Repealed Regulations
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| UERC (Release of new LT Connections, Enhancement and Reduction of Loads) Regulations,2007.(English) |
Accessible Version :
View(505 KB)
|
|
| UERC (Conduct of Business) Regulation, 2004.(Hindi) |
Accessible Version :
View(1 MB)
|
|
| Extension of applicability of following Regulations for a period upto 30.04.2012, unless reviewed earlier or extended further, beyond their present period of applicability(English) |
Accessible Version :
View(64 KB)
|
|
| Extension of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004 for a period upto 30.06.2011 (Hindi) |
Accessible Version :
View(50 KB)
|
|
| Order on extension for a period up to 31.12.2009 of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004 (Hindi) |
Accessible Version :
View(16 KB)
|
|
| Extension of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004 for a period upto 30.06.2011 (English) |
Accessible Version :
View(64 KB)
|
|
| Extension of applicability of Terms and Conditions for determination of Generation, Transmission and Distribution Tariff Regulations-2004 for a period upto 30.11.2011(Hindi) |
Accessible Version :
View(51 KB)
|
|
| Extension of applicability of Terms and Conditions for determination of Generation, Transmission and Distribution Tariff Regulations-2004 for a period upto 30.11.2011(English) |
Accessible Version :
View(65 KB)
|
|
| Extension of applicability of following Regulations for a period upto 30.04.2012, unless reviewed earlier or extended further, beyond their present period of applicability.(Hindi) |
Accessible Version :
View(50 KB)
|
|
| UERC (Guidelines for establishment of Forum for Redressal of Grievances of the Consumers) Regulations, 2004.(English) |
Accessible Version :
View(27 KB)
|
|
| UERC (Terms & Condition for determination of Hydro generation Tariff) Regulation, 2004.(Hindi) |
Accessible Version :
View(571 KB)
|
|
| UERC (Terms & Condition for determination of Hydro generation Tariff) Regulation, 2004.(English) |
Accessible Version :
View(623 KB)
|
|
| UERC (Terms & Condition for Open Access in Distribution) Regulation, 2004.(Hindi) |
Accessible Version :
View(122 KB)
|
|
| UERC (Terms & Condition for Open Access in Distribution) Regulation, 2004.(English) |
Accessible Version :
View(135 KB)
|
|
| UERC (Terms & Condition for determination of Distribution Tariff) Regulation, 2004.(Hindi) |
Accessible Version :
View(484 KB)
|
|
| UERC (Terms & Condition for determination of Distribution Tariff) Regulation, 2004.(English) |
Accessible Version :
View(397 KB)
|
|
| UERC (Terms & Condition for determination of Transmission Tariff) Regulation, 2004.(Hindi) |
Accessible Version :
View(780 KB)
|
|
| UERC (Terms & Condition for determination of Transmission Tariff) Regulation, 2004.(English) |
Accessible Version :
View(582 KB)
|
|
| UERC (Conduct of Business) Regulation, 2004.(English) |
Accessible Version :
View(1 MB)
|
|
| Order in the matter of Small Hydro Generating Units (upto 25 MW).(Hindi) |
Accessible Version :
View(38 KB)
|
|
| Order in the matter of Small Hydro Generating Units (upto 25 MW).(English) |
Accessible Version :
View(39 KB)
|
|
| UERC (Terms & Conditions for Determination of Distribution Tariff) (First Amendment) Regulation, 2006.(Hindi) |
Accessible Version :
View(34 KB)
|
|
| UERC (Terms & Conditions for Determination of Distribution Tariff) (First Amendment) Regulation, 2006.(English) |
Accessible Version :
View(36 KB)
|
|
| UERC (Terms & Conditions for Determination of Hydro Generation Tariff)(First Amendment) Regulation, 2006.(Hindi) |
Accessible Version :
View(36 KB)
|
|
| UERC (Terms & Conditions for Determination of Hydro Generation Tariff)(First Amendment) Regulation, 2006.(English) |
Accessible Version :
View(32 KB)
|
|
| UERC (Release of new LT Connections, Enhancement and Reduction of Loads) Regulations,2007.(Hindi) |
Accessible Version :
View(396 KB)
|
|
| Approach to Initial Tariff for New Hydro Generating Stations with capacity above 1 MW and up to 25 MW.(English) |
Accessible Version :
View(492 KB)
|
|
| Approach to Initial Tariff for New Hydro Generating Stations with capacity above 1 MW and up to 25 MW.(Hindi) |
Accessible Version :
View(177 KB)
|
|
| UERC (Terms and Conditions for Determination of Tariff for Bagasse based Co-generation Projects) Regulations, 2007.(Hindi) |
Accessible Version :
View(1 MB)
|
|
| UERC (Terms and Conditions for Determination of Tariff for Bagasse based Co-generation Projects) Regulations, 2007.(English) |
Accessible Version :
View(1 MB)
|
|
| UERC (Release of New LT Connections, Enhancement and Reduction of Loads) (First Amendment) Regulations, 2007.(Hindi) |
Accessible Version :
View(223 KB)
|
|
| UERC (Release of New LT Connections, Enhancement and Reduction of Loads) (First Amendment) Regulations, 2007.(English) |
Accessible Version :
View(269 KB)
|
|
| UERC (State Grid Code) Regulations, 2007.(Hindi) |
Accessible Version :
View(4 MB)
|
|
| UERC (State Grid Code) Regulations, 2007.(English) |
Accessible Version :
View(4 MB)
|
|
| UERC (Distribution Code) Regulations, 2007.(Hindi) |
Accessible Version :
View(3 MB)
|
|
| UERC (Distribution Code) Regulations, 2007.(English) |
Accessible Version :
View(3 MB)
|
|
| UERC (The Electricity supply code) Regulations, 2007.(English) |
Accessible Version :
View(3 MB)
|
|
| UERC (The Electricity supply code) Regulations, 2007.(Consolidated) |
Accessible Version :
View(520 KB)
|
|
| UERC (The Electricity supply code) Regulations, 2007.(Hindi) |
Accessible Version :
View(1 MB)
|
|
| UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) Regulations,2007.(Consolidated) |
Accessible Version :
View(330 KB)
|
|
| UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) Regulations,2007.(Hindi) |
Accessible Version :
View(234 KB)
|
|
| UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) Regulations,2007.(English) |
Accessible Version :
View(432 KB)
|
|
| UERC (Standards of Performance) Regulations, 2007.(Hindi) |
Accessible Version :
View(1 MB)
|
|
| UERC (Standards of Performance) Regulations, 2007.(English) |
Accessible Version :
View(697 KB)
|
|
| UERC (Terms and Conditions for Truing Up of Tariff) Regulations,2008.(Hindi) |
Accessible Version :
View(94 KB)
|
|
| UERC (Terms and Conditions for Truing Up of Tariff) Regulations,2008.(English) |
Accessible Version :
View(131 KB)
|
|
| UERC (Terms and Conditions for Determining Escalation Factor) Regulations, 2008.(Hindi) |
Accessible Version :
View(112 KB)
|
|
| UERC (Terms and Conditions for Determining Escalation Factor) Regulations, 2008.(English) |
Accessible Version :
View(139 KB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2008.(Hindi) |
Accessible Version :
View(219 KB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2008.(English) |
Accessible Version :
View(179 KB)
|
|
| UERC (Terms & Conditions for Determination of Transmission Tariff) (First Amendment) Regulations, 2008.(Hindi) |
Accessible Version :
View(60 KB)
|
|
| UERC (Terms & Conditions for Determination of Transmission Tariff) (First Amendment) Regulations, 2008.(English) |
Accessible Version :
View(72 KB)
|
|
| UERC (The Electricity Supply Code) (First Amendment) Regulations, 2008.(Hindi) |
Accessible Version :
View(633 KB)
|
|
| UERC (The Electricity Supply Code) (First Amendment) Regulations, 2008.(English) |
Accessible Version :
View(787 KB)
|
|
| UERC (Release of new HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.(Hindi) |
Accessible Version :
View(2 MB)
|
|
| UERC (Release of new HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.(Consolidated) |
Accessible Version :
View(451 KB)
|
|
| UERC (Release of new HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.(English) |
Accessible Version :
View(2 MB)
|
|
| Order on extension for a period up to 30.06.2010 of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004.(Hindi) |
Accessible Version :
View(16 KB)
|
|
| Order on extension for a period up to 31.12.2009 of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004.(English) |
Accessible Version :
View(18 KB)
|
|
| Order on extension for a period up to 30.06.2010 of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004.(English) |
Accessible Version :
View(65 KB)
|
|
| Order on Works Charges for Enhancement or Reduction of Contracted Load for HT & EHT Connections to be charged by the Distribution Licensee.(English) |
Accessible Version :
View(185 KB)
|
|
| Order on Works Charges for Enhancement or Reduction of Contracted Load for HT & EHT Connections to be charged by the Distribution Licensee.(Hindi) |
Accessible Version :
View(93 KB)
|
|
| UERC (The Electricity Supply Code) (Second Amendment) Regulations, 2009.(English) |
Accessible Version :
View(29 KB)
|
|
| UERC (The Electricity Supply Code) (Second Amendment) Regulations, 2009.(Hindi) |
Accessible Version :
View(27 KB)
|
|
| UERC (Guidelines for Appointment of Member & Procedure to be followed by the CGRF) (First Amendment) Regulations, 2009.(Hindi) |
Accessible Version :
View(76 KB)
|
|
| UERC (Guidelines for Appointment of Member & Procedure to be followed by the CGRF) (First Amendment) Regulations, 2009.(English) |
Accessible Version :
View(85 KB)
|
|
| Order on Extension for a period up to 30.09.2010 of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004.(Hindi) |
Accessible Version :
View(51 KB)
|
|
| Order on Extension for a period up to 30.09.2010 of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004.(English) |
Accessible Version :
View(66 KB)
|
|
| Order on Extension for a period up to 31.03.2011 of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004.(Hindi) |
Accessible Version :
View(51 KB)
|
|
| Order on Extension for a period up to 31.03.2011 of UERC (Terms & Conditions for Determination of Generation, Transmission & Distribution Tariff) Regulations, 2004.(English) |
Accessible Version :
View(65 KB)
|
|
| UERC(Conduct of Business) Regulations (Removal of Difficulties) (First) Order, 2010.(Hindi) |
Accessible Version :
View(25 KB)
|
|
| UERC(Conduct of Business) Regulations (Removal of Difficulties) (First) Order, 2010.(English) |
Accessible Version :
View(30 KB)
|
|
| UERC (Terms & Conditions of Intra-State Open Access) Regulations, 2010.(Hindi) |
Accessible Version :
View(2 MB)
|
|
| UERC (Terms & Conditions of Intra-State Open Access) Regulations, 2010.(English) |
Accessible Version :
View(9 MB)
|
|
| UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010, Removal of Difficulty (First) Order).(English) |
Accessible Version :
View(162 KB)
|
|
| UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (Second Amendment) Regulations, 2010.(Hindi) |
Accessible Version :
View(392 KB)
|
|
| UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (Second Amendment) Regulations, 2010.(English) |
Accessible Version :
View(409 KB)
|
|
| UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.(Hindi) |
Accessible Version :
View(1 MB)
|
|
| UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.(English) |
Accessible Version :
View(5 MB)
|
|
| UERC (Release of new HT & EHT Connections, Enhancement and Reduction of Loads) (First Amendment) Regulations, 2014.(English) |
Accessible Version :
View(72 KB)
|
|
| UERC (Release of new HT & EHT Connections, Enhancement and Reduction of Loads) (First Amendment) Regulations, 2014 (Hindi) |
Accessible Version :
View(63 KB)
|
|
| UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (Third Amendment) Regulations, 2017. (English) |
Accessible Version :
View(374 KB)
|
|
| UERC (Guidelines for Appointment of Members and Procedure to be followed by the Forum for Redressal of Grievances of the Consumers) (Third Amendment) Regulations, 2017. (Hindi) |
Accessible Version :
View(277 KB)
|