2022
    Accessible Version : View(98 KB)
    Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP for evacuating power from generating stations operating in Ravi Basin 19/04/2022
    Accessible Version : View(106 KB)
    Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar generating project of the Petitioner. 19/04/2022
    Accessible Version : View(99 KB)
    Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar generating project of the Petitioner. 19/04/2022
    Accessible Version : View(98 KB)
    Petition seeking extension of Control Period of the Benchmark Capital Cost & Generic Tariff as declared by the Commission vide its Orders dated 11.05.2020, 30.09.2020 and 05.10.2020 till March 19/04/2022
    Accessible Version : View(99 KB)
    Miscellaneous Petition, inter alia amongst other grounds concerning refund of MDC/LPS charges by illegal disconnection and for determining whether Minimum Demand Charges 11/03/2022
    Accessible Version : View(75 KB)
    Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity 11/03/2022
    Accessible Version : View(79 KB)
    Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021 23/02/2022
    Accessible Version : View(58 KB)
    Suo-moto proceedings initiated by the Commission in the matter of Noncompliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the UERC 23/02/2022
    Accessible Version : View(57 KB)
    Petition under Section 79 of the Electricity Act, 2003, read with Article 13 (“Change in Law”) of the Power Purchase Agreement (“PPA”) dated 19.03.2012 executed between M/s Uttam Sugar Mills Ltd 30/11/2021
    Accessible Version : View(98 KB)
    Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from Generating Stations operating in Ravi Basin 16/11/2021
    Accessible Version : View(107 KB)
    Petition to Hon’ble Commission for resolution of matter pertaining to Deviation Settlement Mechanism (“DSM”) Claim for 214 MW (225 MW ISO) for Phase I of 2×225 MW 12/10/2021
    Accessible Version : View(65 KB)
    Review Petition for review of the Order dated 11.06.2021 passed by the Commission in Petition No. 21 of 2020 in accordance with Section 94(f) of the Electricity Act 21/09/2021
    Accessible Version : View(100 KB)
    Hon’ble APTEL’s Judgement dated 02.03.2020 in Appeal No. 18 of 2016. 14/09/2021
    Accessible Version : View(74 KB)
    Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. in terms of the directions contained in Order of the Commission 07/09/2021
    Accessible Version : View(100 KB)
    Hon’ble APTEL’s Judgement dated 02.03.2020 in Appeal No. 18 of 2016. 28/07/2021
    Accessible Version : View(77 KB)
    Petition under Section 86(1) (c), (f) and (k) read with Section 30, Section 39(2) (c), Section 40(a) and Section 42(1) of Electricity Act, 2003 seeking directions 15/06/2021
    Accessible Version : View(76 KB)
    Petition under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 1(3), 11(1) and 12 of the Uttarakhand Electricity Regulatory Commission 23/03/2021
    Accessible Version : View(99 KB)