    In the matter of:
    Deployment of customised Renewable Purchase Obligation Compliance System (RPOCS) Web Tool in Uttarakhand.
    english pdf

    22.11.2018

    In the matter of:
    Dispute between M/s Bhilangana Hydro Power Limited and Power Transmission Corporation of Uttarakhand Limited, regarding Late Payment Surcharge against payment of transmission charges for the alleged dedicated transmission network.
    AND
    In the matter of:
    M/s Bhilangana Hydro Power Limited. ….....…Petitioner
    AND
    In the matter of:
    Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) ……....Respondent
    english pdf

    09.11.2018

    In the matter of:
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2018 to 31.12.2018.
    In the matter of
    Uttarakhand Power Corporation Ltd. … Petitioner
    english pdf

    31.10.2018

    In the matter of:
    Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Mittal Processors (P) Ltd. (MPPL), M/s PTC India Ltd., M/s Tata Power Trading Company Ltd. (TPTCL), M/s Sembcorp Gayatri Power Ltd. (SGPL) and M/s GMR Energy Trading Ltd.
    In the matter of:
    Uttarakhand Power Corporation Ltd. … Petitioner
    And in the matter of
    M/s Mittal Processors (P) Ltd.
    M/s PTC India Ltd.
    M/s Tata Power Trading Company Ltd.
    M/s Sembcorp Gayatri Power Ltd.
    M/s GMR Energy Trading Ltd. … Respondents
    english pdf

    26.10.2018

    In the matter of: Petition No. 34 of 2018
    Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Aglar Power Ltd. for Rayat SHP.
    Petition No. 35 of 2018 In the matter of:
    Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Aglar Power Ltd. for Lagrasu SHP.
    In the matter of:
    Uttarakhand Power Corporation Limited …Petitioner
    In the matter of:
    M/s Aglar Power Ltd. for Rayat SHP and Lagrasu SHP ……Respondent
    english pdf

    24.09.2018

    In the matter of:
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2018 to 30.09.2018.
    In the matter of:
    Uttarakhand Power Corporation Ltd. … Petitioner
    english pdf

    17.09.2018

    In the matter of:
    Petition under section 94(1)(f) of the Electricity Act, 2003 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 17.05.2018 passed by the Commission in the Petition filed by M/s Him Urja Pvt. Ltd. seeking adjustment of tariff.
    In the matter of:
    M/s Him Urja (P) Ltd. …Petitioner
    In the matter of:
    Uttarakhand Power Corporation Ltd. … Respondent
    english pdf

    13.09.2018

    In the matter of:
    Suo-moto proceedings in the matter of Show Cause Notice issued to PTCUL under the provisions of Section 142 read with Section 149 of the Electricity Act, 2003, relating to construction of 132 kV line for M/s Gold Plus Glass Industry Ltd., Roorkee.
    In the matter of:
    Power Transmission Corporation of Uttarakhand Limited (PTCUL)
    Uttarakhand Power Corporation Limited (UPCL)
    M/s Gold Plus…………Respondents
    english pdf

    12.09.2018

    In the matter of:
    Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 kV Substation & its 0.60 Km associated 66 kV line.
    In the matter of:
    Uttarakhand Power Corporation Limited. (UPCL), VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …Petitioner.

    Managing Director, Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun.
    Managing Director, UJVN Limited, "UJJWAL", Maharani Bagh, GMS Road, Dehradun. ...Respondents.
    english pdf

    29.08.2018

    In the matter of:
    Application seeking permission to setup Solar Power Plant of capacity 40 MW at Haripura Dam (27.34 MW) and Tumaria Dam (13.50 MW) in District Udham Singh Nagar, Uttarakhand, on Net Metering basis for captive consumption by Department of Irrigation, Government of Uttarakhand.
    the matter of: Irrigation Department, GoUK … Petitioner
    In the matter of:
    Uttarakhand Power Corporation Ltd.
    Uttarakhand Renewable Energy Development Agency (UREDA) … Respondents
    english pdf

    28.08.2018

    In the matter of:
    Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. (TPTCL), M/s NTPC Vidyut Vyapar Nigam Ltd. (NTPC VVN Ltd.) and M/s PTC India Ltd.
    In the matter of:
    Uttarakhand Power Corporation Ltd. … Petitioner
    In the matter of:

    M/s Tata Power Trading Company Ltd.
    M/s PTC India Ltd.
    M/s NTPC Vidyut Vyapar Nigam Ltd. … Respondents
    english pdf

    28.08.2018

    In the matter of:
    Application seeking approval of the Commission on the Power Purchase Agreement executed between Uttarakhand Power Corporation Limited and Uttarakhand Renewable Energy Development Agency (for 10 nos. of Small Hydro Power Plants).
    In the matter of:
    Uttarakhand Power Corporation Ltd. … Petitioner
    In the matter of:
    Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent
    english pdf

    21.08.2018

    In the matter of:
    Petition seeking determination of project specific tariff for 12.6 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Nonconventional and Renewable Energy Sources) Regulations, 2013.
    In the matter of:
    Uttar Bharat Hydro Power Pvt. Ltd. …Petitioner
    In the matter of:
    Uttarakhand Power Corporation Ltd. …Respondent
    english pdf

    14.08.2018

    In the matter of:
    Application seeking relaxation in UERC (The Electricity Supply Code) Regulations 2007 and in UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.
    In the matter of:
    Uttarakhand Power Corporatin Ltd.
    Victoria Cross Vijeta Gabar Singh Urja Bhawan,
    english pdf

    13.08.2018

    In the matter of:
    Review Petition on the Commission’s Order dated 21.03.2018 on "True-Up of FY 2016-17, ARR for FY 2017-18 and AFC for FY 2018-19 for UJVN Ltd."
    In the matter of:
    UJVN Ltd., "UJJWAL", Maharani Bagh, GMS Road, Dehradun …Petitioner
    english pdf

    13.08.2018

    In the matter of:
    Petition for review of the Commission’s Order dated 21.03.2018 on True up for FY 2016-17, Annual Performance Review for FY 2017-18 and Annual Revenue Requirement for FY 2018-19.
    In the matter of:
    Uttarakhand Power Corporation Ltd. …Petitioner
    english pdf

    07.08.2018

    In the matter of:
    Petition seeking approval of the Commission for advance banking of power with M/s PTC India Limited, M/s Mittal Processors (P) Ltd and M/s Arunachal Pradesh Power Corporation Pvt. Ltd. under a banking arrangement with the Uttarakhand Power Corporation Ltd.
    In the matter of:
    Uttarakhand Power Corporation Ltd. … Petitioner
    In the matter of:

    M/s PTC India Ltd.
    M/s Arunachal Pradesh Power Corporation Pvt. Ltd.
    M/s Mittal Processors (P) Ltd. … Respondents
    english pdf

    06.08.2018

    In the matter of:
    Suo-Moto proceedings initiated by the Commission against non-compliance by UPCL of the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 and directions issued by the Commission vide Order dated 15.09.2017 regarding procurement of unmet Solar and Non-Solar RPO for FY 2016-17 alongwith the RPO for FY 2017-18 latest by March, 2018.
    In the matter of:
    Sh. B. C. K. Mishra Managing Director, Uttarakhand Power Corporation Ltd., Dehradun. …Respondent
    english pdf

    23.07.2018

    In the matter of:
    Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power Trading Company Ltd. for procuring Non-Solar RE Energy on short term basis.
    In the matter of:
    Uttarakhand Power Corporation Limited … Petitioner
    In the matter of:
    M/s Tata Power Trading Company Ltd. …Respondent
    english pdf

    12.07.2018

    In the matter of:
    Petition filed under Section 86(1)(f) of the Electricity Act, 2003 read with Article 23 of the PPAs, seeking payment of outstanding dues from Uttarakhand Power Corporation Limited for the common evacuation infrastructure constructed for 4x12.5 MW solar projects of ACME Solar Holdings Private Limited, in terms of the power purchase agreements executed between the parties.

    In the matter of:
    M/s ACME Solar Holdings (P) Ltd.
    M/s Devishi Solar Power (P) Ltd.
    M/s Devishi Renewable Energy (P) Ltd.
    M/s Eminent Solar Power (P) Ltd.
    M/s Sunworld Energy (P) Ltd. … Petitioners
    In the matter of:
    Uttarakhand Power Corporation Ltd. (UPCL)
    Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) … Respondents
    english pdf

    28.06.2018

    In the matter of:
    Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Manikaran Power Limited, M/s Tata Power Trading Company Ltd. & M/s PTC India Ltd. for procuring Non-Solar RE Energy on short term basis.
    In the matter of:
    Uttarakhand Power Corporation Limited … Petitioner
    In the matter of:

    M/s. Tata Power Trading Company Ltd.
    M/s PTC India Ltd.
    M/s Manikaran Power Ltd. …Respondents
    english pdf

    27.06.2018

    In the matter of:
    Application under Regulation 50 of the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013.
    In the matter of:

    M/s Distributed Solar Power Association
    M/s Amplus Solar Power Pvt. Ltd. … Petitioner
    In the matter of:
    Uttarakhand Power Corporation Ltd.
    Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent
    english pdf

    20.06.2018

    In the matter of:
    Petition seeking clarification with regard to the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013 or, in the alternative, a specific order of relaxation or permission for establishment of a grid interactive roof-top solar plant with installed solar capacity of 3600 KW on captive consumption basis by M/s Amplus Solar Power Pvt. Ltd. and M/s Asahi India Glass Ltd.
    In the matter of:

    M/s Amplus Solar Power Pvt. Ltd.
    M/s Asahi India Glass Ltd. … Petitioners
    In the matter of:
    Uttarakhand Power Corporation Ltd.
    Uttarakhand Renewable Energy Development Agency (UREDA) … Respondents
    english pdf

    20.06.2018

    In the matter of:
    Application seeking amendment in UERC (The Electricity Supply Code) Regulations, 2007.
    In the matter of:
    Uttarakhand Power Corporation Limited. (UPCL),
    Victoria Cross Vijeyta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …...Petitioner
    english pdf

    19.06.2018

    In the matter of:
    Petition for submission of Draft Metering Communication & Data Acquisition Requirements (MCDAR) for Intra-State Transmission System of Uttarakhand developed in pursuance to Regulation 8.1 of UERC (State Gird Code) Regulations, 2016 and Regulation 10 of UERC (Conduct of Business) Regulations, 2014 for approval of the Commission.
    In the matter of:
    Power Transmission Corporation of Uttarakhand Ltd., ‘Vidyut Bhawan’, Majra, Dehradun....Petitioner.
    english pdf

    15.06.2018

    In the matter of:
    Suo-moto proceedings in the matter of request made by Mr. Digambar Singh Bisht for issuance of appropriate directions for releasing Grant/Subsidy sanctioned by Central Government, payment in accordance with solar Tariff fixed for FY 2015-16 and immediate grid connectivity for allocated solar power plant to Mr. Digambar Singh Bisht.
    In the matter of:

    Mr. Digambar Singh Bisht ("Developer")
    Uttarakhand Power Corporation Ltd. ("UPCL")
    Uttarakhand Renewable Energy Development Agency ("UREDA") … Respondents
    english pdf

    15.06.2018

    In the matter of:
    Suo-moto proceedings in the matter of request made by Mr. Dhirendra Singh Rawat for issuance of appropriate directions to release Grant/Subsidy sanctioned by Central Government and payment in accordance with solar Tariff fixed for FY 2015-16 for supply of solar energy from allocated grid connected Solar Rooftop power plant.
    In the matter of:

    Mr. Dhirendra Singh Rawat ("Developer")
    Uttarakhand Power Corporation Ltd. ("UPCL" Uttarakhand Renewable Energy Development Agency ("UREDA") … Respondents
    english pdf

    29.05.2018

    In the matter of:
    Suo-moto proceedings in the matter of applicability of tariff for the purpose of incentive on account of revised O&M norms in UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013 and UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations), 2010.
    english pdf

    21.05.2018

    In the matter of:
    Approval for the Capital Investment on the Implementation of Phase-II of IT enablement projects under Integrated Power Development Scheme (IPDS), Ministry of Power (MoP), Government of India (GoI).
    In the Matter of:
    Uttarakhand Power Corporation Limited. (UPCL), Victoria Cross Vijeyta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …...Petitioner
    english pdf

    17.05.2018

    In the matter of:
    Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 14 & 15 of UERC (Tariff and Other Terms for supply of Electricity from Renewable Energy Sources and Non fossil fuel based Co- generating Stations) Regulations, 2010, as amended from time to time seeking revision of tariff.
    In the matter of:
    M/s Him Urja Pvt. Ltd. … Petitioner
    In the matter of:
    Uttarakhand Power Corporation Ltd. … Respondent
    english pdf

    12.04.2018

    In the matter of:
    Suo-moto proceedings initiated by the Commission on the representation of M/s India Glycols Ltd. regarding illegal demand of Cross Subsidy from Medium Term Open Access (MTOA) consumers by UPCL.
    In the matter of
    M/s India Glycols Ltd., A-1, Industrial Area Bazpur Road, Kashipur. .…..Respondent No. 1
    M/s Hindustan National Glass Ltd. Malviya Nagar, Virbhadra Rishikesh. .…..Respondent No. 2
    M/s Ester India Ltd. Sohan Nagar, Charubeta, Khatima, U.S. Nagar. …..Respondent No. 3
    Uttarakhand Power Corporation Limited (UPCL). …..Respondent No. 4
    english pdf

    02.04.2018

    In the matter of:
    Application seeking approval on the Surcharge Waiver Scheme for the Domestic, Non-domestic, Private Tubewell and L.T. Industry Category Consumers.
    In the matter of:
    Uttarakhand Power Corporation Ltd. … Petitioner
    english pdf

    Date of order 23.03.2018

    In the matter of:
    Petition filed under Regulation 13 of UERC (Deviation Settlement Mechanism and related matters) Regulations, 2017 for seeking relaxation of one year in Regulation 1(2) for implementation of Intra State ABT and Deviation Settlement Mechanism.
    In the matter of:
    b> State Load Despatch Centre (SLDC), Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun. …….…...Petitioner
    In the matter of:

    1. Uttarakhand Power Corporation Ltd. (UPCL), Victoria Cross Vijeta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun
    Power Transmission Corporation of Uttarakhand Ltd. (PTCUL), Vidyut Bhawan, Majra, Dehradun
    UJVN Ltd., “UJJWAL”, Maharani Bag, GMS Road, Dehradun.
    Uttarakhand Renewable Energy Development Agency (UREDA), Urja Park Campus, Industrial Area, Patel Nagar, Dehradun.
    & Others. ……...Respondents
    english pdf

    23.03.2018

    In the matter of:
    Petition seeking approval for increase in existing transaction charges per electricity bill, collected by VLEs (Village Level Entrepreneurs) through M/s CSC e-Governance Service India Ltd and introduction of incentive scheme to VLEs.
    In the matter of:
    Uttarakhand Power Corporatin Ltd., Victoria Cross Vijeta Gabar Singh Urja Bhawan, Kanwali Road, Dehraudn ………Petitioner
    english pdf

    13.03.2018


    In the matter of:
    Petition for approval of "Additional Capital Works amounting to Rs. 44.05 Crore of 4X76 MW Maneri Bhali-II HEP".
    In the matter of:
    UJVN Ltd., "UJJWAL", Maharani Bagh, G.M.S, Road, Dehradun. …………Petitioner
    english pdf

    13.03.2018

    In the matter of:
    Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2018 to 31.03.2018.
    In the matter of:
    Uttarakhand Power Corporation Ltd. … Petitioner
    english pdf

    08.03.2018

    In the matter of:
    Approval of Capital Investments under Para 11 of the Transmission Licence for laying of OPGW cable under the project "Reliable Communication & Data Acquisition System for 132 kV & above Substations" in PTCUL under PSDF Scheme. And In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …...Petitioner
    english pdf
    Date of order 23.01.2018
    In the matter of:
    Application seeking approval of the Power Purchase Agreement between M/s Himalaya Hydro Pvt. Ltd. and Uttarakhand Power Corporation Ltd.
    In the matter of:
    M/s Himalaya Hydro Pvt. Ltd. …Petitioner
    In the matter of:
    Uttarakhand Power Corporation Limited. …Respondent
    english pdf

    17.01.2018

    In the matter of:
    Show cause Notice-cum-Notice for Personal Hearing issued to MD, UPCL in the matter of  Non-compliance of sub-Regulation 14 of Regulation 5 & sub-Regulation 15 of Regulation 5 of UERC (Release of new LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.
    In the matter of:
    Managing Director, Uttarakhand Power Corporation of Ltd. (UPCL) ...Respondent
    english pdf

    04.01.2018

    In the matter of:
    Hon’ble ATE Judgment dated 14.11.2017 in Appeal No. 285 of 2016 & IA No. 585 of 2016 setting aside the Commission’s Order dated 20.09.2016 and remand back of the matter to the Commission to consider the case of the Appellant on merits independently and in accordance with law.
    In the matter of:
    M/s Dans Energy Pvt. Ltd. .... Petitioner
    In the matter of:
    Uttarakhand Power Corporation Ltd. …Respondent
    english pdf