Application seeking approval of the Fuel and Power Purchase Cost Adjustment (FPPCA) charged from/refunded to the consumers against the incremental power purchase cost.
|
05/22/25 |
(227 KB)
|
Petition for seeking prior approval of capital investment for Augmentation of transformer capacity of 132 /33 kV substation of Sharda Power House
|
06/06/25 |
(262 KB)
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Arunachal Pradesh Power Corporation Pvt. Ltd.
|
05/20/25 |
(166 KB)
|
Petition for Investment Approval for Revised DPR of “Procurement of 500 MVA 400/220 kV transformer along with NIFPES & construction of 400 kV and 220 kV (AIS) bays.
|
05/19/25 |
(152 KB)
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd.
|
05/20/25 |
(166 KB)
|
Filing of Miscellaneous Petition u/s 181(1) r/w Section 181(2)(zp) r/w Section 94(1)(f) of the Indian Electricity Act, 2003, seeking relaxation of Clause 2.1(4)
|
05/15/25 |
(240 KB)
|
Application seeking approval of the Commission for deviation/modification and/or clarification in specific clauses of the bidding documents (RFQ, RFP, and APP) issued for procurement of 500 MW RTC.
|
05/15/25 |
(172 KB)
|
Suo-moto proceedings in the matter of implementation of Hon’ble APTEL’s Judgement dated 28.08.2024 in Appeal No. 100 of 2017 and Appeal no. 389 of 2018..
|
05/13/25 |
(355 KB)
|
Petition under Section 61, 62 & 86 of the EA, 2003 read with Regulation 50(6) of the UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2018 & 2021
|
05/09/25 |
(310 KB)
|
Application seeking approval of the Commission for deviation/modification and/or clarification in specific clauses of the RFQ issued for procurement of 1320 MW RTC coal-based power under Long-Term.
|
05/09/25 |
(133 KB)
|
Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued.
|
05/08/25 |
(208 KB)
|
Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued.
|
05/08/25 |
(171 KB)
|
Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued.
|
05/08/25 |
(209 KB)
|
Application seeking approval of the Commission on Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Rai Bahadur Narain Singh Sugar Mills Ltd. – 30 MW (Surplus 19.1 MW
|
04/30/25 |
(131 KB)
|
Application seeking approval for the investment on the following projects: (1) Construction of 33/11 kV Substation alongwith its associated 33 kV line at Kathgodam, Haldwani, District-Nainital.
|
04/30/25 |
(297 KB)
|
Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 KV Substation & 0.60 Km 66 KV Line and 02 No. 33/11 KV Substations
|
|
(156 KB)
|
Clarification Petition under Regulation 59 and 61 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 and Regulation 103, 104 and 105 of MYT Regulations
|
|
(497 KB)
|
Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on Open Access Power Purchased.
|
|
(102 KB)
|
Suo-moto proceedings in the matter of application seeking revision of tariff of Mohammadpur and Pathri SHPs of UJVN Ltd. determined by the Commission vide its Order dated 30.11.2016 & 25.05.2017
|
|
(413 KB)
|
Petition filed under Regulation 59 and 39 of the UERC (Conduct of Business Regulations), 2014 and Regulation 55A, 103, 104 & 105 of MYT Regulation 2015
|
|
(502 KB)
|
Investment Approval of revised DPR of under Construction 220 kV Piran Kaliyar-Puhana (PGCIL) double circuit Line on double circuit Towers.
|
|
(126 KB)
|
Suo-moto proceedings in the matter of non-compliance of Commission’s direction issued vide order dated 16.05.2017 regarding the finalization of Station Heat Rate
|
|
(314 KB)
|
Suo-moto proceedings in the matter of application under Section 62 and 86 of Electricity Act, 2003 seeking modification of the project specific tariff of 10.5 MW Sarju III SHP
|
|
(379 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2017 to 31.12.2017
|
|
(456 KB)
|
Application seeking approval of the Commission on the bulk Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s UJVN Limited.
|
|
(426 KB)
|
Petition to extend the benchmark capital cost & generic tariff as decided by the Commission vide Order dated 16.06.2016 upto 31.01.2018 for Grid Interactive Rooftop and Small Solar Power Plants.
|
|
(340 KB)
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement executed between Uttarakhand Power Corporation Limited and Uttarakhand Renewable Energy Development Agency.
|
|
(399 KB)
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s Avani Bio Energy Pvt. Ltd
|
|
(412 KB)
|
Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015
|
|
(528 KB)
|
Petition seeking investment approval on the project for implementing Integrated Automatic Meter Reading (IAMR) System on 12000 nos. of consumers to be executed on turnkey basis.
|
|
(158 KB)
|
Petition for seeking carry forward of Renewable Purchase Obligation of FY 2016-17 amounting to 787.68 MU (Non-Solar) and 161.32 MU (Solar) as per the provisions of UERC
|
|
(446 KB)
|
Date of orderIn the Matter of: Condonation for delay in implementation of online issuance of NoC to Open Access Customers
|
|
(80 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2017 to 30.09.2017
|
|
(471 KB)
|
Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Pvt. Ltd.
|
|
(65 KB)
|
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2017-18 and onwards till reviewed
|
|
(610 KB)
|
Petition for review of the Commission’s Order dated 29.03.2017 on True up for FY 2015-16, Annual Performance Review for FY 2016-17 and Annual Revenue Requirement for FY 2017-18.
|
|
(2 MB)
|
Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s RV Akash Ganga Solar Power Ltd.
|
|
(371 KB)
|
Augmentation of 220 kV Substation SIDCUL Haridwar from 2×80 MVA (132/33 kV)+ 1×50 MVA (220/33 kV) to 2×80 MVA (132/33 kV)+1×50 MVA (220/33 kV)+1×25 MVA (220/33 kV)
|
|
(72 KB)
|
Petition for seeking prior approval of “Capital Investment for Renovation & Modernisation” of Dhakrani HEP (3 X 11.25 MW) of UJVN Ltd.
|
|
(209 KB)
|
Petition seeking approval of the Commission for advance banking of power to Punjab State Power Corporation Ltd. under banking arrangement by Uttarakhand Power Corporation Ltd.
|
|
(381 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.04.2017 to 30.06.2017.
|
|
(498 KB)
|
Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Ltd
|
|
(423 KB)
|
Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 30th October
|
|
(484 KB)
|
In the Matter of: Misc. Application filed against the shifting of High Tension Line (33 KV) in Prakash Vihar, Haridwar Road, Dehradun under section 67(4) of The Electricity Act, 2003.
|
|
(134 KB)
|
Suo-moto proceedings in the matter of Office Memorandum issued by UPCL regarding continuation of Continuous Power Supply Surcharge/Additional Surcharge on Power purchased through open access
|
|
(151 KB)
|
Petition to extend the benchmark capital cost & generic tariff as declared by UERC vide its Order dated 16.06.2016, i.e. upto 31.07.2017 for Grid Interactive Rooftop and Small Solar Power Plants.
|
|
(305 KB)
|
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Mittal Processors Pvt. Ltd. (MPP Ltd.)
|
|
(195 KB)
|
Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Applicant
|
|
(341 KB)
|
Petition to waive the token Penalty of Rs. 10000 imposed on MD, UPCL under section 142 of the Electricity Act, 2003 vide Order dated 09.09.2014 in the matter of non-compliance
|
|
(332 KB)
|
Application seeking approval of the Commission for the investment on the project covering the works covered under Part-‘B’ of Restructured-Accelerated Power Development
|
|
(247 KB)
|
Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access.
|
|
(87 KB)
|
Application under Section 42(2) of the Electricity Act, 2003 read with Regulation 58 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations
|
|
(160 KB)
|
Withdrawal of Show-Cause notices dated March 12, 2013 in pursuance to Judgment dated October 01, 2014 of the Hon’ble Appellate Tribunal for Electricity in Appeal Nos
|
|
(235 KB)
|
Petition seeking amendment in the PPA dated 30.11.2010 executed between M/s Birahi Ganga Hydro Power Ltd. and UPCL in accordance with the provisions of UERC
|
|
(401 KB)
|
Application seeking review of the Tariff Order dated 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for FY 2014-2015.
|
|
(414 KB)
|
Petition seeking clarification on various issues for implementation of “Uttarakhand Grid Interactive Rooftop and Small SPV Power Plants Scheme”.
|
|
(472 KB)
|
Application seeking approval of Hon’ble UERC for the investment on the projects covering the construction of 22 No. 33/11 kV Substation, 6 No. Feeders for 132/33 kV Substation Simli
|
|
(140 KB)
|
Petition seeking carry forward of Renewable Purchase Obligation for FY 2012-13 and FY 2013-14 as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.
|
|
(254 KB)
|
Petition seeking interference of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station
|
|
(289 KB)
|
Petition seeking post facto approval of the Fuel Charge Adjustment (FCA) charged from the consumers for the period from 01.07.2014 to 30.09.2014.
|
|
(435 KB)
|
Petition filed by Uttarakhand Power Corporation Limited seeking review of the Order dated April 10, 2014 passed by the Commission determining the tariff of Vanala SHP having capacity of 15 MW
|
|
(349 KB)
|
Petition seeking approval of the Commission for the investment on the project covering construction of 44.1 Km., 33 kV line to connect 7 Nos. 33/11 kV Substation to 220/33 kV Substation Jhajhara.
|
|
(150 KB)
|
Notice issued to MD, UPCL under Section 142 of the Electricity Act, 2003 in the matter of non-compliance of the Commission’s Order dated 24.06.2014 on the Review Petition filed
|
|
(255 KB)
|
Notice issued to MD, UPCL under Section 43(3) of the Electricity Act, 2003 for violation of the provisions of Section 43(1) of the Electricity Act, 2003 in pursuance to the Commission’s Order
|
|
(159 KB)
|
Petition seeking waiver of per day Penalty imposed by the Commission vide order dated January 22, 2014 for non-compliance of directions issued vide Order dated September 11, 2013.
|
|
(322 KB)
|
Review Petition filed by UPCL on Commission’s Order dated 05.05.2014 on the Application seeking approval of releasing additional 6 MVA load (Total of 20 MVA)
|
|
(468 KB)
|
Application seeking recovery of claim in respect of Deemed Generation under Section 44 (A) of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional)
|
|
(271 KB)
|
Application seeking approval for the Investment on the project covering (i) releasing of 2,500 electricity connections for Private Tube-wells (ii) installation of double metering
|
|
(76 KB)
|
Review Petition on the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations
|
|
(145 KB)
|
Petition filed by M/s Him Urja Pvt Ltd. under UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010 seeking accreditation and issuance of Renewable Energy Certificates
|
|
(307 KB)
|
Sh. S. K Tamta, Chief Engineer (Commercial), UPCL.
|
|
(91 KB)
|
Application for seeking review/reconsideration on the Commission’s Order dated 28.02.2014 issued in the matter of approval of Investment in the project
|
|
(72 KB)
|
Petition seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Super Hydro Electric Pvt. Ltd.
|
|
(262 KB)
|
Petition under provision of the Regulation 68 read with Regulation 74 of UERC (Conduct of Business) Regulations, 2004 to reconsider/review the order dated 22.01.2014 passed by UERC
|
|
(243 KB)
|
Application in pursuance to Show-Cause notice no. UERC/6/TF-142/12-13/2013/1720 dated March 12, 2013.
|
|
(438 KB)
|
Petition filed by M/s Him Urja (P) Ltd. seeking determination of tariff of Vanala SHP of 15 MW Capacity.
|
|
(556 KB)
|
Application filed by M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Haridwar in the matter of misc petition under UERC (Tariff & Other Terms for Supply of Electricity from Renewable Energy Sources
|
|
(289 KB)
|
Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Regency Gangani Energy Pvt. Ltd.
|
|
(300 KB)
|
Petition under Section 86(1)(f) of the Electricity Act,2003, for adjudication of dispute between M/s PTC India Ltd., Swasti Power Engineering Ltd., Uttarakhand Power Corporation Ltd.
|
|
(185 KB)
|
Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Super Hydro Electric Pvt. Ltd.
|
|
(154 KB)
|
Dispute between M/s Bhilangana Hydro Power Limited and Power Transmission Corporation of Uttarakhand Limited regarding illegal and incorrect bills for monthly transmission charges
|
|
(132 KB)
|
Application filed by M/s Swasti Power Engineering Ltd. for condonation of delay in filing of the Petition for determination of Project Specific Tariff in respect of Bhilangana 22.5 MW HEP
|
|
(346 KB)
|
1) Notice under section 142 read with section 146 of the Electricity Act, 2003 and in the matter of Non-compliance of Commission’s Directions issued vide Order dated 01.02.2013.
|
|
(57 KB)
|
Application seeking relaxation of the provisions of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations
|
|
(162 KB)
|
Non-Compliance by Obligated Entities under UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations, 2010 and UERC
|
|
(353 KB)
|
Notice under Section 142 of the Electricity Act, 2003 in the matter of Non-compliance of the Commission’s Directions with regard to the electricity theft caught by departmental Vigilance
|
|
(132 KB)
|
Non-compliance of Commission’s directions with regard to Commercial Performance Monitoring of the licensee including submission of monthly periodical reports in the prescribed formats by UPCL
|
|
(138 KB)
|
Notice under Section 142 of the Electricity Act, 2003 in the matter of Non-compliance of Commission’s Directions
|
|
(127 KB)
|
Application seeking approval for investment on the project for implementing Integrated Automatic Meter Reading (IAMR) System.
|
|
(130 KB)
|
Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence [Licence No. 1 of 2003]
|
|
(119 KB)
|
Non-compliance of Commission’s Order dated 02.04.2013 in the matter of delay in release of new connections to BSNL
|
|
(131 KB)
|
Non-compliance of UERC (The Electricity Supply Code) Regulations, 2007 with regard to ‘Additional Security Deposit’.
|
|
(158 KB)
|
Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources
|
|
(201 KB)
|
Representation of M/s Bhilangana Hydro Power Ltd. seeking clarification in the matter of impact on accreditation of its 24 MW Bhilangana-III HEP
|
|
(208 KB)
|
Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.
|
|
(223 KB)
|
Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of Section 59 of the Electricity Act, 2003 read with Regulation 5 of UERC (Standard of Performance) Regulations, 2007.
|
|
(200 KB)
|
Application filed by UPCL for approval of procurement of 200 MW (+/- 20%) power on Medium term basis with respect to Guidelines for Determination of Tariff by Bidding Process
|
|
(127 KB)
|
Petition for seeking approval for implementation of Domestic Efficient Lighting Program (DELP) for LED bulbs in the state of Uttarakhand under 24 X 7 Power for All.
|
|
(121 KB)
|
Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & M/s GMR Chhattisgarh Energy Ltd.
|
|
(420 KB)
|
Petition filed for adjudication and appropriate direction under Section 86 (1) (f), 94(2) of the Electricity Act, 2003 read with Regulation 20 & 21 of the UERC (Conduct of Business) Regulations,
|
|
(184 KB)
|