Suo-moto proceedings initiated by the Commission in the matter of Noncompliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the UERC
|
10/03/2025 |
Accessible Version :
View(141 KB)
|
Application seeking approval of the investment on the Construction of 33 kV line (Underground and Overhead Lines) in Haridwar and US Nagar District of Uttarakhand.
|
29/11/2022 |
Accessible Version :
View(349 KB)
|
Petition for approval of Provisional Tariff for Vyasi Hydro Power Project (2×60 MW) under Section 62 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines
|
22/11/2022 |
Accessible Version :
View(185 KB)
|
Petition for approval of Draft Amended Metering Communication & Data Acquisition Requirements (MCDAR) for Intra-State Power System of Uttarakhand after incorporating amendments
|
22/11/2022 |
Accessible Version :
View(93 KB)
|
Application seeking approval of the Commission on the draft Power Purchase Agreement for medium term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd
|
22/11/2022 |
Accessible Version :
View(165 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2022 to 31.12.2022.
|
15/11/2022 |
Accessible Version :
View(169 KB)
|
Petition seeking determination of project specific tariff for 1.5 MW (2 X 750 kW) Dunao Small Hydro Power Station under Section 62 and 86 of the Electricity Act, 2003 read with Regulation
|
11/11/2022 |
Accessible Version :
View(497 KB)
|
ANNEXURE-1
|
11/11/2022 |
Accessible Version :
View(397 KB)
|
Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP till 30.11.2022 or commissioning of 400 kV D/c Transmission line,
|
10/11/2022 |
Accessible Version :
View(178 KB)
|
Petition for approval of Provisional Tariff for Vyasi Hydro Power Project (2×60 MW) under Section 62 and 86 of the Electricity Act, 2003
|
09/11/2022 |
Accessible Version :
View(185 KB)
|
Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s
|
03/11/2022 |
Accessible Version :
View(177 KB)
|
Petition seeking approval of the Commission on Deviation in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost
|
28/10/2022 |
Accessible Version :
View(981 KB)
|
Petition seeking approval for increasing the Continuous Supply Surcharge (CSS) as approved by the Commission in the Tariff Order for FY 2022-23.
|
19/10/2022 |
Accessible Version :
View(847 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
19/10/2022 |
Accessible Version :
View(160 KB)
|
Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid
|
28/09/2022 |
Accessible Version :
View(76 KB)
|
Revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31.03.2022 for FY 2022-23.
|
27/09/2022 |
Accessible Version :
View(258 KB)
|
Waiver of supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj– Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity
|
27/09/2022 |
Accessible Version :
View(78 KB)
|
Petition for review of the Commission’s Order dated 22.06.2022 on application for approval of draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited
|
19/09/2022 |
Accessible Version :
View(176 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
|
19/09/2022 |
Accessible Version :
View(160 KB)
|
Waiver of Supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj–Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity
|
14/09/2022 |
Accessible Version :
View(220 KB)
|
Unplanned and irregular load shedding/curtailment of power by Uttarakhand Power Corporation Limited during the period 01st of March 2022 to 30th June 2022 and being continued till date.
|
12/09/2022 |
Accessible Version :
View(135 KB)
|
Petition seeking removal of difficulty in implementation of modified Time of Day metering as provided in clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23.
|
12/09/2022 |
Accessible Version :
View(621 KB)
|
Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Suringad-II Small Hydro Power Plant
|
02/09/2022 |
Accessible Version :
View(233 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2022 to 30.09.2022
|
29/08/2022 |
Accessible Version :
View(163 KB)
|
Petition seeking adjustment of tariff for 5 MW Tanga Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated due to the catastrophic damage caused
|
25/08/2022 |
Accessible Version :
View(87 KB)
|
Petition seeking adjustment of tariff for 5 MW Motighat Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated
|
25/08/2022 |
Accessible Version :
View(87 KB)
|
Petition seeking grant of permission to connect 33 kV dedicated line from 15 MW Captive Solar Power Plant to the stepdown side of 132/33 kV switchyard of Kashi Vishwanath Steels Pvt. Ltd.
|
22/08/2022 |
Accessible Version :
View(170 KB)
|
Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERC (Release of New LT Connections,
|
22/07/2022 |
Accessible Version :
View(177 KB)
|
Non-compliance of Sub-Section 3 of Section 43 of the Electricity Act, 2003 and Regulation 3.3.3 (17) & Regulation 3.3.3 (19) of UERC
|
22/07/2022 |
Accessible Version :
View(133 KB)
|
Work of Construction of 132 kV & 66 kV Bays and installation of 3×20 MVA, 132/66 kV Transformer at 132 kV Substation Simli.
|
20/07/2022 |
Accessible Version :
View(2 MB)
|
In the Matter of: Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC
|
20/07/2022 |
Accessible Version :
View(3 MB)
|
Petition for issuing necessary directions to UPCL to withdraw invoices issued against the Petitioner imposing 25% additional Temporary Supply Tariff
|
27/06/2022 |
Accessible Version :
View(208 KB)
|
Petition for review of the Commission’s Order dated 31.03.2022 on True up for FY 2020-21,Annual Performance Review for FY 2021-22 and Annual Revenue Requirement for FY 2022-23
|
29/05/2022 |
Accessible Version :
View(601 KB)
|
Suo-moto proceedings in the matter of applicability of Rate Schedule RTS-4A, Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017.
|
27/05/2022 |
Accessible Version :
View(276 KB)
|
Petition seeking extension of Control Period of the benchmark capital cost & generic tariff as approved by the Commission vide its order dated 11/05/2020, 30/09/2020 and 05/10/2020 till March 2023
|
22/05/2022 |
Accessible Version :
View(228 KB)
|
Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Limited for its Kaliganga-II Small Hydro Power Plant (2X2.25 MW).
|
22/05/2022 |
Accessible Version :
View(276 KB)
|
Application seeking approval of the Commission on the draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd.
|
22/05/2022 |
Accessible Version :
View(175 KB)
|
Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from Generating Stations operating in Ravi Basin
|
09/05/2022 |
Accessible Version :
View(241 KB)
|
Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar project of M/s Parihar Constructions.
|
05/05/2022 |
Accessible Version :
View(189 KB)
|
Petition for Approval of consolidated DPR amounting to Rs. 843.724 Crore funded through ADB, assuming 90% grant in loan component for transmission projects under UTSDIP Scheme.
|
26/04/2022 |
Accessible Version :
View(133 KB)
|
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2022-23
|
26/04/2022 |
Accessible Version :
View(811 KB)
|
Filing of Miscellaneous Petition, inter alia amongst other grounds concerning refund of Minimum Demand Charges (MDC)/ Late Payment Surcharge (LPS) charges by illegal disconnection
|
23/03/2022 |
Accessible Version :
View(203 KB)
|
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015
|
22/03/2022 |
Accessible Version :
View(143 KB)
|
Application seeking prior approval of the Commission on the draft short term Power Purchase Agreements between Uttarakhand Power Corporation Limited
|
10/03/2022 |
Accessible Version :
View(158 KB)
|
Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021 pertaining to submission of Periodical Reports
|
10/03/2022 |
Accessible Version :
View(161 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2022 to 31.03.2022.
|
09/03/2022 |
Accessible Version :
View(190 KB)
|
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2022 to 31.03.2022.
|
09/03/2022 |
Accessible Version :
View(190 KB)
|
Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity
|
03/03/2022 |
Accessible Version :
View(202 KB)
|
Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance
|
11/02/2022 |
Accessible Version :
View(174 KB)
|
Application seeking approval on the two Draft Power Purchase Agreements proposed to be entered into between UPCL and M/s Sravanthi Energy Pvt. Ltd & M/s Gama Infraprop Pvt. Ltd.
|
03/02/2022 |
Accessible Version :
View(141 KB)
|
Application seeking prior approval of Hon’ble Uttarakhand Electricity Regulatory Commission on the Power Purchase Agreement to be executed between UPCL & UJVN Ltd for Vyasi HEP (120 MW)
|
03/02/2022 |
Accessible Version :
View(211 KB)
|
Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s
|
03/02/2022 |
Accessible Version :
View(174 KB)
|
Application seeking approval on the Power Supply Agreements signed between UPCL and M/s Solar Energy Corporation of India (SECI).
|
03/02/2022 |
Accessible Version :
View(147 KB)
|
Application seeking prior approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s PTC India Ltd. on short term basis.
|
21/01/2022 |
Accessible Version :
View(129 KB)
|
Petition seeking utilisation of 220 kV S/C dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from small hydro projects operating in Ravi Basin
|
17/01/2022 |
Accessible Version :
View(283 KB)
|
Application seeking approval for the investment on the project covering the construction of 03 No. 33/11 kV Substation
|
03/01/2022 |
Accessible Version :
View(186 KB)
|