    Hearing Schedule

    Hearings/ Jangoshthi Schedule Year 2025-26
    Title Date Time Petitioner/ Respondents/parties

    Hearing in the matter of Petition for True-Up of Annual Fixed Cost (AFC) for FY 2024-25, Annual Performance Review for FY 2025-26, and Annual Revenue Requirement for FY 2026-27, for Budhil Hydro Electric Project of M/s Greenko Budhil Hydro Power Pvt. Ltd. under Section 62 and 86 of the Electricity Act, 2003 read with the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021 and UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024.

    24.03.2026 11:30 AM M/s Greenko Budhil Hydro Power Pvt. Ltd.,
    15th Floor, Hindustan Times House,
    18-20, Kasturba Gandhi Marg,
    New Delhi-110001.

    ……………..Petitioner

    Managing Director,
    Uttarakhand Power Corporation Ltd.,
    Victoria Cross Vijeta Gabar Singh Bhawan,
    Kanwali Road, Dehradun.

    ……………..Respondent

    Hearing in the matter of Petition filed by Indian Railways under Section 86(1)(c) & (k) of the Electricity Act, 2003 read with applicable provisions of the UERC OA Regulations, 2015 & CBR, seeking a declaration that all the drawl points of Railways within the state of Uttarakhand i.e., all the Railway Traction Sub-Stations connected directly with the STU may be treated as one “fragmented control area” and as a single entity for the purposes of scheduling, metering, energy accounting, deviation settlement, balancing, applicability of intra-state charges and losses, etc. in terms of the dispensation rendered by the Hon’ble CERC in Order dated 05.11.2015 in Petition No. 197/MP/2015. Further, seeking a declaration that post operationalization of open access Railway should not be treated as an embedded customer of the distribution licensee and no wheeling charges should be levied on it since its TSSs are connected directly with the STU and Railways will cease to be a consumer of UPCL”.

    24.03.2026 11:30 AM 1. Sr. DEE/TRF/ MB, DRM office, Moradabad, Northern Railway.

    ……………..Petitioner

    1. Chief Engineer, SLDC
    2. Managing Director, PTCUL
    3. Managing Director, UPCL

    ……………..Respondent (s)

    Hearing in the matter of filing petition Petition under Section 86(1)(f) read with Sections 86(1)(c) & (e) & Section 42 of the Electricity Act, 2003 compliance withs Regulation 8(2) of the UERC (Terms and Conditions of Open Access) Regulations, 2015 and Regulation 8 of the UERC (Green Energy Open Access) Regulations, 2023 by the respondents along with supporting affidavits.

    07.04.2026 11:30 AM 1. TVS Srichakra Limited & Ors.
    2. Evincea Renewables (Three) Private Limited
    3. Evincea Renewables (Six) Private Limited

    ……………..Petitioners

    &
    1. Uttarakhand Power Corporation Limited (UPCL)
    2. Power Transmission Corporation of Uttarakhand Ltd. (PTCUL)
    3. State Load Despatch Centre (SLDC)
    4. Uttarakhand Renewable Energy Development Agency. (UREDA)

    ……………..Respondent (s)

    Hearing on the application filed by M/s Galwalia Ispat Udyog (P) Ltd. in the matter of “State Transmission and Utility Charges being levied by Power Transmission Corporation of Uttarakhand Limited on open access power being purchased”.

    08.04.2026 11:30 AM M/s Galwalia Ispat Udyog (P) Ltd.,
    Narain Industrial Area, Bajpur Road,
    Kashipur, Udham Singh Nagar-244713
    Uttarakhand.

    ……………..Petitioner

    &
    1. Managing Director, PTCUL
    2. Chief Engineer, SLDC

    ……………..Respondent (s)