Hearing Archive
| Title | Date | Time | Petitioner/Respondent |
|---|---|---|---|
|
Suo-moto proceeding initiated under Section 142 read with Section 146 and Section 149 of the Electricity Act, 2003 by the Commission in the matter of ‘Non-compliance of the Commission’s directions issued vide the Commission’s Order dated 10.04.2024 and the Commission’s letter dated 29.11.2024 pertaining to non-payment of penalty due w.r.t. delay in release of new LT connecitons’. |
09.12.2025 | 11:30 AM | UPCL ……………..Respondent(s) |
| Application filed by M/s DS Solar Energy Private Ltd. and M/s Fairdeal Solar Energy Private Ltd. In the matter of: a. “Petition under Section 86(1)(e) and (f) of the Electricity Act, 2003 seeking adjudication of disputes under Power Purchase Agreement dated 08.04.2021 pertaining to loss of evacuation on account of failure of Uttarakhand Power Corporation Limited to develop interconnection facilities”. “Petition under Section 86(1)(e) and (f) of the Electricity Act, 2003 seeking adjudication of disputes under Power Purchase Agreement dated 16.06.2021 pertaining to loss of evacuation on account of failure of Uttarakhand Power Corporation Limited to develop interconnection facilities”. |
09.12.2025 | 11:30 AM |
1. M/s DS Solar Energy Private Ltd. 2. M/s Fairdeal Solar Energy Private Ltd ……………..Petitioner(s) ……………..Respondent(s) |
| Public Hearing in the matter of Suo-motu proceedings initiated by the Commission in the matter of proposal submitted by UPCL seeking in-principle approval for procurement of 500 MW Round the Clock power against Medium Term tender invited by it. | 31.10.2025 | 11.30 AM | Managing Director, Uttarakhand Power Corporation Ltd., Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. & All the Stakeholders. |
| Petition under Sections 61, 62 and 86 of the Electricity Act, 2003 read with Regulations 50(6), 103(1), 104 and 105 of the Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021 for recovery of energy charges due to shortfall in energy generation for reasons beyond the control of generating station during the FY 2022-23 in respect of Dhakrani and Khatima Hydro Power Stations of UJVN Ltd. | 14.10.2025 | 11:30 AM | UJVN Ltd. ………………………………..Petitioner UPCL ………………………………..Respondent |
| Petition under Sections 61, 62 and 86 of the Electricity Act, 2003 read with Regulations 50(6), 103(1), 104 and 105 of the Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018 & 2021 for recovery of under recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating station during the FY 2021-22 in respect of Ramganga Hydro Power Station of UJVN Ltd. | 14.10.2025 | 11:30 AM | UJVN Ltd. ………………………………..Petitioner UPCL ………………………………..Respondent |
| Investment Approval for Construction of proposed 220/132/33 kV S/s Raipur (Bhagwanpur), Roorkee along with construction of associated lines (220 kV D/C Line from 400kV substation, Puhana (PGCIL), Roorkee to proposed 220/132/33 kV S/s Raipur (Bhagwanpur), Roorkee & LILO Line of 132 kV Bhagwanpur-LSM line at proposed 220/132/33 kV S/s Raipur, Bhagwanpur, Roorkee. | 14.10.2025 | 11:30 AM | PTCUL ………………………………..Petitioner |
| Hearing in the matter of Petition under Sections 86(1)(a) and 86(1)(b) read with Section 63 of the Electricity Act, 2003 and Rules 2(1)(c) & 3 of the Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021 seeking relief on account of Change in Law due to Ministry of Finance, Government of India’s Notification dated 08.10.2024 read with Corrigendum dated 22.10.2024 imposing GST liability @ 18% under Reverse Charge Mechanism ‘RCM’ on renting of immovable property (other than residential dwelling) by an unregistered person to a registered person. | 08.10.2025 | 11:30 AM |
1. M/s Devishi Solar Power Pvt Ltd. 2. M/s Devishi Renewable Energy Pvt. Ltd. 3. M/s Eminent Solar Power Pvt. Ltd. 4. M/s Sunworld Energy Pvt. Ltd. |
| Hearing in the matter of Application for Stay of the Order dated 13.05.2025 passed by the Commission in the Suo-moto proceedings in the matter of implementation of the APTEL’s Judgment dated 28.08.2024 in Appeal No. 100 of 2017 and Appeal No. 389 of 2018 pending adjudication of Misc. Application No. 68 of 2025 filed under Section 94(2) of the Electricity Act, 2003 read with Regulation 18(2) read with Regulation 59 of the UERC (Conduct of Business) Regulations, 2014. | 06.10.2025 | 04:00 PM | Managing Director, Uttarakhand Power Corporation Ltd., Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. ………………………………..Petitioner ………………………………..Respondent |
| Review Petition under Section 94(1)(F) of the Electricity Act, 2003 read with Regulation 54 of UERC (Conduct of Business) Regulations, 2014. Review of Order dated 07.10.2024 passed by the Hon’ble UERC in the matter of Panache Residents Welfare Association Vs UPCL and Anr. | 23.09.2025 | 11:30 AM | General Secretary, Panache Residents Welfare Association ………………………………..Petitioner 1. UPCL 2. Smt. Minakhsi Bhatt ………………………………..Respondents |
|
Misc. Application filed by Shri Vikram Singh Chikara, Kuanwala, Near Soap Factory/Generator Factory, Dehradun pertaining to Shifting of Electric Line. |
02.09.2025 | 11.30 AM | Shri Vikram Singh Chikara, Kuanwala, Near Soap Factory/Generator Factory, Dehradun…………….Petitioner 1. MD, UPCL 2. EE, Raipur, Dehradun 3. SDO, Balawala, Dehradun …………….Respondent |
|
Hearing in the matter of Petition seeking review of the Order dated 13th May, 2025 passed by the Commission in the Suo-moto proceedings in the matter of implementation of the Hon’ble APTEL’s Judgement dated 28.08.2024 in Appeal No. 100 of 2017 and Appeal No. 389 of 2018, filed under Section 94(1)(f) of the Electricity Act, 2003, read with Section 114, Order XLVII of the Code of Civil Procedure, 1908 and Regulation 54 read with Regulation 59 of the UERC (Conduct of Business) Regulations, 2014. |
06.08.2025 | 11.30 AM | Managing Director, Uttarakhand Power Corporation Ltd., Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. …………….Petitioner M/s Greenko Budhil Hydro Power Pvt. Ltd., 15th Floor, Hindustan Times House, 18-20, Kasturba Gandhi Marg, New Delhi-110001 …………….Respondent |
|
Hearing in the matter of Investment Approval for Construction of proposed 220/132/33 kV S/s Raipur (Bhagwanpur), Roorkee along with construction of associated lines (220 kV D/C Line from 400kV substation, Puhana (PGCIL), Roorkee to proposed 220/132/33 kV S/s Raipur (Bhagwanpur), Roorkee & LILO Line of 132 kV Bhagwanpur-LSM line at proposed 220/132/33 kV S/s Raipur, Bhagwanpur, Roorkee. |
12.08.2025 | 11.30 AM |
PTCUL …………….Petitioner |
|
Public Hearing in the matter of Petition filed by Uttarakhand Power Corporation Ltd. (UPCL) in the matter of “Petition for review of the Commission’s Tariff Order dated 11.04.2025 on the Petitions of the Business Plan and Multi Year Tariff for Fifth Control Period from FY 2025-26 to FY 2027-28 and Tariff determination for FY 2025-26 alongwith True-up for FY 2023-24.“ |
05.08.2025 | 11.30 AM | Managing Director, Uttarakhand Power Corporation Ltd., Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. …………….Petitioner & All the Stakeholders. |
|
Application seeking review of the UERC’s Tariff Order dated 11.04.2025 on Approval of Business Plan and Multi Year Tariff for Fifth Control Period (FY 2025-26 to FY 2027-28), Annual Performance Review for FY 2024-25 and True-up for FY 2023-24 for UJVN Ltd. |
05.08.2025 | 11.30 AM | UJVN Ltd. …………….Petitioner UPCL & HPSEBL …………….Respondents |
|
Public Hearing in the matter of Petition filed by Uttarakhand Power Corporation Ltd. (UPCL) seeking removal of certain difficulties/ relaxation in implementation of Tariff Order dated 11.04.2025, with respect to power procurement. |
31.07.2025 | 11.30 AM | Managing Director, Uttarakhand Power Corporation Ltd., Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. …………….Petitioner & All the Stakeholders. |
|
Review Petition in the matter of Order dated 11.04.2025 issued by the Commission in Petition No. 10 & 11 of 2025 of PTCUL for approval of True-up for FY 2023-24, Annual Performance Review (APR) for FY 2024-25 and Aggregate Revenue Requirement (ARR) for FY 2025-26 alongwith MYT Tariff for FY 2025-26 to FY 2027-28 and Approval of Business Plan for the Control Period from FY 2025-26 to FY 2027-28 for PTCUL |
31.07.2025 | 11.30 AM | PTCUL …………….Petitioner |
|
Petition seeking implementation of Clause 26-Taxes and Duties of UERC (Tariff and other Terms for supply of Electricity from Non-conventional & Renewable Energy Sources) Regulations, 2010, for Vanala Small Hydro Electric Power Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. |
17.06.2025 | 11.30 AM | M/s Him Urja Pvt. Ltd., …………….Petitioner Uttarakhand Power Corporation Ltd. |
|
Application seeking review of the UERC’s Tariff Order dated 24.03.2025 on Approval of Capital Cost, True-up for FY 2022-23, and Annual Fixed Charges for FY 2024-25 for Vyasi Hydro Electric Project. |
17.06.2025 | 11.30 AM | UJVN Ltd. …………….Petitioner |
|
Suo-moto proceeding in the matter of Non-compliance of the Commission’s directions issued vide letter No. UERC/5/Tech/263/ 2024-25/1562 dated 27.02.2025. |
17.06.2025 | 11.30 AM | Uttarakhand Power Corporation Ltd. …………….Respondent |
|
Hearing in the matter of Petition seeking review of the Commission’s Order dated 27.03.2025, passed in the Suo-Moto proceedings regarding Extension requests for development and commissioning of Solar Power Plants allotted under “Tariff based Competitive Bidding Process” for Type-1 Projects under the Solar Energy Policy of Uttarakhand, 2013. |
17.06.2025 | 11.30 AM | M/s Dailyhunt Energy Pvt. Ltd. …………….Petitioner Managing Director, Uttarakhand Power Corporation Ltd., Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. & Chief Project Officer, Uttarakhand Renewable Energy Development Agency (UREDA) Urja Park Campus, Industrial Area, Patel Nagar, Dehradun …………….Respondents |
|
Regarding Hon’ble APTEL’s Order dated 24.03.2025 in Appeal No. 295 of 2018 in the matter of appeal against the Commissions Order dated 24.11.2017 in Petition No. 40 of 2017 (Suo-moto). |
10.06.2025 | 11.30 AM | Uttarakhand Power Corporation Ltd. Uttar Bharat Hydro Power Pvt. Ltd. …………….Respondents |
|
Suo-moto proceeding in the matter of Show Cause Notice under Section 142 of the Electricity Act, 2003, read with Regulation 3.3.2(4) of the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020.. |
10.06.2025 | 11.30 AM | (1) MD, UPCL (2) Director (Operations) (3) CE (Kumaon Zone) (4) CE (Rudrapur Zone) (5) SE, Haldwani (6) SE, Kashipur (7) SE, Champawat (8) SE, Rudrapur (9) EE, EDD, Ramnagar (10) EE, EDD, Kashipur (11) EE, EDD, Bazpur (12) EE, EDD, Champawat (13) EE, EDD, Sitarganj, (14) EE, EDD, Khatima (15) EE, EDD, Rudrapur-II …………….Respondents |
|
In the Matter of: Suo-moto proceeding in the matter of Non-compliance of the Commission’s directions issued vide letter No. UERC/5/Tech/263/ 2024-25/1562 dated 27.02.2025. |
10.06.2025 | 11.30 AM | Uttarakhand Power Corporation Ltd. …………….Respondent |
|
Application seeking review of the tariff order issued by the Commission on 11.04.2025 on the determination of AFC charges of M/s Sravanthi Energy Pvt. Ltd. for FY 2025-26 along with Truing up of FY 2023-24 under section 94 (i)(f) of the Electricity Act, 2003 read with order XLVII (1) of the code of Civil Procedure 1908 & Regulation 54 (i) of the UERC (Conduct of Business) Regulations,2014. |
03.06.2025 | 11.30 AM | M/s Sravanthi Energy Pvt. Ltd. …………….Petitioner Uttarakhand Power Corporation Ltd. |
|
Petition seeking review of the Commission’s Order dated 27.03.2025, passed in the Suo-Moto proceedings regarding Extension requests for development and commissioning of Solar Power Plants allotted under “Tariff based Competitive Bidding Process” for Type-1 Projects under the Solar Energy Policy of Uttarakhand, 2013. |
03.06.2025 | 11.30 AM | M/s GCS Solar Energy Pvt. Ltd., …………….Petitioner UPCL |
|
Suo-moto proceeding in the matter of Show Cause Notice under Section 142 of the Electricity Act, 2003, read with Regulation 3.3.2(4) of the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020. |
10.06.2025 | 11.30 AM |
(1) MD, UPCL …………….Respondent |
|
Application seeking approval of the Commission on Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Rai Bahadur Narain Singh Sugar Mills Ltd. – 30 MW (Surplus 19.1 MW to UPCL). |
29.04.2025 | 11.30 AM |
Uttarakhand Power Corporation Ltd. …………….Petitioner M/s Rai Bahadur Narain Sing Sugar Mills Ltd. |
|
Petition seeking implementation of Clause 26-Taxes and Duties of UERC (Tariff and other Terms for supply of Electricity from Non-conventional & Renewable Energy Sources) Regulations, 2010, for Vanala Small Hydro Electric Power Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd. |
06.05.2025 | 11.30 AM |
M/s Him Urja Pvt. Ltd.,
…………….Petitioner |
|
Petition under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003,read with Regulation 59(1) of The UERC (Conduct of Business) Regulations 2014 and the “Guidelines for Procurement of Electricity for Medium Term” issued by the Ministry of Power, Government of India, seeking approval of the Commission for deviation/modification and/or clarification in specific clauses of the bidding documents (RFQ, RFP, and APP) issued for procurement of 500 MW RTC coal-based power under medium-term procurement. |
06.05.2025 | 11.30 AM |
Uttarakhand Power Corporation Ltd. …………….Petitioner |
|
Hearing in the matter of: |
14.02.2025 | 11.30 AM |
Managing Director, …………….Petitioner M/s Greenko Budhil Hydro Power Pvt. Ltd., |
|
Hearing in the matter of Petition regarding permission to install GRPV Plant beyond 1.0 MW limit set by the Commission with Net Metering facility by UPCL. |
27.02.2025 | 11.30 AM |
M/s Opto Electronics Pvt. Ltd. …………….Petitioner Managing Director, …………….Respondent |
|
Hearing in the matter of: |
21.01.2025 | 11.30 AM |
1. M/s Galwalia Ispat Udyog Pvt. Ltd. 2. M/s Kumaon Garhwal Chamber of Commerce & Industry (KGCCI) …………….Petitioners Uttarakhand Power Corporation Ltd. (UPCL) …………….Respondent |
|
Hearing in the matter of: |
21.01.2025 | 11.30 AM |
M/s Patanjali Food & Herbal Park Pvt. Ltd., Haridwar …………….Petitioner MD, UPCL …………….Respondents |
|
Hearing in the matter of Suo-moto proceedings w.r.t. implementation of APTEL’s Judgement dated 28.08.2024 in Appeal No. 100 of 2017 and Appeal No. 389 of 2018. |
17.12.2024 | 11.30 AM |
Managing Director, Uttarakhand Power Corporation Ltd., Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. & M/s Greenko Budhil Hydro Power Pvt. Ltd., 15th Floor, Hindustan Times House, 18-20, Kasturba Gandhi Marg, New Delhi-110001. |
|
Hearing in the matter of Petition seeking Approval of Releasing of Additional 2000 kVA Load (Total Contracted Load of 12000 kVA) on a Supply Voltage Line of 33 kV and thereby Providing Relaxation Over Regulation No. 2.1 (4) of the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020. |
05.11.2024 | 11.30 AM |
M/s Ultratech Cement Limited …………….Petitioner PTCUL …………….Respondents |
|
Hearing in the matter of Show-cause Notice dated 30.07.2024 under Section 142 of the Electricity Act, 2003 in the matter of Complaint filed by M/s Kashi Vishwanath Steels Pvt. Ltd. with regard to demanding connectivity charges for enhancement of load. |
05.11.2024 | 11.30 AM |
M/s Kashi Vishwanath Steels Pvt. Ltd. …………….Petitioner PTCUL …………….Respondents |
|
Hearing in the matter of Suo-moto proceeding in the matter of Show Cause Notice under Section 142 of the Electricity Act, 2003, read with Regulation 3.3.2(4) of the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020. |
13.11.2024 | 11.30 AM |
MD, UPCL …………….Respondents |
|
Hearing in the matter of Petition for determination of Project Specific Tariff for Kaliganga-II (2×2.25 MW) Small Hydro Power Station of UJVN Ltd. under Sections 62(1)(a) and 86(1)(a) of the Electricity Act, 2003 read with the relevant Regulations, Orders and Guidelines of the Commission. |
15.10.2024 | 11.30 AM |
Managing Director …………….Petitioner Managing Director, …………….Respondent |
|
Hearing in the matter of implementation of APTEL’s Judgement dated 28.08.2024 in Appeal No. 100 of 2017 and Appeal No. 389 of 2018. |
25.10.2024 | 11.30 AM |
Managing Director, |
|
Hon’ble APTEL’s Order dated 19.07.2024 on Appeal No. 215 of 2016 w.r.t. ‘Denial of 50% of the excess IDC and 50% of price variation component of capital cost for MB-II project |
26.09.2024 | 11.30 AM |
1) UJVN Ltd. 2) UPCL …………….Respondent 2 |
|
Suo moto proceedings in the matter of tariff of the RE Component in addition to the tariff applicable for Rajwakti SHP of M/s Him Urja Pvt. Ltd. |
30.09.2024 | 11.30 AM |
Chairman cum Managing Director, …………….Respondents |
|
Hearing in the matter of UJVNL’s submission through letter dated 09.09.2024 seeking cancellation of Public Hearing scheduled to be conducted on 01.10.2024 in context to Hon’ble APTEL’s Order dated 19.07.2024 in the matter of Appeal No. 215 of 2016, 283 of 2016 & 139 of 2018 w.r.t. ‘Return on Equity (RoE) on capital infused by GoU from the Power Development Fund (PDF) for Maneri Bhali-II (MB-II) Hydro Electric Project (HEP) of UJVN Ltd. |
01.10.2024 | 11.30 AM |
All the stake holders |
|
Hearing in the matter of Hon’ble APTEL’s Order dated 19.07.2024 in the matter of Appeal No. 215 of 2016, 283 of 2016 & 139 of 2018 w.r.t. ‘Return on Equity (RoE) on capital infused by GoU from the Power Development Fund (PDF) for Maneri Bhali-II (MB-II) Hydro Electric Project (HEP) of UJVN Ltd.’ |
01.10.2024 | 11.30 AM |
All the stake holders |
|
Additional security deposit amount levied 3 times of fortnightly bill by Uttarakhand Power Corporation Limited from April 2024 onwards in monthly electricity bills being issued. |
04.10.2024 | 11.30 AM |
1) M/s KGCCI UPCL …………….Respondent |
|
Hon’ble APTEL’s Order dated 19.07.2024 on Appeal No. 215 of 2016 w.r.t. ‘Denial of 50% of the excess IDC and 50% of price variation component of capital cost for MB-II project |
17.09.2024 | 11.30 AM |
1) UJVN Ltd. 2) UPCL …………….Respondent 2 |
|
Public Hearing in the matter of Draft UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024. |
30.08.2024 | 11.30 AM |
|
|
Review Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 and UERC (The Electricity Supply Code, Release of New connections and Related Matters)Regulations, 2020 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of F.Y. 2008-09 to F.Y. 2018-19 and up to Feb-2020 and from Sept-2021 to April-2024. |
20.08.2024 | 11.30 AM |
UPCL |
|
Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020. |
28.08.2024 | 11.30 AM |
UPCL (1) M/s Radiant Bar Pvt. Ltd. ……………. Respondent |
|
Public Hearing on UPCL’s Petition to decide on admissibility of the Petition for review of the Commission’s Tariff Order dated 28.03.2024 on the Annual Revenue Requirement & Tariff Petition for FY 2024-25. |
14.08.2024 | 11.30 AM |
|
|
Review Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 and UERC (The Electricity Supply Code, Release of New connections and Related Matters)Regulations, 2020 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of F.Y. 2008-09 to F.Y. 2018-19 and up to Feb-2020 and from Sept-2021 to April-2024. |
26.07.2024 | 11.30 AM |
UPCL |
|
Application seeking removal of difficulty/clarification in the UERC (The Electricity Supply Code, Release of New Connections and Related Matters) Regulations, 2020 |
12.07.2024 | 11.30 AM |
Uttarakhand Power Corporation Ltd. (UPCL) Petitioner……………. 1) M/s Radiant Bar Pvt. Ltd. 2) PTCUL Respondent……………. |
|
Petition filed under Regulation 9,20,58,59,61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 3.6 and chapter -8 Regulation 1 to 3 of UERC Supply Code Regulation 2020 against wrongful release of individual connections and for clarifying the scope of proviso to sub regulation 6 of regulation 3.6 and removing the difficulty by modifying or amending the provisions regarding releasing of individual connections to user taking supply form the bulk supply connection issued to a developer. |
12.07.2024 | 11.30 AM |
General Secretary Petitioner……………. 1) UPCL Respondent……………. |
|
Petition under Section 86 (1)(f) and 86 (1)(k) of the Electricity Act, 2003 read with Article 8, 10, 12 and 13 of the Power Purchase Agreement dated 18.02.2021 executed between Bhilangana Hydro Power Ltd. and Uttarakhand Power Corporation Ltd. seeking appropriate direction for release of outstanding payment alongwith applicable Late Payment Surcharge towards the power supplied by BHPL to UPCL during the FY 2020-21. |
18.07.2024 | 11.30 AM |
M/s Bhilangana Hydro Power Ltd. UPCL |
|
Review Petition in the matter of order dated March 28, 2024 issued by the Commission in Petition No. 49 of 2023 for PTCUL’s true up for FY 2022-23, Annual Performance Review (APR) for FY 2023-24 and revised Aggregate Revenue Requirement (ARR) for FY 2024-25. |
23.07.2024 | 11.30 AM |
PTCUL |
|
Application seeking review of the UERC’s Tariff Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24, and Annual Fixed Charges for FY 2024-25. |
23.07.2024 | 11.30 AM |
UJVN Ltd. |
|
Petition for fixation of voltage wise distribution loss or reduction of approved distribution loss for open access captive solar power plants under Uttarakhand State Solar Policy 2023. |
09.07.2024 | 11.30 AM |
UREDA. Petitioner……………. UPCL |
|
Petition under Section 62 and 84 of the Electricity Act, 2003 read with Regulation 50(6) of the UERC (Terms and Conditions for Determination of MYT) Regulations, 2018 & 2021 for recovery of under recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating station during the FY 2020-21, FY 2021-22 and FY 2022-23 in respect of Budhil Hydro Power Project (BHEP). |
09.07.2024 | 11.30 AM |
M/s Greenko Budhil Hydro Power Private Limited Petitioner……………. UPCL |
|
Petition under Section 61, 62 & 86 of the EA, 2003 read with Regulations 50(6) of the UERC (Terms & Conditions for Determination of MYT) Regulations, 2018 & 2021 for recovery of under recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating stations during the FY 2020-21 in respect of Dhakrani, Dhalipur and Kulhal Hydro Power Stations of UJVN Ltd. |
09.07.2024 | 11.30 AM |
UJVN Ltd. Petitioner……………. UPCL |
|
Hearing in the matter of Petition under Section 86 (1)(f) and 86 (1)(k) of the Electricity Act, 2003 read with Article 8, 10, 12 and 13 of the Power Purchase Agreement dated 18.02.2021 executed between Bhilangana Hydro Power Ltd. and Uttarakhand Power Corporation Ltd. seeking appropriate direction for release of outstanding payment alongwith applicable Late Payment Surcharge towards the power supplied by BHPL to UPCL during the FY 2020-21. |
14.05.2024 | 11.30 AM |
M/s Bhilangana Hydro Power Ltd., Petitioner……………. Managing Director, Respondent……………. |
|
Petition filed under Regulation 9,20,58,59,61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 3.6 and chapter -8 Regulation 1 to 3 of UERC Supply Code Regulation 2020 against wrongful release of individual connections and for clarifying the scope of proviso to sub regulation 6 of regulation 3.6 and removing the difficulty by modifying or amending the provisions regarding releasing of individual connections to user taking supply form the bulk supply connection issued to a developer. |
14.05.2024 | 11.30 AM |
General Secretary, Petitioner……………. 1. UPCL, Respondents……………. |
|
Suo-moto proceeding initiated by the Commission for non-compliance of Regulation 3.4.3(11) of UERC Supply Code, New Connection Regulations, 2020 pertaining to 33 kV bay by M/s Metro Decorative Pvt. Ltd. Kashipur. |
17.05.2024 | 11.30 AM |
MD, UPCL, Dehradun |
|
Petition for: |
17.05.2024 | 11.30 AM |
MD, PTCUL Petitioner……………. |
|
Hearing in the matter of petition u/s 61. 62 and 86 of EA read with Regulation 50(6) of UERC MYT Regulation, 2018 & 2021 for recovery of under recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating stations during the FY 2020-21 in respect of Dhakrani, Dhalipur and Kulhal HEP of UJVN Ltd. |
28.05.2024 | 11.30 AM |
MD, Petitioner……………. MD, UPCL, Dehradun |
|
Hearing in the matter of petition u/s 61. 62 and 86 of EA read with Regulation 50(6) of UERC MYT Regulation, 2018 & 2021 for recovery of under recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating stations during the FY 2020-21, FY 2021-22, and FY 2022-23 in respect of Budhil HEP. |
28.05.2024 | 11.30 AM |
M/s Greenko HEP
Petitioner……………. Respondent……………. |
|
Petition filed under Regulation 9,20,58,59,61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 3.6 and chapter -8 Regulation 1 to 3 of UERC Supply Code Regulation 2020 against wrongful release of individual connections and for clarifying the scope of proviso to sub regulation 6 of regulation 3.6 and removing the difficulty by modifying or amending the provisions regarding releasing of individual connections to user taking supply form the bulk supply connection issued to a developer. |
14.05.2024 | 11.30 AM |
General Secretary, Petitioner……………. 1. UPCL, Respondents……………. |
|
Filing of Miscellaneous Petition u/s 181(1) r/w Section 181(2)(zp) r/w Section 94(1)(f) of the Indian Electricity Act, 2003, seeking relaxation of Clause 2.1(4) of the UERC (the Electricity Supply Code, Release of New Connections and Related Matters) Regulation 2020, for approving additional power load of 3000 kVA (in two stages of 1500 kVA each) as against the existing Sanctioned power load of 9900 kVA; for supply at the existing 33 kV line; and assailing the rejection of this request, by the Executive Engineer, EDD, Uttarakhand Power Corporation Limited, vide their letter dated 05.08.2024. |
29.04.2025 | 11.30 AM |
M/s Patanjali Food & Herbal Park Pvt. Ltd., Haridwar …………….Petitioner MD, UPCL, |
|
Application seeking approval of the Commission on Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Rai Bahadur Narain Singh Sugar Mills Ltd. – 30 MW (Surplus 19.1 MW to UPCL). |
29.04.2025 | 11.30 AM |
Uttarakhand Power Corporation Ltd. …………….Petitioner
M/s Rai Bahadur Narain Sing Sugar Mills Ltd. …………….Respondent |
|
Petition under Section 86(1)(f) and (e) of the Electricity Act, 2003 read with Regulation 49 of the UERC (Tariff and other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based co-generating stations) Regulations, 2018 (as amended) seeking direction to Uttarakhand Power Corporation Limited pay our deemed generation claim for Motighat SHP (5MW) & Tanga SHP (5MW) |
03.04.2024 | 11.30 AM |
M/s Himalaya Hydro Pvt. Ltd.. Petitioner……………. UPCL Respondent……………. |
|
Hearing in the matter of Petition for resolution of matter pertaining to “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corp. Ltd. (UPCL) from 214 MW (225 MW ISO) for Phase-I of 2×225 MW (450 MW ISO) Gas based Combined Cycle Power Plant at Kashipur, Uttarakhand for the FY 2018-19, FY 2019-20, FY 2020-21, FY 2021-22, FY 2022-23 and for the period 1st April, 2023 to 31st August, 2023. |
22.03.2024 | 11.30 AM |
Managing Director, Petitioner……………. Managing Director, Respondent……………. |
|
Hearing in the matter of Petition for resolution of matter pertaining to “Compensation for Delayed Payment of Invoices” for power supplied to Uttarakhand Power Corp. Ltd. (UPCL) from 214 MW (225 MW ISO) for Phase-I of 2×225 MW (450 MW ISO) Gas based Combined Cycle Power Plant at Kashipur, Uttarakhand for the FY 2018-19, FY 2019-20, FY 2020-21, FY 2021-22, FY 2022-23 and for the period 1st April, 2023 to 31st August, 2023. |
22.03.2024 | 11.30 AM |
M/s Sravanthi Energy Pvt. Ltd. Petitioner……………. Managing Director, Respondent……………. |
|
Hearing in the matter of Petition filed by UJVN Ltd. under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 43(1) of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023 seeking permission of the Commission to connect the Petitioner’s Suringad (5 MW) small hydro plant from 33/11 Darati S/s of UPCL. |
14.03.2024 | 11.30 AM |
UJVN Ltd. Petitioner……………. PTCUL |
|
Jan Goshthi |
09.02.2024 | 11.00 AM to 1:30 PM |
NA |
|
Reconsideration/Review of Order dated 17.10.2023 passed by the Commission in Petition No. 30 of 2023. |
01.02.2024 | 11.30 AM |
PTCUL M/s Bhilangana Hydro Power Ltd. |
|
Petition filed by UJVN Ltd. under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 43(1) of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023 seeking permission of the Commission to connect the Petitioner’s Suringad (5 MW) small hydro plant from 33/11 Darati S/s of UPCL. |
31.01.2024 | 11.30 AM |
UJVN Ltd. PTCUL Respondents……………. |
|
Hearing in the matter of Petition U/s 86(1)(f) of Electricity Act 2003, Regulation 59 of UERC (Conduct of Business) Regulations, 2014 and Regulation 103 & 104 of UERC (MYT) Regulations, 2021 for sale of power to third party from PPA capacity of 107 MW with M/s UPCL from 225 MW Gas Based Combined Cycle Power Plant, Kashipur. |
25.01.2024 | 11.30 AM |
Managing Director Petitioner……………. Managing Director, Respondent……………. |
|
Payment of deemed generation in respect of 12.6 MW Sarju-II SHP and 10.5 MW Sarju- III SHP alongwith delayed payment surcharge. |
06.10.2023 | 11.30 AM |
M/s Uttar Bharat Hydro Power Pvt. Ltd MD, UPCL |
|
Hearing in the matter of Petition for acquiring permission for categorization of Small Solar off Grid Irrigation Pump systems having a capacity of 2 kW to 10 kW under ‘Grid Interactive Small Solar PV Plants (GSPV)’ & to determine the tariff as per UERC’s RE Regulations, 2023. |
06.10.2023 | 11.00 AM |
Sh. Brijesh Kumar Tiwari, Petitioner……………. Managing Director, Chief Project Officer, Respondents……………. |
|
Hearing in the matter of Petition to review/reconsider the order dated 16th August 2023 passed by the Commission on the Suo-moto proceedings in the matter of request for seeking approval of revised payment terms for release of gas payments from M/s GIPL & M/s SEPL. |
06.10.2023 | 11.30 AM |
Managing Director, Petitioner……………. M/s Sravanthi Energy Pvt. Ltd. Respondents……………. |
|
Suo-moto proceeding initiated by the Commission for non-compliance of Commission’s directions issued vide Commission’s Order dated 06.07.2022 & 20.07.2022 pertaining to non-payment of penalty due w.r.t. delay in release of new LT connections. |
15.09.2023 | 11.30 AM |
1. MD, UPCL Respondents……………. |
|
Miscellaneous Petition challenging the Regulation No. 6.1 of the Uttarakhand Electricity Regulatory Commission (The Electricity Supply Code, Release of New Connections and Related Matters) Regulation, 2020, on the ground of the same being ultra-vires the mandatory provision of Section 56(1) of the Electricity Act, 2003 and the retrospective implication of the same, being used by UPCL in treating the Bill as a Bill cum Disconnection notice. |
15.09.2023 | 11.30 AM |
M/s Uttaranchal Iron & Ispat Ltd. MD, UPCL, |
|
Petition filed by M/s Bhilangana Hydro Power Ltd., under Section 86 read with Section 181 of the Electricity Act, 2003 read with the Order dated 20.06.2023 passed by the Hon’ble Uttarakhand High Court in WPMS 1829/2021 seeking for appropriate directions from Commission to amend the UERC (Terms and Conditions of Intra-State Open Access Regulations) 2015 |
07.08.2023 | 11.30 AM |
M/s Bhilangana Hydro Power Ltd. Petitioner……………. MD, PTCUL Respondent……………. |
|
Public Hearing in the matter of Draft UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2023. |
11.08.2023 | 11.30 AM |
All the Stakeholders…………….
|
|
In the matter of filing petition under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 50(6) of the Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018 & 2021 for recovery of under recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating station during the FY 2020-21, FY 2021-22 and FY 2022-23 in respect of Budhil Hydro Power Project (BHEP). |
01.08.2023 | 11.30 AM |
M/s Greenko Budhil Hydro Power Pvt. Ltd., …………… Petitioner Managing Director …………… Respondent |
|
Petition filed by M/s Bhilangana Hydro Power Ltd., under Section 86 read with Section 181 of the Electricity Act, 2003 read with the Order dated 20.06.2023 passed by the Hon’ble Uttarakhand High Court in WPMS 1829/2021 seeking for appropriate directions from Commission to amend the UERC (Terms and Conditions of Intra-State Open Access Regulations) 2015. |
01.08.2023 | 11.30 AM |
M/s Bhilangana Hydro Power Ltd. …………… Petitioner MD, PTCUL …………… Respondent |
|
Hearing in the matter of Petition seeking to allow approximate cumulative capacity of 246.5 MW to be allotted to eligible applicants against ground mounted solar power plants having capacity size of 20/25/50/100/200 KW under the scheme Mukhyamantri Saur Swarojgar Yojna at prefixed tariff of Rs. 4.49/kwh OR as per the gross generic tariff for Solar PV plants decided by the Commission for the financial year 2023-24 whichever is higher and subsequently fix such gross tariff for a tariff period of three years. |
03.07.2023 | 11.00 AM |
Chief Project Officer, …………… Petitioner Managing Director …………… Respondent |
|
Public Hearing in the matter of Draft UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023. |
13.06.2023 | 11.00 AM |
…………… All the stakeholders. |
|
Hearing in the matter of suo-moto proceedings w.r.t. request for seeking approval of revised payment terms for release of gas payments. |
31.05.2023 | 11.30 AM |
1. Managing Director 2. M/s Sravanthi Energy Pvt. Ltd. 3. Managing Director ……………Respondents |
|
Public Hearing in the matter of Petition seeking amendment in the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021 in compliance of the Electricity (Amendment) Rules, 2022 |
09.05.2023 | 11.30 AM |
Managing Director, |
|
In compliance of Hon’ble APTEL Order dated 27.03.2023 (IA No. 407 of 2023 in Appeal No. 275 of 2023 & IA Nos. 406 and 458 of 2023) in the matter of Petition filed by M/s Himalaya Hydro Private Ltd. Vs. UERC & Ors. |
04.05.2023 | 11.30 AM |
UJVN Ltd. ……………Respondents |
|
Hearing in the matter of Petitions filed by PTCUL for Investment Approval of Transmission Projects under UTSDIP Scheme under ADB Funding. |
13.04.2023 | 11.30 AM |
MD, PTCUL ……………Respondent |
|
Show Cause Notice-cum-Notice for Personal Hearing under Section 142 read with Section 149 of The Electricity Act, 2003, in the matter of non-compliance to Commission’s Orders/directions with regard to delay in commissioning of 220 kV Baram Sub-station and its associated line. |
13.04.2023 | 11.30 AM |
MD, PTCUL ……………Respondent |
|
Show Cause Notice-cum-Notice for Personal Hearing under Section 142 read with Section 149 of The Electricity Act, 2003, in the matter of non-compliance to Commission’s Orders/directions with regard to delay in commissioning of 220 kV Baram Sub-station and its associated line. |
14.03.2023 | 11.30 AM |
MD, PTCUL ……………Respondents |
|
Amendment Petition filed by UJVN Ltd. on dated 20.05.2022 seeking permission of the Commission to connect the Petitioner’s Suringad (5MW) SHP from 33 kV Darati S/s of UPCL. |
17.02.2023 | 11.30 AM |
UJVN Ltd. ……………Petitioner ……………Respondents |
|
Hearing in the matter of Petition for relaxation in balance quantum of Renewable Purchase Obligation of FY 2021-22 not met to the tune of 25.61 MU (Non-solar) and 350.49 MU (Solar) as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 and Application seeking amendment in the said Regulation in the light of new Order of Ministry of Power, GoI issued on dated 22.07.2022 read alongwith its Corrigendum dated 19.09.2022. |
17.01.2023 | 11.30 AM |
Managing Director, ……………Petitioner ……………Respondent |
|
Petition filed by UJVN Ltd. under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018 seeking permission of the Commission to connect the Petitioner’s Suringad (5 MW) small hydro plant from 33/11 Darati S/s of UPCL. |
18.01.2023 | 03.30 PM |
UJVN Ltd. ……………Petitioner |
|
Reconsider/Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for removal of difficulty and review of the Order dated 22.09.2021 passed by UERC in the matter of Hon’ble APTEL Order dated 02.03.2020 in Appeal No. 18 of 2016 pertaining to 22.5 MW SHP of M/s Swasti Power Ltd |
03.01.2023 | 11.30 AM |
Uttarakhand Power Corporation Ltd. (UPCL) ……………Respondent |
|
Hearing in the matter of Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid and due to loss of generation because of outages/interruptions of more than 50 hours in a year. |
03.01.2023 | 11.30 AM |
Shri Chandrakant Singh Rawat, (Innovative Solutions) |
|
Hearing in the matter of Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid and due to loss of generation because of outages/interruptions of more than 50 hours in a year. |
23.12.2022 | 11.30 AM |
Shri Chandrakant Singh Rawat, (Innovative Solutions) ……………Respondents |
|
Review/Reconsideration Petition filed by PTCUL under Regulation 54, 59 and 62 of the UERC (Conduct of Business) Regulations, 2014 r/w relevant provisions of Electricity Act 2003 for review of the order dated 14.10.2022 passed by the Commission in the matter of waiver of supervision charges for upgradation works of 220 kV D/C Mahuakhedaganj-Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity ACCC Conductor as per UERC Order dated 05.03.2021 |
23.12.2022 | 11.30 AM |
PTCUL M/s Sravanthi Energy Private Limited ……………Respondent |
|
Hearing in the matter of Review/Reconsideration Petition filed by PTCUL under Regulation 54, 59 and 62 of the UERC (Conduct of Business) Regulations, 2014 r/w relevant provisions of Electricity Act 2003 for review of the order dated 14.10.2022 passed by the Commission in the matter of waiver of supervision charges for upgradation works of 220 kV D/C Mahuakhedaganj-Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity ACCC Conductor as per UERC Order dated 05.03.2021. |
23.11.2022 | 11.30 AM |
PTCUL M/s Sravanthi Energy Private Limited ……………Respondent |
|
Hearing in the matter of Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP till 30.11.2022 or commissioning of 400 kV D/c Transmission line, whichever is earlier, for evacuating power from generating stations operating in Ravi Basin, Himachal Pradesh viz. SHP upto 31 MW and from 180 MW Bajoli Holi HEP upto 120 MW, using 2×315 MVA, 400/220/33 kV GIS Pooling Station at Lahal, 220 kV S/C transmission line from Lahal connecting to 220 kV side of S/s at Budhil HEP on the same Terms of Use (Alternative-A) as determined by the Commission vide Order dated 04.12.20202 read with Order dated 30.06.2021. |
09.11.2022 | 11.30 AM |
2. Chief Engineer (System Operation), 3. Sh. Sandeep Rajpurohit, ……………Petitioner 3. M/s Greenko Budhil Hydro Power Pvt. Ltd., ……………Respondents |
|
Hearing in the matter of Petition for approval of Provisional Tariff for Vyasi Hydro Power Project (2×60 MW) under Section 62 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Hon’ble Commission. |
09.11.2022 | 11.30 AM |
……………Petitioner ……………Respondent |
|
Hearing in the matter of Reconsider/Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for removal of difficulty and review of the Order dated 22.09.2021 passed by UERC in the matter of Hon’ble APTEL Order dated 02.03.2020 in Appeal No. 18 of 2016 pertaining to 22.5 MW SHP of M/s Swasti Power Ltd |
10.11.2022 | 11.30 AM |
……………Petitioner ……………Respondent |
|
Public Hearing in the matter of Petition filed by UPCL seeking approval for increasing the Continuous Supply Surcharge as approved by the Commission in the Tariff Order dated 31.03.2022 for FY 2022-23. |
14.10.2022 | 11.30 AM |
……………Petitioner & |
|
Miscellaneous application in the matter of compensation in accordance with Deemed generation due to late connectivity of the 500 MW Solar Power Plant with the Grid after commissioning of the Plant. Compensation in accordance with deemed generation due to loss of generation because of outages/interruptions of more than 50 hours in a year |
27.09.2022 | 11.00 AM |
……………Petitioner ……………Respondents |
|
Waiver of supervision charges for upgradation works of 220 kV D/C Mahuakhedaganj-Kashipur including LOLO of SEPL by replacement of ACSR Zebra Conductor with high capacity ACCC Conductor as per UERC Order dated 05.03.2021. |
27.09.2022 | 11.30 AM |
……………Petitioner |
|
Public Hearing in the matter of Petition filed by Uttarakhand Power Corporation Limited for ‘Revision in miscellaneous charges as approved vide UERC’s Tariff Order dated 31.03.2022 for FY 2022-23’. |
24.08.2022 | 11:30 AM |
……………Petitioner ……………Respondents |
|
Public Hearing in the matter of Petition filed by UPCL for seeking Removal of Difficulty in Implementation of Modified Time of Day Metering as provided in Clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23. |
24.08.2022 | 11:30 AM |
……………(Petitioner) & |
|
Hearing in the matter of: Unplanned and irregular load shedding/curtailment of power by Uttarakhand Power Corporation Limited during the period 01st of March 2022 to 30th June 2022 and being continued till date. |
24.08.2022 | 12:30 PM |
……………Petitioner UPCL |
|
Public Hearing in the matter of Petition seeking approval of the Commission on the Deviation in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost and compliance thereof to directives issued under Multi Year Tariff Order. |
22.08.2022 | 11:30 AM |
……………Petitioner ……………Respondents |
|
Hearing in the matter of Petition seeking adjustment of tariff for Tanga Small Hydro Power Project (5 MW) unit of Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated due to the catastrophic damage caused to the plant by the unprecedented natural calamity/ floods (Force Majeure event) that occurred on July 02, 2018, as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 14(7) of UERC RE Regulations, 2018, as amended from time to time. |
23.08.2022 | 11:30 AM |
;……………Petitioner Managing Director, ……………Respondents |
|
Hearing in the matter of Petition seeking adjustment of tariff for Motighat Small Hydro Power Project (5 MW) unit of Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated due to the catastrophic damage caused to the plant by the unprecedented natural calamity/ floods (Force Majeure event) that occurred on July 02, 2018, as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 14(7) of UERC RE Regulations, 2018, as amended from time to time. |
23.08.2022 | 11:30 AM |
……………Petitioner ……………Respondents |
|
Hearing in the matter of Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 (“Electricity Act”) read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 (“CBR Regulations, 2014”) seeking review of the Order dated 22.06.2022 passed in Petition No. 14 of 2022 relating to Application for approval of Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd. (“NVVNL”). |
23.08.2022 | 11:30 AM |
……………(Petitioner) |
|
Hearing in the matter of: Unplanned and irregular load shedding/curtailment of power by Uttarakhand Power Corporation Limited during the period 01st of March 2022 to 30th June 2022 and being continued till date. |
24.08.2022 | 11:00 AM |
……………(Petitioner) UPCL |
|
Hearing in the matter of Petition seeking grant of permission to connect 33 kV dedicated line from 15 MW Captive Solar Power Plant to the stepdown side of 132/33 kV switchyard of Kashi Vishwanath Steels Pvt. Ltd. at 33 kV level so that continuous support essentially required from the grid for reference voltage and frequency for synchronization of grid tied solar inverters be obtained. |
27.07.2022 | 11:00 AM |
……………Petitioner & ……………Respondents |
|
Public hearing in the matter of draft UERC (Standards of Performance) Regulations, 2022 |
26.07.2022 | 11:00 AM |
……………Respondents |
|
Hearing in the matter of: Suo-moto proceeding initiated under Section 142 and Section 146 read with Section 149 of The Electricity Act, 2003 in the matter of violation of Section 12(b) of the Electricity Act, 2003 and non-compliance of the directions of the Commission issued vide its Tariff Order dated 29.03.2017. |
22.06.2022 | 11:30 AM |
……………Respondents |
|
Hearing in the Matter of: Compliance of Reports/Plans/ Procedures by the Distribution Licensee as per the UERC (Distribution Code) regulations, 2018. |
22.06.2022 | 11:30 AM |
|
|
Public Hearing to decide on admissibility of the Petition for review of the Commission’s Tariff Order dated 31.03.2022 on the ARR & Tariff Petition for FY 2022-23 filed by UPCL. |
06.06.2022 | 11:30 AM |
Managing Director, ……………Petitioner |
|
Suo-moto proceedings initiated under Section 142 read with Section 149 of The Electricity Act, 2003 in the matter of non-compliance to Commission’s orders/directions with regard to delay in commissioning of 220 kV Baram Sub-station and its associated line. |
23.05.2022 | 11:30 AM |
|
|
Public Hearing in the matter of Applicability of Rate Schedule RTS-4A: Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017 (UPCL Vs. UERC & M/s Flex Foods Ltd.). |
20.05.2022 | 11:30 AM |
2. Sh. Naval Duseja, |
|
Hearing in the matter of Petition for issuing necessary directions to UPCL to withdraw invoices issued against the Petitioner imposing 25% additional Temporary Supply Tariff and issue revised invoices under RTS-5 consumer category. |
04.05.2022 | 11:30 AM |
M/s Dhanashree Agro Products Pvt. Ltd., ……………Petitioner Managing Director, |
|
Hearing in the matter of Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP for evacuating power from generating stations operating in Ravi Basin, Himachal Pradesh viz. SHP upto 31 MW and from 180 MW Bajoli Holi HEP upto 120 MW, using 2×315 MVA, 400/220/33 kV GIS Pooling Station at Lahal, 220 kV S/C transmission line from Lahal connecting to 220 kV side of S/s at Budhil HEP on the same Terms of Use (Alternative-A) as determined by the Commission vide Order dated 04.12.20202 read with Order dated 30.06.2021. |
19.04.2022 | 11:30 AM |
1. General Manager (Projects), 2. Chief Engineer (System Operation), 3. Sh. Sandeep Rajpurohit ……………Petitioners 1. Managing Director, 2. Chief Engineer, 3. M/s Greenko Budhil Hydro Power Pvt. Ltd., ……………Respondents |
|
Hearing in the matter of Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar generating project of the Petitioner. |
19.04.2022 | 11:30 AM |
M/s Parihar Construction, 1. Managing Director, 2. Managing Director, 3. Chief Project Officer ……………Respondents |
|
Hearing in the matter of Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar generating project of the Petitioner. |
19.04.2022 | 11:30 AM |
Saraswati Devi, ……………Petitioners 1. Managing Director, 3. Chief Project Officer ……………Respondents |
|
Hearing in the matter of Petition seeking extension of Control Period of the Benchmark Capital Cost & Generic Tariff as declared by the Commission vide its Orders dated 11.05.2020, 30.09.2020 and 05.10.2020 till March, 2023 for installation of Solar PV Power Plants under the scheme of Mukhyamantri Saur Swarojgar Yojna. |
19.04.2022 | 11:30 AM |
Chief Project Officer Managing Director, |
|
Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018 seeking permission of the Commission to connect the Petitioner’s Suringad (5 MW) small hydro plant from 33/11 Darati S/s of UPCL. |
11.03.2022 | 12.00 Noon. |
Managing Director, 1. Managing Director,
2. Managing Director, 3. Managing Director, ……………Respondent(s) |
|
Miscellaneous Petition, inter alia amongst other grounds concerning refund of MDC/LPS charges by illegal disconnection and for determining whether Minimum Demand Charges/ Late Payment Surcharge can be imposed, if power supply is disconnected u/s 56(1), without proper and clear 15 days notice u/s 181 r/w Section 50 of the Indian Electricity Act, 2003 |
11.03.2022 | 11.30 AM |
M/s Uttaranchal Iron & Ispat Ltd.,
……………Petitioner ……………Respondent |
|
Personal Hearing in the Matter of Suo-moto proceedings initiated by the Commission in the matter of non-compliance of the Commission’s directions issued vide letter dated 01.01.2021 pertaining to submission of Periodical Reports as per provisions of the Regulations and in the matter of Petition for extension of time for compliance of directions given by Hon’ble Commission vide order dated 07.01.2020 passed in the matter of relaxing/waiving or varying the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of FY 2008-09 to FY 2018-19 and upto Aug-2019 and for suspension of Standards of Performance during the Covid-19 pandemic period and accordingly waive the requirement of submitting various periodical reports. |
23.02.2022 | 11:30 AM |
MD, UPCL |
|
Personal Hearing under Section 142 read with Section 146 and Section 149 of the Electricity Act, 2003 in the Matter of non-compliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the UERC (The Electricity Supply Code, Release of New Connections and Related matters) Regulations, 2020 in the matter of ‘Availability of Three Phase Energy Meters’. |
23.02.2022 | 11:30 AM |
MD, UPCL |
|
Personal Hearing in the Matter of Suo-moto proceedings initiated by the Commission in the matter of non-compliance of the Commission’s directions issued vide letter dated 01.01.2021 pertaining to submission of Periodical Reports as per provisions of the Regulations and in the matter of Petition for extension of time for compliance of directions given by Hon’ble Commission vide order dated 07.01.2020 passed in the matter of relaxing/waiving or varying the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of FY 2008-09 to FY 2018-19 and upto Aug-2019 and for suspension of Standards of Performance during the Covid-19 pandemic period and accordingly waive the requirement of submitting various periodical reports. |
03.02.2022 | 11.30 AM |
MD, UPCL ……………Respondent |
|
Personal Hearing under Section 142 read with Section 146 and Section 149 of the Electricity Act, 2003 in the Matter of non-compliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the UERC (The Electricity Supply Code, Release of New Connections and Related matters) Regulations, 2020 in the matter of ‘Availability of Three Phase Energy Meters’.. |
03.02.2022 | 11.30 AM |
MD, UPCL ……………Respondent |
|
Hearing in the matter of Petition under Section 79 of the Electricity Act, 2003, read with Article 13 (“Change in Law”) of the Power Purchase Agreement (“PPA”) dated 19.03.2012 executed between M/s Uttam Sugar Mills Ltd. and Uttarakhand Power Corporation Ltd. |
30.11.2021 | 11.30 AM |
Mr. Lokendra Singh Lamba, …………..Petitioner Managing Director, ……………Respondent |
|
Hearing in the matter of Petition under Section 146 of the Electricity Act, 2003 against UPCL authorities for non-implementation and non-compliance of the Order dated 24.11.2020 passed by the Electricity Ombudsman Uttarakhand. |
30.11.2021 | 11.30 AM |
Shri Vivek Agarwal S/o Mahendra Kumar, …………..Petitioner 1). Managing Director, ……………Respondent |
|
Hearing in the matter of Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project (hereinafter referred to as “Budhil HEP” or “M/s GBHEP”) for evacuating power from Generating Stations operating in Ravi Basin, Himachal Pradesh viz. Small Hydro Electric Projects (hereinafter referred to as “SHEPs”) of upto 26 MW and from Bajoli Holi HEP (hereinafter referred to as “BHHEP”) of upto 60 MW, using 2×315 MVA, 400/220/33 kV GIS Pooling Station at Lahal, 220 kV S/C transmission line (1.8 km) from Lahal connecting to 220 kV side of S/S at Budhil HEP on the same Terms of Use (Alternative-A) as determined by the Commission vide its Order dated 04.12.2020 read with Order dated 30.06.2021. |
16.11.2021 | 11.30 AM |
1. General Manager (Projects), 2. Chief Engineer (System Operation), 3. Sh. Sandeep Rajpurohit …………..Petitioners 1. Managing Director, 2. M/s Greenko Budhil Hydro Power Pvt. Ltd. 3. Chief Engineer, ……………Respondents |
|
Hearing in the matter of Petition under Section 79 of the Electricity Act, 2003, read with Article 13 (“Change in Law”) of the Power Purchase Agreement (“PPA”) dated 19.03.2012 executed between M/s Uttam Sugar Mills Ltd. and Uttarakhand Power Corporation Ltd. |
16.11.2021 | 11.30 AM |
Mr. Lokendra Singh Lamba, …………..Petitioner Managing Director, ……………Respondent |
|
Petition to Hon’ble Commission for resolution of matter pertaining to Deviation Settlement Mechanism (“DSM”) Claim for 214 MW (225 MW ISO) for Phase I of 2×225 MW (450 MW ISO) Gas Based Combined Cycle Power Plant at Kashipur, Uttarakhand to be filed by Sravanthi Energy Pvt. Ltd. under Section 86 of the Electricity Act, 2003 read with Regulation 59 of the Uttarakhand Electricity Regulatory Commission (Conduct of Business) Regulations, 2014 and the Regulations 13 & 16 of UERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2017. |
12.10.2021 | 11.30 AM |
M/s Sravanthi Energy Pvt. Ltd. …………..Petitioner 1) SLDC ……………Respondents |
|
Petition for DSM claim by SLDC for 107 MW from 225 MW Gas Based Combined Cycle Power Plant, at Mahuakhedaganj, Kashipur, District-Udhamsinghnagar, Uttarakhand. |
12.10.2021 | 11.30 AM |
M/s Gama Infraprop Pvt. Ltd. …………..Petitioner 1) SLDC ……………Respondents |
|
Hearing in the matter of Review Petition for review of the Order dated 11.06.2021 passed by the Commission in Petition No. 21 of 2020 in accordance with Section 94(f) of the Electricity Act, 2003 read with Section 114 & Order 47 of the Civil Procedure Code, 1908. |
21.09.2021 | 11.30 AM |
Sh. Digamber Singh Bisht, …………..Petitioner ……………Respondents |
|
Application under Regulations 59 of UERC (Conduct of Business) Regulations, 2014 seeking to place on record the revised calculations of the claims on behalf of the Petitioner (M/ s Swasti Power Ltd.) against UPCL. |
14.09.2021 | 11.00 AM |
M/s Swasti Power Limited …..Petitioner Uttarakhand Power Corporation Ltd. ……Respondent |
|
Hearing in the matter of Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. in terms of the directions contained in Order of the Commission dated 08.07.2016 and also as per Section 61 an 62 of the Electricity Act, 2003, read with Regulation 16(3) & 25 of UERC (Tariff and other terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulation, 2010, as amended from time to time and Regulation 3 & 4 (4) of the UERC (Terms and Conditions for Truing Up of Tariff) Regulations, 2008. |
07.09.2021 | 11.00 AM |
Sh. Arun Gupta, …..Petitioner Managing Director, ……Respondent |
|
Public hearing in the matter of Draft UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021. |
17.08.2021 | 11.30 AM |
All the Stakeholders. |
|
Online Hearing in the matter of: |
28.07.2021 | 11.30 AM |
M/s Swasti Power Limited, …..Petitioner Uttarakhand Power Corporation Ltd. |
|
Online Hearing in the matter of: |
15.06.2021 | 11.30 AM |
M/s Himalaya Hydro Private Limited. …..Petitioner Uttarakhand Power Corporation Ltd. (UPCL) Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) UJVN Ltd., “UJJWAL” |
|
Hearing in the matter of: & Interlocutory Application seeking directions to the Respondent No. 1 to maintain status quo qua 33/11 kV Darati Sub-station, thereby directing exclusive connectivity of the Petitioner’s SHP’s as well as exclusive evacuation of power from the SHPs of the Petitioner, through 33/11 kV Darati sub-station until final disposal of the instant Petition. |
13.04.2021 | 11.30 AM |
M/s Himalaya Hydro Private Limited. Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) |
|
Hearing in the matter of Petition seeking approval to extend the Control Period of the Benchmark Capital cost & generic tariff as declared by the Commission vide its Orders dated 01.02.2019, 18.09.2019 and 23.06.2020 upto August 2021 for 283 nos. Solar PV Power Plants (cumulative capacity of 203.75 MW) and Solar PV Plant developers who have been allowed to execute PPA with UPCL with zero CFA for fulfillment of RPO compliance of UPCL. |
30.03.2021 | 11.00 AM |
Shri A.K. Tyagi,
…..Petitioner …… Respondent |
|
Hearing in the matter of Petition under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 1(3), 11(1) and 12 of the Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018, for necessary directions to UPCL for release of interest on delay in payments of its energy invoices for the FY 2018-19 & FY 2019-20. |
23.03.2021 | 11.00 AM |
M/s Sravanthi Energy Pvt. Ltd.
…..Petitioner …… Respondent |
|
Hearing in the matter of: |
12.03.2021 | 11.30 AM |
M/s Himalaya Hydro Private Limited. |
|
Hearing in the matter of Application seeking approval of Uttarakhand Electricity Regulatory Commission (UERC) for investment on the work of construction of 10 nos. 33/11 KV GIS Substations under Integrated Power Development Scheme (IPDS) Project of Ministry of Power, Govt. of India. |
09.03.2021 | 11.30 AM |
UPCL |
|
Hearing in the matter of Petition for seeking carry forward of expected surplus of 320.62 MU (non-solar) and expected deficit of 110.28 MU (Solar) Renewable Purchase Obligation of FY 2020-21 as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulation 2010. |
09.03.2021 | 11.30 AM |
Managing Director …..Petitioner Shri A.K. Tyagi |
|
Online Hearing in the matter of Application seeking approval of Uttarakhand Electricity Regulatory Commission (UERC) for investment on the work of construction of 10 nos. 33/11 KV GIS Substations under Integrated Power Development Scheme (IPDS) Project of Ministry of Power, Govt. of India. |
29.01.2021 | 11.00 AM |
UPCL |
|
Online Hearing in the matter of Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand |
05.01.2021 | 11.00 AM |
UPCL UJVN Ltd. …..Respondent |
|
Online Hearing in the matter of: To grant permanent connectivity for 214MW (225 MW ISO) for Phase II of SEPL Power Project without any state transmission charges/losses upto Intra-State connection point (Kashipur 400 KV station) and permission for upgradation of 220 KV transmission line (Double Ckt.) Mahuakhedaganj S/s to Kashipur S/s at the cost of SEPL. |
22.12.2020 | 11.00 AM |
M/s Sravanthi Energy Private Limited, Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) …..Respondent |
|
Online Hearing in the matter of Petition under Section 86 (1)(a), Section 86(1)(f) read with Section 61(d) seeking directions to State Load Despatch Centre of Uttarakhand to consider Scheduled Capacity as the Declared Capacity in accordance with Section 32(2)(a) of the Electricity Act, 2003. |
22.12.2020 | 11.00 AM |
M/s Greenko Budhil Hydro Power Pvt. Ltd., …..Petitioner
1. Chief Engineer, …..Respondents |
|
Online Hearing in the matter of Petition for permanent connectivity of 107 MW from 214 MW Gas based Combined Cycle Power Plant of M/s Gama Infraprop Pvt. Ltd., at 220 kV S/s Mahuakhedaganj, Kashipur. |
10.12.2020 | 11.00 AM |
M/s Gama Infraprop Pvt. Ltd Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) …..Respondent |
|
Online Hearing in the matter of Review Petition under Section 94 of the Electricity Act, 2003 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for the Tariff Order dated 18.04.2020 issued by the Commission with respect to the truing up of Non-Tariff Income for the FY 2018-19. |
02.12.2020 | 11.00 AM |
M/s Sravanthi Energy Pvt. Ltd.
Managing Director, …..Respondent |
|
Online Hearing in the matter of: To grant permanent connectivity for 214MW (225 MW ISO) for Phase II of SEPL Power Project without any state transmission charges/losses upto Intra-State connection point (Kashipur 400 KV station) and permission for upgradation of 220 KV transmission line (Double Ckt.) Mahuakhedaganj S/s to Kashipur S/s at the cost of EPL. |
26.11.2020 | 11.00 AM |
M/s Sravanthi Energy Private Limited …..Petitioner Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) …..Respondent |
|
Online Hearing in the matter of: Petition for permanent connectivity of 107 MW from 214 MW Gas based Combined Cycle Power Plant of M/s Gama Infraprop Pvt. Ltd., at 220 kV S/s Mahuakhedaganj, Kashipur. |
26.11.2020 | 11.30 AM |
M/s Gama Infraprop Pvt. Ltd …..Petitioner Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) …..Respondent |
|
Online Hearing in the matter of Petition under Section 86 (1)(a), Section 86(1)(f) read with Section 61(d) seeking directions to State Load Despatch Centre of Uttarakhand to consider Scheduled Capacity as the Declared Capacity in accordance with Section 32(2)(a) of the Electricity Act, 2003. |
24.11.2020 | 11.00 AM |
M/s Greenko Budhil Hydro Power Pvt. Ltd.
1. Managing Director,
2. Chief Engineer, …..Respondents |
|
Online Hearing in the matter of Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. |
24.11.2020 | 11.00 AM |
UPCL
UJVN Ltd. |
|
Online hearing in the matter of revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees and Rs. 55,080/- for use of land ignoring the mandate of law as enshrined in works of Licensee Rules 2006 |
10.11.2020 | 11.00 AM |
Shri Hitler Saini, S/o Late Shri Satish Kumar and Ors. …..Petitioner
1. The Executive Engineer, …..Respondent |
|
Online Hearing in the matter of revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur as the land belonging to Gram Sabha and payment of compensation of Rs. 1,91,325 to the Gram Sabha. |
10.11.2020 | 11.30 AM |
1. Shri Chandra Kiran S/o Shri Jagpal Singh …..Petitioners
1. The Executive Engineer, …..Respondents |
|
Online hearing in the matter of revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter of payment of compensation of Rs. 2,35,549/- for damage to trees and Rs. 55,080/- for use of land ignoring the mandate of law as enshrined in works of Licensee Rules 2006 |
27.10.2020 | 11.00 AM |
Shri Hitler Saini, S/o Late Shri Satish Kumar and Ors. …..Petitioner
1. The Executive Engineer, …..Respondent |
|
Online Hearing in the matter of revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur as the land belonging to Gram Sabha and payment of compensation of Rs. 1,91,325 to the Gram Sabha. |
27.10.2020 | 11.30 AM |
1. Shri Chandra Kiran S/o Shri Jagpal Singh …..Petitioner
1. The Executive Engineer, …..Respondent |
|
Online Hearing in the matter of revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur as the land belonging to Gram Sabha and payment of compensation of Rs. 1,91,325 to the Gram Sabha. |
27.10.2020 | 11.30 AM |
1. Shri Chandra Kiran S/o Shri Jagpal Singh …..Petitioner
1. The Executive Engineer, …..Respondent |
|
Online hearing in the matter of application seeking review of the Tariff Order issued by the Commission on 18.04.2020 on the Annual Revenue Requirement and Tariff Petition of PTCUL for FY 2020-21 |
21.10.2020 | 11.00 AM |
Power Transmission Corporation of Uttarakhand Ltd. …..Petitioner
Uttarakhand Power Corporation Ltd. |
|
Online Hearing in the matter of Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. |
21.10.2020 | 11.00 AM |
UPCL …..Petitioner
UJVNL Ltd. |
|
Online hearing in the matter of Petition for extension of time for compliance of directions given by Hon’ble Commission vide order dated 07/01/2020 passed in the matter of relaxing/waiving or varying the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of F.Y. 2008-09 to F.Y. 2018-19 and upto Aug-2019 and for suspension of Standards of Performance during the Covid-19 pandemic period and accordingly waive the requirement of submitting various periodical reports. |
13.10.2020 | 11.00 AM |
Uttarakhand Power Corporation Ltd., Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. …..Petitioner |
|
Online Hearing in the matter of Petition for issuing necessary directions for fixing the electricity rate as per the FY 2015-16 for the allocated Solar Power Plants with respect to the advertisement date 01.01.2016 published by UREDA in FY 2015-16 and 40% additional tariff for the Solar PV plants installed in the hilly terrain of Uttarakhand. |
13.10.2020 | 11.30 AM |
1. Sh. Dhirender Singh Rawat, 2. Sh. Digamber Singh Bisht, …..Petitioners
1. Managing Director, …..Respondents |
|
Online Hearing in the matter of Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corp. Ltd. and Uttarakhand Project Development & Construction Corp. Ltd. (UPDCC Ltd.). |
13.10.2020 | 11.00 AM |
Managing Director, …..Petitioner
M/s Uttarakhand Project Development & Construction Corp. Ltd. …..Respondent |
|
Online Hearing in the matter of Petition for issuing necessary directions for fixing the electricity rate as per the FY 2015-16 for the allocated Solar Power Plants with respect to the advertisement date 01.01.2016 published by UREDA in FY 2015-16 and 40% additional tariff for the Solar PV plants installed in the hilly terrain of Uttarakhand. |
14.09.2020 | 11:00 AM |
1. Sh. Dhirender Singh Rawat, 2. Sh. Digamber Singh Bisht, …..Petitioners
1. Managing Director, 2. Shri A.K. Tyagi …..Respondents |
|
Online hearing in the matter of Petition for extension of time for compliance of directions given by Hon’ble Commission vide order dated 07/01/2020 passed in the matter of relaxing/waiving or varying the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of F.Y. 2008-09 to F.Y. 2018-19 and upto Aug-2019 and for suspension of Standards of Performance during the Covid-19 pandemic period and accordingly waive the requirement of submitting various periodical reports. |
14.09.2020 | 11:00 AM |
UPCL |
|
Online Hearing in the matter of Application seeking amendment in UERC Tariff Regulations, 2018. |
03.09.2020 | 11:00 AM |
Managing Director, …..Petitioner |
|
Online Hearing in the matter of Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand |
03.09.2020 | 11:00 AM |
UPCL …..Respondent |
|
Online Hearing in the matter of Application seeking approval of UERC for investment on under grounding of HT & LT Electrical Networks in Haridwar Town comes under IPDS Program- a flagship program of MoP under GoI. |
25.08.2020 | 11:30 AM |
UPCL |
|
Online Hearing in the matter of Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its order dated 11.05.2020, upto March 2022 for upcoming 10,000 nos. Solar PV Power Plants of capacity 25KWp each (cumulative capacity of 250 MW). |
18.08.2020 | 11:00 AM |
Shri A.K. Tyagi …..Petitioner
1. Managing Director, …..Respondent |
|
Online Hearing in the matter of Petition seeking increase in ceiling limit of 1 MW applicable to grid connected rooftop and solar power plants to 2 MW under RE Regulations, 2018 for net metering arrangement. |
18.08.2020 | 11:30 AM |
Garrison Engineer, …..Petitioner
1. Managing Director, 2. Shri A.K. Tyagi …..Respondents |
|
Online Hearing in the matter of Petition for development of 2 MW Solar Project located at Birpur, Dehradun which is under progress and to be connected at 33/11 kV Anarwala (MRS) Dehradun Cantt, Permission for connecting 2 MW Plant output to the 33/11 kV Grid of UPCL at Anarwala may be granted on Net Metering basis under Regulation 51 and 52 of RE Regulations, 2018. |
18.08.2020 | 11:30 AM |
Garrison Engineer, …..Petitioner
1. Managing Director, 2. Shri A.K. Tyagi …..Respondents |
|
Online Hearing in the matter of Application for determination of Term of use for Utilization of 220 kV S/c Dedicated Transmission Line of M/s Greenko Budhil Hydro Electrical Project for evacuating power from Generating Station operating in Ravi Basin, Himachal Pradesh viz. Small Hydro Electric Project of up to 26 MW by connecting 2×315 MVA 400/220/33 kV GIS Pooling Station at Lahal, Himachal Pradesh to 220 kV side of S/S at Budhil HEP through a 220 kV S/C transmission line (1.8 km) from Lahal to Budhil. |
14.08.2020 | 11:00 AM |
1. General Manager (Projects), 2. Chief Engineer (System Operation), …..Petitioners
1. Managing Director, 2. Chief Engineer, 3. M/s Greenko Budhil Hydro Power Pvt. Ltd. …..Respondents |
|
Online Hearing in the matter of Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. |
29.05.2020 | 11:00 AM |
UPCL …..Petitioner UJVN Ltd. …Respondents |
|
Online Hearing in the matter of Petition seeking increase in ceiling limit of 1 MW applicable to grid connected rooftop and solar power plants to 2 MW under RE Regulations, 2018 for net metering arrangement. |
26.05.2020 | 11:00 AM |
Garrison Engineer,
Managing Director, |
|
Online Hearing in the matter of Petition for development of 2 MW Solar Project located at Birpur, Dehradun which is under progress and to be connected at 33/11 kV Anarwala (MRS) Dehradun Cantt, Permission for connecting 2 MW Plant output to the 33/11 kV Grid of UPCL at Anarwala may be granted on Net Metering basis under Regulation 51 and 52 of RE Regulations, 2018. |
26.05.2020 | 11:00 AM |
Garrison Engineer, …..Petitioner
Managing Director, …Respondents |
|
Representation/Petition under Section 67(4) Of The Electricity Act, 2003 |
14.02.2020 | 11:00 AM |
M/s Hero Reality Pvt. Ltd.
(1) MD, UPCL |
|
Petition for seeking approval of the Commission for the investment on the Implementation of Real Time Data Acquisition System (RTDAS) for SAIFI/SAIDI measurement at 11 kV feeder level of 66 non SCADA towns of UPCL under Integrated Power Development Scheme (IPDS) of Ministry of Power, Govt. of India. |
14.02.2020 | 11:00 AM |
MD, UPCL |
| Hearing in the matter of Petition seeking Review of the order of the Commission dated April, 10, 2019 in petition no. 31 of 2017 seeking determination of project specific tariff for Tanga Hydro Power Project (5 MW) unit of M/s Himalaya Hydro Pvt. Ltd., under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 54 of the UERC (Conduct of Business) Regulation 2014. | 03.09.2019 | 11.00 AM | Shri K.V. Vikram Reddy, Managing Director, M/s Himalaya Hydro Pvt. Ltd. Plot No. 179, MLA & MPs Colony, Road No. 10-C, Jubilee Hills, Hyderabad-500033 (Petitioner) Managing Director, |
| Hearing in the matter of Petition for approval of Tariff rate revision from 70% CFA to Non CFA tariff rates for small solar plants, which already have 25 years PPA with UPCL, under the “Scheme for development of Grid Interactive Rooftop and Small Solar PV Power Projects-2016” for Residential/Institution/ Social Sector, published on 29.09.2016, under Jawaharlal Nehru National Solar Mission. | 03.09.2019 | 11.00 AM | Mr. R.K. Bahuguna, President, Akshay Urja Association, Chakrata Road, Dehradun Pin code- 248006 (Petitioner) Managing Director, |
| Hearing in the matter of Petition for seeking carry forward of surplus of 139.00 MU (Non-Solar) Renewable Purchase Obligation of FY 2018-19 as per the provision of UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010. | 03.09.2019 | 11.00 AM | Managing Director, Uttarakhand Power Corporation Ltd., Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. (Petitioner) Shri A.K. Tyagi |
|
Hearing in the matter of Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on open access Power purchased by M/s Kashi Vishwanath Textile (P) Ltd. |
09.09.2019 | 11:00 AM |
M/s Kashi Vishwanath Textile Mill (P) Ltd.,
Managing Director, UPCL |
|
Hearing in the matter of Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide its Order dated 07.06.2019, upto October, 2020 for upcoming Solar PV Power Plants (cumulative capacity of 52 MW). |
09.09.2019 | 11:00 AM |
Shri A.K. Tyagi
Managing Director, |
|
Public Hearing in the matter of Application seeking approval for recovery of power purchase cost incurred in excess of the approved power purchase cost for FY 2018-19. |
15.10.2019 | 11:00 AM |
Managing Director,
& |
|
Hearing in the matter of Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 signed between Parties for Procurement of 107 MW of power on long term basis from 225 MW (ISO) Gas Based Combined Cycle Power Project in Village Mahuakhera Ganj, Kashipur, Distt. U.S. Nagar, Uttarakhand. |
22.10.2019 | 11:00 AM |
Sh. A.K. Jain,
Managing Director, |
|
Hearing in the matter of filing of Petition for determination of Project Specific Tariff for Dunao Small Hydro Power Station (2 X 750 kW) of UJVN Ltd. under Section 62 and 86 of the Electricity Act, 2003 read with the relevant Regulations, Orders and Guidelines of the Commission. |
22.10.2019 | 11:00 AM |
Managing Director
Managing Director, |
|
Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of F.Y. 2008-09 to F.Y. 2018-19 and upto Aug-2019. |
22.10.2019 | 11:00 AM |
MD, UPCL |
|
Hearing in the matter of Petition on Selection of Developer(s) for setting of 200 MW Aggregate Capacity Grid Connected Solar PV Power Projects in the Hilly region of Uttarakhand for procurement of power on long term basis by Uttarakhand Power Corporation Ltd. through Tariff Based Competitive Bidding Process Under Type-I Project of “Uttarakhand Solar Energy Policy-2013’(Amended- 2018). |
14.11.2019 | 11:00 AM |
Sh. Amit Kumar (Petitioner) Managing Director, Shri A.K. Tyagi |
|
Representation/Petition under Section 67(4) Of The Electricity Act, 2003 |
14.11.2019 | 11:00 AM |
M/s Hero Reality Pvt. Ltd. |
|
Hearing in the matter of: Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to component A, that is, regarding to transmission charges for the use of intra-State transmission system for transmission of power from Bhilangana-III to Uttarakhand Power Corporation Ltd. through Tata Power Trading Company Ltd. |
15.11.2019 | 11:00 AM |
M/s Bhilangana Hydro Power Ltd.
Power Transmission Corporation of Uttarakhand Ltd., (PTCUL) |
|
Hearing in the matter of: Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Pvt. Ltd. |
15.11.2019 | 11:00 AM |
M/s Utttar Bharat Hydro Power Pvt. Ltd.
Uttarakhand Power Corporation Ltd. (UPCL) |
|
Hearing in the matter of Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd. . |
13.12.2019 | 11:00 AM |
Sh. Naresh Goel,
Managing Director, |
|
Hearing in the matter of Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in respect of termination of Power Purchase Agreement dated 01.03.2017 signed between Parties for Procurement of 107 MW of power on long term basis from 225 MW (ISO) Gas Based Combined Cycle Power Project in Village Mahuakhera Ganj, Kashipur, Distt. U.S. Nagar, Uttarakhand. |
28.01.2020 | 11:00 AM |
Sh. A.K. Jain, ….Petitioner
Managing Director, …… Respondents |
|
Hearing in the matter of Petition to extend the settlement of Net Energy from billing period to yearly basis of captive use Rooftop Solar PV generator (Govt. Institutions/ Organization, Private Institutions and Commercial and Industrials) who is getting the NOC from UPCL for Grid connectivity and Net metering by UERC vide its order UERC/6/TF-338/17-18/2017/1241 dated 01/11/2017. |
02.03.2020 | 11:00 AM |
Shri A.K. Tyagi …..Petitioner Managing Director, Venue :- Court Room, UERC |
|
Hearing in the matter of Petition for recovery of charges collected by UJVN Ltd. for supply of electricity made to the consumers of the State of Uttarakhand. |
23.03.2020 | 11:00 AM |
UPCL UJVN Ltd. |
|
Hearing in the matter of Petition seeking increase in ceiling limit of 1 MW applicable to grid connected rooftop and solar power plants to 2 MW under RE Regulations, 2018 for net metering arrangement. |
21.04.2020 | 11:00 AM |
Garrison Engineer, …..Petitioner Managing Director, …Respondents |
|
Hearing in the matter of Petition for development of 2 MW Solar Project located at Birpur, Dehradun which is under progress and to be connected at 33/11 kV Anarwala (MRS) Dehradun Cantt, Permission for connecting 2 MW Plant output to the 33/11 kV Grid of UPCL at Anarwala may be granted on Net Metering basis under Regulation 51 and 52 of RE Regulations, 2018. |
21.04.2020 | 11:00 AM |
Garrison Engineer, …..Petitioner Managing Director, …Respondents |