Close

    Hearing Schedule

    Hearings Schedule
    Title Date Time Petitioner/ Respondents/parties

    Hearing in the matter of Application seeking review/ modification in the Capacity Utilization Factor of Solar Plant as provided in UERC (Terms and other terms for supply of electricity from Renewable Energy Sources and non-fossil fuel based co-generation stations) Regulation, 2003.

    04.08.2026 11:30 AM Sh. Brhamesh Alipuria
    President,
    M/s RE Power Generators Society,
    Khasra No. 46 MI, House No. 1,
    Ekta Vihar, Panditwari,
    Dehradun-248007.

    ……………..Petitioner
    Managing Director,
    Uttarakhand Power Corporation Ltd.,
    Victoria Cross Vijeta Gabar Singh Bhawan,
    Kanwali Road, Dehradun.
    &
    Chief Project Officer,
    Uttarakhand Renewable Energy Development Agency (UREDA)
    Urja Park Campus, Industrial Area,
    Patel Nagar, Dehradun.

    ……………..Respondents

    Hearing in the matter of Petition filed under Regulation 9 of the UERC (Conduct of Business Regulation), 2014 read with Regulations 50 & 59, Sec. 142 of the Electricity Act, 2003 and Sec. 12 of the Contempt of Courts Act, 1927 initiating contempt proceedings against the alleged contemnor for non-compliance of the order dated 07.10.2024 of this Hon’ble Commission in petition no. 04 of 2024.

    04.08.2026 11:30 AM Smt. Minakshi Bhatt & Others

    ……………..Petitioner
    1. UPCL
    2. Panache Residents Welfare Association

    ……………..Respondents

    Hearing in the matter of Petition filed under Regulation 9 of the UERC (Conduct of Business Regulation), 2014 read with Regulations 59 & 66 and Order XXI of the Code of Civil Procedure, 1908 seeking enforcement of the order dated 07.10.2024 passed by this Hon’ble Commission in the above named petition.

    04.08.2026 11:30 AM Smt. Minakshi Bhatt & Others

    ……………..Petitioner
    1. UPCL
    2. Panache Residents Welfare Association

    ……………..Respondents

    Hearing in the matter of Application seeking review of the Order dated 04th June, 2026 passed by the Commission in the matter of review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2026-27.

    11.08.2026 11:30 AM M/s RE Power Generators Society,
    Khasra No. 46 MI, House No. 1,
    Ekta Vihar, Panditwari,
    Dehradun-248007.

    ……………..Petitioner
    Managing Director,
    Uttarakhand Power Corporation Ltd.,
    Victoria Cross Vijeta Gabar Singh Bhawan,
    Kanwali Road, Dehradun.

    ……………..Respondents

    Hearing in the matter of Petition under Sections 61, 62 and 86 of the Electricity Act, 2003 read with Regulations 50(6), 103(1), 104 of the UERC (Terms & conditions for determination of Multi Year Tariff Regulation, 2024 for recovery of energy charges due to shortfall in energy generation for reasons beyond the control of generating station during the FY 2025-26 in respect of Dhakrani, Kulhal, MB-II, Khatima and Vyasi Hydro Power Stations of UJVN Ltd.

    11.08.2026 11:30 AM Managing Director
    UJVN Ltd.,
    “Ujjwal”, Maharani Bagh,
    GMS Road, Dehradun -248006.

    ……………..Petitioner
    Managing Director,
    Uttarakhand Power Corporation Ltd.,
    Victoria Cross Vijeta Gabar Singh Bhawan,
    Kanwali Road, Dehradun.
    &
    Managing Director,
    Himachal Pradesh State Electricity Board Ltd.,
    Vidyut Bhawan, Shimla–171004,
    Himachal Pradesh.

    ……………..Respondents

    Hearing in the matter of Petition under Section 86 of the Electricity 2003 read with the liberty granted vide order dated 29.07.2025 passed by the Hon’ble Uttarakhand High Court in WPMS 1829/2021, seeking appropriate directions from this Commission for adjustment/ refund of the Transmission Charges collected by the Respondent viz., Power Transmission Corporation of Uttarakhand Limited in terms of the erstwhile 2nd proviso to Regulation 21(1)(b) of the UERC (Terms and Conditions of Intra-State Open Access) 2010 and the erstwhile 3rd proviso to Regulation 20 (1)(b) of the UERC (Terms and Conditions of Intra-State Open Access) 2015, alongwith applicable interest read with the final order dated 17.10.2023 passed by this Hon’ble Commission in Petition No. 30 of 2023.

    18.08.2026 11:30 AM M/s Bhilangana Hydro Power Ltd..

    ……………..Petitioner
    1. Power Transmission Corporation of Uttarakhand Ltd.
    2. Uttarakhand Power Corporation Ltd.

    ……………..Respondents

    Hearing in the matter of Petition under Section 86 (1)(f) and 86 (1)(k) of the Electricity Act, 2003 read with Article 8, 10, 12 and 13 of the Power Purchase Agreement dated 18.02.2021 executed between Bhilangana Hydro Power Ltd. and Uttarakhand Power Corporation Ltd. seeking appropriate direction for release of outstanding payment alongwith applicable Late Payment Surcharge towards the power supplied by BHPL to UPCL during the FY 2020-21.

    25.08.2026 11:30 AM M/s Bhilangana Hydro Power Ltd.,
    B-37, 3rd Floor, Sector 1,
    Noida – 201301,
    Gautam Budh Nagar,
    Uttar Pradesh.

    ……………..Petitioner
    Managing Director,
    Uttarakhand Power Corporation Ltd.,
    Victoria Cross Vijeta Gabar Singh Bhawan,
    Kanwali Road, Dehradun.
    &
    Managing Director,
    Power Transmission Corporation of Uttarakhand Ltd.,
    Vidyut Bhawan, Near I.S.B.T. Crossing,
    Saharanpur Road, Majra,
    Dehradun.

    ……………..Respondents

    Hearing in the matter of State Transmission and Utility Charges being levied by Power Transmission Corporation of Uttarakhand Limited on open access power being purchased.

    25.08.2026 11:30 AM M/s Galwalia Ispat Udyog (P) Ltd..

    ……………..Petitioner
    1. MD, Power Transmission Corporation of Uttarakhand Ltd. (PTCUL)
    2. Chief Engineer, SLDC

    ……………..Respondents

    Hearing in the matter of Petition filed by M/s Galwalia Ispat Udyog (P) Ltd. in the matter of “Additional Surcharge, Cross-Subsidy Surcharge, Electricity Duty and Green Cess being levied by UPCL on power purchased through open access from IEX and under group captive arrangement.

    08.09.2026 11:30 AM M/s Galwalia Ispat Udyog (P) Ltd.
    Narain Industrial Area, Bajpur Road,
    Kashipur, Udham Singh Nagar-244713

    ……………..Petitioner
    Managing Director,
    Uttarakhand Power Corporation Ltd.,
    VCV Gabar Singh Urja Bhawan,
    Kanwali Road, Dehradun

    ……………..Respondent